工业工程与制造业信息化 |
|
|
|
|
基于延迟设计分离点的订单设计型产品配置设计 |
鲁玉军1,2,纪杨建1,祁国宁1, 唐任仲1 |
(1. 浙江大学 现代制造工程研究所,浙江 杭州310027; 2. 浙江理工大学 先进制造技术研究所,浙江 杭州 310018) |
|
Configuration design of engineering-to-order product based on postponement design decoupling point |
LU Yu-jun1,2, JI Yang-jian1, QI Guo-ning1, TANG Ren-zhong1 |
(1. Institute of Manufacturing Engineering, Zhejiang University, Hangzhou 310027, China;
2. Institute of Advanced Mechanical Technology, Zhejiang Sci-Tech University, Hangzhou 310018, China) |
引用本文:
鲁玉军, 纪杨建, 祁国宁, 等. 基于延迟设计分离点的订单设计型产品配置设计[J]. J4, 2009, 43(12): 2231-2236.
LU Yu-Jun, JI Yang-Jian, QI Guo-Ning, et al. Configuration design of engineering-to-order product based on postponement design decoupling point. J4, 2009, 43(12): 2231-2236.
链接本文:
http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2009.12.018
或
http://www.zjujournals.com/eng/CN/Y2009/V43/I12/2231
|
[1] LAU R, RONALD S M. Mass customization: the next industrial revolution [J]. Industrial Management, 1995, 37(5): 18-19.
[2]祁国宁, 顾新建, 谭建荣,等. 大批量定制技术及其应用 [M]. 北京: 机械工业出版社, 2003.
[3] MESIHOVIC S,MALMQVIST J. PDM system based support for the sales-delivery process of engineer-to-order products [C]//Proceedings Produktmodeller Linkping. Sweden: [s. n.], 2000: 157-172.
[4] DESIGN Power Inc. Instant engineering-to-order over the web [EB/OL]. [2005-06-10]. http:∥www.dp.com/pdf/customwise /CustomWise.pdf.
[5] JOSEPH N, XIE H. Product configurators pave the way for mass customization [EB/OL]. [2003-08-21].http:∥ www.ntrustin fotech.com/pdfs/art/doc23.pdf.
[6] STROM U, AXWORTHY A. Product configurators-the big picture [R]. USA: Design Power Inc., 2000.
[7] ENCOMPIX. Engineer-to-Order ERP now to include configurator [EB/OL]. [2005-05-30]. http:∥www.24-7presssrelea se.com/view_press_release.php?rID=5495.
[8] 张光鉴. 相似论 [M]. 南京:江苏科学出版社,1992.
[9] WIKNER J, RUDBERG M. Integrating production and engineering perspectives on the customer order decoupling point [J]. International Journal of Operation & Production Management, 2005, 25(7): 623-641.
[10] SCHOETTNER J. Rapid product developing method [R]. Germany: Engineering Consulting & Solutions, 1996.
[11] PRASSAD B. Concurrent engineering fundamentals: integrated product and process organization [M]. New Jersey: Prentice Hall, 1996.
[12] BSHARAH F, LESS M. Requirements and strategies for the retention of automotive product data [J]. Computer-Aided Design, 2000, 32(2):145-158.
[13] BRAIDEN P M, CAMERON N.S. Using business process re-engineering for the development of production efficiency in companies making engineered to order products [J]. International Journal of Production Economics, 2004, 89(3): 261-273.
[14] SONG D P, HICKS C,EARL C F. Due date planning in manufacturing systems with complex product structures and uncertain processing times [J]. International Journal of Production Economics, 2002, 76(3): 243-256.
[15] 鲁玉军, 祁国宁. 基于MC环境的面向订单的产品设计方法研究 [J]. 中国机械工程, 2006, 17 (22): 2354-2358.
LU Yu-jun, QI Guo-ning. Study on rapid design for engineering-to-order product in MC [J]. China Mechanical Engineering, 2006, 17(22): 2354-2358.
[16] 鲁玉军. 面向大批量定制的ETO产品配置设计方法研究 [D]. 杭州: 浙江大学, 2007.
LU Yu-jun. Research on strategy of configuration design of ETO product for mass customization [D]. Hangzhou: Zhejiang University, 2007: 25-44.
|
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|