Please wait a minute...
浙江大学学报(工学版)  2018, Vol. 52 Issue (2): 240-246    DOI: 10.3785/j.issn.1008-973X.2018.02.005
机械与动力工程     
基于中断应急的集成弹性供应链网络
周健, 石德晓
同济大学 机械与能源工程学院, 上海 201800
Integrated resilient supply chain with contingency planning for supply disruption
ZHOU Jian, SHI De-xiao
School of Mechanical Engineering, Tongji University, Shanghai 201800, China
 全文: PDF(3436 KB)   HTML
摘要:

为了研究供应中断风险下多周期弹性供应网络的集成优化问题,建立集成供应者选择、生产配送调度的多级供应链模型.基于供应者的供应柔性和稳定性,提出供应中断发生时的应急计划策略,开发一个两阶段、双目标混合整数规划方法.2个冲突的目标是最小化供应链成本和最大化服务水平,配送方式是每一周期生产结束,立即配送到相应的配送中心.结果表明,集成决策可以在不同目标偏好下给出有效的解决方案,成本偏好的决策倾向于选择更少的、成本更低的供应者,服务水平偏好的倾向于更多的、更稳定的供应者.以供应柔性为基础的应急计划可以在供应中断发生时提供应急策略,在维持供应成本的同时有效地改善服务水平.

Abstract:

A multi-echelon supply chain model integrated with supplier selection, production and distribution scheduling was anstructed for an integrated decision study of the multi-period resilient supply chain under supply disruption. Contingency planning was considered based on supplier flexibility and reliability, when supply disruption happens. A two-stage, multi-periods, bio-objective mixed integer programming approach was presented to develop a flexible sourcing strategy under disruption. The two conflicted objectives are minimization of cost and maximization of service level. Once a period of production is finished, the products are immediately delivered to the corresponding distribution center. Results show that developing contingency plans using flexibility in suppliers' production capacity is an effective strategy for firms to mitigate the severity of disruptions. The cost-oriented portfolio is apt to select minority suppliers with lower cost, but the service-oriented supply portfolio is apt to select numerous suppliers with good stability. Contingency planning for during disruption can provide an effective contingency strategy to maintain supply chain cost and improve service level.

收稿日期: 2016-11-04 出版日期: 2018-03-09
CLC:  F224  
基金资助:

国家自然科学基金资助项目(71471135).

作者简介: 周健(1975-),男,副教授,从事供应链调度等研究.orcid.org/0000-0002-4149-8445.E-Mail:madeinchina@tongji.edu.cn
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
作者相关文章  

引用本文:

周健, 石德晓. 基于中断应急的集成弹性供应链网络[J]. 浙江大学学报(工学版), 2018, 52(2): 240-246.

ZHOU Jian, SHI De-xiao. Integrated resilient supply chain with contingency planning for supply disruption. JOURNAL OF ZHEJIANG UNIVERSITY (ENGINEERING SCIENCE), 2018, 52(2): 240-246.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2018.02.005        http://www.zjujournals.com/eng/CN/Y2018/V52/I2/240

[1] HOULIHAN J B. International supply chain management[J]. International Journal of Physical Distribution & Materials Management, 1985, 15(1):22-38.
[2] TANG S Y, GURNANI H, GUPTA D. Managing disruptions in decentralized supply chains with endogenous supply process reliability[J]. Production and Operations Management, 2014, 23(7):1198-1211.
[3] CHOPRA S, SODHI M S. Reducing the risk of supply chain disruptions[J]. MIT Sloan Management Review, 2014, 55(3):73.
[4] HOU J, ZENG A Z, ZHAO L. Coordination with a backup supplier through buy-back contract under supply disruption[J]. Transportation Research Part E:Logistics and Transportation Review, 2010, 46(6):881-895.
[5] GURNANI H, MEHROTRA A, RAY S. Supply chain disruptions:Theory and practice of managing risk[J]. Ssrn Electronic Journal,2011:1-19.
[6] ERENGÜÇ S, SIMPSON N C, VAKHARIA A J. Integrated production/distribution planning in supply chains:an invited review[J]. European Journal Of Operational Research, 1999, 115(2):219-236.
[7] LI K P, GANESAN V K, SIVAKUMAR A I. Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain[J]. International Journal of Production Research, 2005, 43(13):2671-2685.
[8] LEI L, LIU S, RUSZCZYNSKI A, et al. On the integrated production, inventory, and distribution routing problem[J]. ⅡE Transactions, 2006, 38(11):955-970.
[9] MERZIFONLUOGLU Y. Risk averse supply portfolio selection with supply, demand and spot market volatility[J]. Omega, 2015, 57:40-53.
[10] RUIZ-TORRES A J, Mahmoodi F. The optimal number of suppliers considering the costs of individual supplier failures[J]. Omega, 2007, 35(1):104-115.
[11] RUIZ-TORRES A J, Mahmoodi F, Zeng A Z. Supplier selection model with contingency planning for supplier failures[J]. Computers & Industrial Engineering, 2013, 66(2):374-382.
[12] SAWIK T. Integrated supply, production and distribution scheduling under disruption risks[J]. Omega, 2016, 62:131-144.

[1] 胡钢, 徐翔, 过秀成. 基于解释结构模型的复杂网络节点重要性计算[J]. 浙江大学学报(工学版), 2018, 52(10): 1989-1997.