Please wait a minute...
工程设计学报  2018, Vol. 25 Issue (3): 315-320    DOI: 10.3785/j.issn.1006-754X.2018.03.010
建模、仿真、分析与决策     
考虑使用与维修优先权的冷贮备系统可靠性模型分析
谢经伟, 黎放, 陈童, 尹东亮
海军工程大学 管理工程与装备经济系, 湖北 武汉 430033
Analysis of cold standby system reliability model considering use and repair priority
XIE Jing-wei, LI Fang, CHEN Tong, YIN Dong-liang
Department of Management Engineering and Equipment Economics, Naval University of Engineering, Wuhan 430033, China
 全文: PDF(685 KB)   HTML
摘要:

针对装备系统中部件关键重要程度不同的情况,以具有使用与维修优先权的多部件冷贮备系统为研究对象,利用适用性较强的phase-type(PH)分布代替以往在可靠性建模中采取的指数分布、Weibull分布等典型分布,统一描述了系统各部件的寿命和维修时间,并建立了通用性更好的系统可靠性模型。在模型解析过程中,采用矩阵解析方法,获得了系统的可靠度函数、稳态可用度以及系统平均开工时间、平均停工时间等工程实践中常用的系统可靠性指标解析表达式,并利用算例验证了模型的适用性,讨论了贮备部件数量对系统可靠性指标的影响。研究结果表明,利用PH分布对具有使用和维修优先权的冷贮备系统进行可靠性解析建模,不仅具有良好的解析特性,而且能够有效地保证模型的适用性,在工程实践中具有良好的应用价值。

关键词: 优先权冷贮备系统phase-type分布可靠性    
Abstract:

Aiming at the problems that the parts of the equipment system had different critical importance, taking the cold storage system of multi-components with use and repair priority as the research object, a more generalized system reliability model was established by using the more applicability phase-type (PH) distribution instead of the exponential distribution and Weibull distribution in the reliability modeling to describe the service life and repair time of system components. By using matrix analysis method, the analytical expressions of the reliability function, steady state availability and mean up-time and mean down-time of the system were obtained. The example was used to verify the applicability of the model, and the influence of the number of spare parts on the system reliability index was discussed. The results showed that the reliability modeling of the cold storage system with use and repair priority using the PH distribution not only had good analytical properties, but also could effectively ensure the applicability of the model, which had good application value in engineering practice.

Key words: priority    cold standby    phase-type distribution    reliability
收稿日期: 2017-11-13 出版日期: 2018-06-28
CLC:  F254.3  
基金资助:

国家自然科学基金资助项目(71501183)

通讯作者: 黎放(1958-),男,湖南长沙人,教授,博士生导师,博士,从事可靠性理论、装备维修、装备保障指挥与装备综合管理等研究,E-mail:Lifang600@126.com,https://orcid.org/0000-0002-2391-8434     E-mail: Lifang600@126.com
作者简介: 谢经伟(1995-),男,湖南邵阳人,硕士生,从事系统可靠性研究,E-mail:xiejingwei@live.com,https://orcid.org/0000-0001-6384-8218
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  
谢经伟
黎放
陈童
尹东亮

引用本文:

谢经伟, 黎放, 陈童, 尹东亮. 考虑使用与维修优先权的冷贮备系统可靠性模型分析[J]. 工程设计学报, 2018, 25(3): 315-320.

XIE Jing-wei, LI Fang, CHEN Tong, YIN Dong-liang. Analysis of cold standby system reliability model considering use and repair priority[J]. Chinese Journal of Engineering Design, 2018, 25(3): 315-320.

链接本文:

https://www.zjujournals.com/gcsjxb/CN/10.3785/j.issn.1006-754X.2018.03.010        https://www.zjujournals.com/gcsjxb/CN/Y2018/V25/I3/315

[1] LAM Y. A maintenance model for two-unit redundant system[J]. Microelectronics and Reliability, 1997, 37(3):497-504.
[2] ZHANG Y L, WANG G. A deteriorating cold standby repairable system with priority in use[J]. European Journal of Operational Research, 2007, 183(1):278-295.
[3] LEUNG K N, ZHANG Y L, LAI K K. Analysis for a two dissimilar-component cold standby repairable system with repair priority[J]. Reliability Engineering and System Safety, 2011, 96(11):1542-1551.
[4] 曹晋华,程侃.可靠性数学引论[M].北京:高等教育出版社,2006:243-245. CAO Jin-hua, CHENG Kan. An introduction to mathematical of reliability[M]. Beijing:Higher Education Press, 2006:243-245.
[5] NAKAGAWA T, OSAKI S. Stochastic behaviour of a two-unit priority standby redundant system with repair[J]. Microelectronics Reliability, 1975, 14(3):309-313.
[6] 贾鹏茹,孟宪云,张晓爽,等.有优先权且有两不同修理设备的两部件冷贮备可修系统的可靠性分析[J].数学的实践与认识,2010,40(10):187-192. JIA Peng-ru, MENG Xian-yun, ZHANG Xiao-shuang, et al. Reliability analysis of cold standby repairable of two components with priority of work and maintenance[J]. Journal of Mathematics in Practice and Theory, 2010, 40(10):187-192.
[7] NEUTS M F, MEIER K S. On the use of phase type distributions in reliability modelling of systems with two components[J]. Operations Research-Spektrum, 1981, 2(4):227-234.
[8] FADDY M J. Phase-type distributions for failure times[J]. Mathematical and Computer Modelling, 1995, 22(10/12):63-70.
[9] MONTORO-CAZORLA D, PÉREZ-OCÓNB R. A deteriorating two-system with two repair modes and sojourn times phase-type distributed[J]. Reliability Engineering and System Safety, 2006, 91(1):1-9.
[10] LIU B L,CUI L R,WEN Y Q, et al. A cold standby repairable system with the repairman having multiple vacations and operational, repair, and vacation times following phase-type distributions[J]. Communications in Statistics-Theory and Methods, 2016, 45(4):850-858.
[11] 陈童,黎放,狄鹏.基于PH分布的n中取k系统可靠性模型研究[J].系统工程理论与实践,2015,35(1):260-266. CHEN Tong, LI Fang, DI Peng. The reliability analysis of k-out-of-n system based on phase-type distribution[J]. Systems Engineering Theory and Practice, 2015, 35(1):260-266.
[12] RIASCOS-OCHOA J, SANCHEZ-SILVA M, AKHAVAN-TABATAEI R. Reliability analysis of shock-based deterioration using phase-type distributions[J]. Probabilistic Engineering Mechanics, 2014, 38:88-101.
[13] 狄鹏.基于PH分布的舰船装备多状态系统可靠性模型研究[D].武汉:海军工程大学管理工程系,2014:7-11. DI Peng. Research on reliability for warship armament multi-state system on phase-type distribution[D]. Wuhan:Naval University of Engineering, Department of Management Engineering, 2014:7-11.
[14] HE Qi-ming. Fundamentals of matrix-analytic methods[M]. London:Springer, 2013:10-22.
[15] 田乃硕.休假随机服务系统[M].北京:北京大学出版社,2001:5-7. TIAN Nai-shuo. Stochastic service system with vacation policies[M]. Beijing:Peking University Press, 2011:5-7.
[1] 况雨春,钟辉,钟良春. 类圆弧线型螺杆马达的设计与研究[J]. 工程设计学报, 2023, 30(5): 640-649.
[2] 李江昊,肖文生,于文太,王鸿雁,刘顺庆,孙友福. 超深水打桩锤系统的可靠性分析与分配研究[J]. 工程设计学报, 2023, 30(4): 485-494.
[3] 郭鸿杰,梁淑雅,陈文华,钟立强,陈哲文,颜佳辉. 线簧丝倾角对线簧孔式电连接器贮存寿命的影响研究[J]. 工程设计学报, 2023, 30(3): 390-398.
[4] 张正峰,宋小雨,袁晓磊,陈文娟,张伟东. Al/CFRP混合薄壁结构耐撞性能可靠性优化设计[J]. 工程设计学报, 2022, 29(6): 720-730.
[5] 陈振, 李涛, 薛晓伟, 周阳, 敬爽, 陈言. 基于模糊综合评价法的可控震源振动器平板疲劳可靠性分析与优化[J]. 工程设计学报, 2021, 28(4): 415-425.
[6] 王艾伦, 刘乐, 刘庆亚. 基于Kriging代理模型的拉杆组合转子强度可靠性研究[J]. 工程设计学报, 2019, 26(4): 433-440.
[7] 崔国华, 崔康康, 吴海淼, 张艳伟, 刘健. 预应力钢筒混凝土管端口打磨机器人的压紧力可靠性分析[J]. 工程设计学报, 2018, 25(6): 647-654.
[8] 文瑞桥, 杨梦鸥, 刘涛, 张均富. 机器人的运动时变可靠性分析[J]. 工程设计学报, 2018, 25(1): 50-55.
[9] 陆凤仪, 赵科渊, 徐格宁, 戚其松. 基于多源信息融合及模糊故障树的小子样可靠性评估[J]. 工程设计学报, 2017, 24(6): 609-617.
[10] 张根保, 徐付伟, 冉琰, 章小刚. 机械结构相似度评价及可靠性预计研究[J]. 工程设计学报, 2017, 24(3): 264-272.
[11] 陈文华, 杜勝利, 杨帆, 潘骏, 钱萍. 分离脱落电连接器钢珠锁紧机构解锁可靠性分析[J]. 工程设计学报, 2017, 24(3): 280-285.
[12] 尹东亮, 黎放, 陈童. 基于PH分布的两部件并联系统可靠性模型分析[J]. 工程设计学报, 2016, 23(2): 130-135.
[13] 陈文华,郑朝朋,李奇志,潘 骏,贺青川,潘晓东. 基于Copula函数的2.5 MW风电齿轮箱齿轮可靠性分析[J]. 工程设计学报, 2015, 22(5): 425-430.
[14] 杨 超,狄 鹏,陈 童. 基于区间分析的舰船装备可靠性模糊分配方法[J]. 工程设计学报, 2015, 22(5): 317-323.
[15] 杨 超,狄 鹏,陈 童. 基于区间分析的舰船装备可靠性模糊分配方法[J]. 工程设计学报, 2015, 22(4): 317-323.