Please wait a minute...
浙江大学学报(工学版)
土木与交通工程     
下穿既有建筑期间盾构施工参数分析
张润峰1, 梁荣柱2,3 ,张献民1,薛新华4
1. 南京航空航天大学 民航学院 江苏 南京 210016; 2. 浙江大学 建筑工程学院 浙江 杭州 310058;3. 浙江大学 滨海和城市岩土工程研究中心 浙江 杭州 310058; 4. 四川大学 水利水电学院 四川 成都 610065
Analysis on shield construction parameters during down crossing existing buildings
ZHANG Run feng1, LIANG Rong zhu2,3, ZHANG Xian min1, XUE Xin hua4
1. College of Civil Aviation, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China; 2. College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China;3. Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China; 4. College of Water Resources and Hydropower, Sichuan University, Chengdu 610065, China
 全文: PDF(1944 KB)   HTML
摘要:

以杭州地铁二号线为对象,研究在盾构下穿既有建筑过程中盾构施工参数及姿态参数的变化规律. 基于盾构掘进参数及现场实测数据发现,在盾构到达既有房屋前,盾构土舱压力大于静止侧向土压力会致使房屋隆起变形;盾构刀盘回转方向与土舱压力具有相关性,当盾构刀盘顺时针回转时,左侧土压力大于右侧土压力,反之亦然.为降低盾构刀盘挤压效应,避免房屋过大隆起变形,盾构经历多次停机;反向回转盾构切口可调整盾体回转角;设定下区千斤顶推力大于上区千斤顶,其差值产生的纠偏力矩可有效地调整盾构俯仰角.

Abstract:

The law of shield construction parameters and attitude control are presented and interpreted by investigating  the Hangzhou metro Line 2 tunnel project. The monitored construction data and field measurements show that the heave of buildings occurs when the earth pressures of chamber are larger than the horizontal earth pressures in situ and the cutter head is in front of the buildings. There are certain relationships between the rotating direction and the earth pressures of chamber. When the cutter head rotates clockwise, the monitored left earth pressures are significantly larger than the right earth pressures, and vice versa.  Shield went doun for several times beneath shield driving in order to reduce the compressing effect caused by cutter head and avoide the larger heave of the buildings. The opposite rotating direction of cutter head helps to adjust the rolling of shield body. Set that the thrusts of down zone jacks is larger than that of upper zone jacks, the correction moments caused by the difference will effectively adjust the pitching angels during tunnlling in soft soils.

出版日期: 2016-09-18
:     
基金资助:

国家自然科学基金资助项目(51378463);国家自然科学基金高速铁路基础研究联合基金重点资助项目(U1234204).

作者简介: 张润峰(1979-),男,讲师,博士生.从事道路与铁道工程相关研究.ORCID:0000 0001 9876 0988. E-mail: cugzju@126.com
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  

引用本文:

张润峰, 梁荣柱,张献民,薛新华. 下穿既有建筑期间盾构施工参数分析[J]. 浙江大学学报(工学版), 10.3785/j.issn.1008-973X.2016.03.020.

ZHANG Run feng, LIANG Rong zhu, ZHANG Xian min, XUE Xin hua. Analysis on shield construction parameters during down crossing existing buildings. JOURNAL OF ZHEJIANG UNIVERSITY (ENGINEERING SCIENCE), 10.3785/j.issn.1008-973X.2016.03.020.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2016.03.020        http://www.zjujournals.com/eng/CN/Y2016/V50/I3/545

[1] MOLLON G, DIAS D, SOUBRA A H. Face stability analysis of circular tunnels driven by a pressurized shield [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2009, 136(1): 215-229.
[2] ANAGNOSTOU G, KOVARI K. Face stability conditions with earth pressure balanced shields [J]. Tunnelling and Underground Space Technology, 1996, 11(2): 165-173.
[3] WONG K S, NG C W W, CHEN Y M, et al. Centrifuge and numerical investigation of passive failure of tunnel face in sand [J]. Tunnelling and Underground Space Technology, 2012, 28(3): 297-303.
[4] 张凤祥, 朱合华,傅德明. 盾构隧道[M]. 北京:人民交通出版社, 2004:224-225.
[5] 王洪新. 土压平衡盾构刀盘挤土效应及刀盘开口率对盾构正面接触压力影响[J]. 土木工程学报,2009,42(7):113-118.
WANG Hong xin. Effect of cutter head compressing the front soil and influence of head aperture ratio on contact pressure of EPB shield to the front soil [J]. China Civil Engineering Journal,2009,42(7):113-118.
[6] SUGIMOTO M, SRAMOON A. Theoretical model of shield behavior during excavation. I: theory [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2002, 128 (2): 138-155.
[7] SRAMOON A, SUGIMOTO M. Theoretical model of shield behavior during excavation.Ⅱ: application [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2002,128(2): 156-165.
[8] SUGIMOTO M, SRAMOON A, KONIHI S et al. Simulation of shield tunneling behavior along a curved alignment in a multilayered ground [J]. Journal of Geotehnical and Geoenvironmental Engineering, 2007, 133(6): 684-694.
[9] YUE M ,WEI J, SUN W, GUO Z. Dynamic mechanism and key rectification techniques of shield machine in the vertical plane [C] ∥ 2nd International Conference on Intelligent Robotics and Applications, 2009: 412-422.
[10] SUN W, YUE M, WEI J. Relationship between rectification moment and angle of shield based on numerical simulation [J]. Journal of Central South University, 2012, 19(2): 517-521.
[11] YUE M, SUN W, HU P. Dynamic coordinated of attitude correction for the shield tunneling based on load observer [J]. Automation in Construction, 2012,24(24): 24-29.
[12] 张厚美,古力. 盾构机姿态参数的测量及计算方法研究[J]. 现代隧道技术,2004, 41(2): 13-20.
ZHANG Hou mei, GU Li. On the measurement and the method of computation of the posture parameters of shields [J]. Modern Tunnelling Technology. 2004, 41(2): 13-20.
[13] LEE K M, JI H W, SHEN C K, et al, Ground response to the construction of Shanghai Metro tunnel line 2 [J]. Soils and Foundations, 1999, 39(3): 113-134.
[14] 梁荣柱, 潘金龙, 林存刚, 等. 软土地区盾构施工沉降界限[J]. 浙江大学学报:工学版, 2014, 48(7): 1148-1154.
LIANG Rong zhu, PAN Jin long, LIN Cun gang, et al. Settlement boundary induced by shield tunnelling in soft ground [J]. Journal of Zhejiang University: Engineering Science, 2014, 48(7): 1148-1154.
[15] 林存刚,吴世明,张忠苗,等,盾构掘进速度及非正常停机对地面沉降的影响[J],岩土力学,2012,33(8):2472-2482.
LIN Cun gang, WU Shi ming, ZHANG Zhong miao, et al. Influences of shield advance rate and abnormal machine halt on tunnelling induced ground surface settlements [J]. Rock and Soil Mechanics. 2012,33(8):2472-2482.
[16] 梁荣柱,夏唐代,吴昊,等. 软土地区土压平衡盾构反扭矩分析[J]. 中南大学学报:自然科学版,2015,46(10): 3814-3821.
LIANG Rong zhu, XIA Tang dai, WU Hao, et al. Analysis of reverse torque of EPB shield tunnelling in soft ground [J]. Journal of Central South University: Science and Technology, 2015, 46(10): 3814-3821.
[17] 唐晓武,朱季,刘维,等. 盾构施工过程中的土体变形研究[J]. 岩石力学与工程学报, 2010, 29(2): 417-422.
TANG Xiao wu, ZHU Ji, LIU Wei, et al. Research on soil deformation during shield construction process [J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(2):417-422.
[18] LEE K M, ROWE R K, LO K Y. Subsidence owing to tunnelling. I. estimating the gap parameter [J]. Canadian Geotechnical Journal, 1992, 29(6): 929-940.

[1] 董凯, 赖俊英, 钱晓倩, 詹树林, 阮方. 夏热冬冷地区居住建筑水平式外遮阳节能效果[J]. 浙江大学学报(工学版), 2016, 50(8): 1431-1437.
[2] 李佳琦, 范利武, 俞自涛. 超亲水表面在淬火冷却过程中的沸腾传热特性[J]. 浙江大学学报(工学版), 2016, 50(8): 1493-1498.
[3] 江衍铭, 张建全, 明焱. 集合神经网络的洪水预报[J]. 浙江大学学报(工学版), 2016, 50(8): 1471-1478.
[4] 钟崴, 彭梁, 周永刚, 徐剑, 从飞云. 基于小波包分析和支持向量机的锅炉结渣诊断[J]. 浙江大学学报(工学版), 2016, 50(8): 1499-1506.
[5] 夏玉峰, 任莉, 叶彩红, 王力. 基于RSM的立柱加强板定位布局多目标优化[J]. 浙江大学学报(工学版), 2016, 50(8): 1600-1607.
[6] 李林玉, 吴张华, 余国瑶, 戴巍, 罗二仓. 直线压缩机电声转换特性的实验[J]. 浙江大学学报(工学版), 2016, 50(8): 1529-1536.
[7] 曲巍崴, 唐伟, 毕运波, 李少波, 罗水均. 避免强迫装配和提升效率的预连接工艺规划[J]. 浙江大学学报(工学版), 2016, 50(8): 1561-1569.
[8] 胡小东, 顾临怡, 张范蒙. 应用于数字变量马达的高速开关阀[J]. 浙江大学学报(工学版), 2016, 50(8): 1551-1560.
[9] 杨姝, 刘国平, 亓昌, 王大志. 金属空心球梯度泡沫结构抗冲击特性仿真与优化[J]. 浙江大学学报(工学版), 2016, 50(8): 1593-1599.
[10] 杨章, 童根树, 张磊. 对称布置2根单侧加劲肋的有效刚度[J]. 浙江大学学报(工学版), 2016, 50(8): 1446-1455.
[11] 蒋翔, 童根树, 张磊. 耐火钢-混凝土组合梁抗火性能试验[J]. 浙江大学学报(工学版), 2016, 50(8): 1463-1470.
[12] 单华峰, 夏唐代, 俞峰, 胡军华, 潘金龙. 地下增层开挖托换桩的屈曲稳定临界荷载分析[J]. 浙江大学学报(工学版), 2016, 50(8): 1425-1430.
[13] 辜天来,张帅,郑耀. 咽式进气道/等直隔离段的反压特性[J]. 浙江大学学报(工学版), 2016, 50(7): 1418-1424.
[14] 程时伟, 陆煜华, 蔡红刚. 移动设备眼动跟踪技术[J]. 浙江大学学报(工学版), 2016, 50(6): 1160-1166.
[15] 黄家辉, 冯冬芹. 广义收益信息物理系统脆弱性评估方法[J]. 浙江大学学报(工学版), 2016, 50(6): 1119-1125.