Please wait a minute...
J4  2009, Vol. 43 Issue (12): 2231-2236    DOI: 10.3785/j.issn.1008-973X.2009.12.018
工业工程与制造业信息化     
基于延迟设计分离点的订单设计型产品配置设计
鲁玉军1,2,纪杨建1,祁国宁1, 唐任仲1
(1. 浙江大学 现代制造工程研究所,浙江 杭州310027; 2. 浙江理工大学 先进制造技术研究所,浙江 杭州 310018)
Configuration design of engineering-to-order product based on postponement design decoupling point
LU Yu-jun1,2, JI Yang-jian1, QI Guo-ning1, TANG Ren-zhong1
(1. Institute of Manufacturing Engineering, Zhejiang University, Hangzhou 310027, China;
2. Institute of Advanced Mechanical Technology, Zhejiang Sci-Tech University, Hangzhou 310018, China)
 全文: PDF(1361 KB)   HTML
摘要:

针对复杂订单设计型(ETO)产品定制设计周期长的不足,提出了一种支持ETO产品快速配置设计的方法.利用大批量定制设计原理和延迟设计分离点(PDDP),将组成ETO产品的零部件划分为不同定制深度的4种设计类型,使针对ETO产品的整体设计转变为对零部件的配置变型设计.通过将ETO产品定制设计过程划分为非精确配置过程和精确配置过程2个阶段,延迟了定制零部件在企业内部的设计过程,变反应式设计为预定式设计,降低了客户订单对产品设计的影响,缩短了定制设计周期和交货期.结合工业汽轮机转子为例说明了方法的有效性和可行性.

Abstract:

Complex engineering-to-order (ETO) product has long design cycle. A rapid configuration design method was presented to solve the problem. The components of ETO product were divided into four design types with different customized depth by utilizing the theory of design for mass customization(DFMC) and postponement design decoupling point (PDDP). Then design for ETO product itself can be converted into customized design for its components. The configuration design process of ETO product was divided into two phases, namely, inexact and exact configuration. Then design process of customized components in enterprise was effectively postponed and responded design was transformed into scheduled design. Thus customer order’s influence on design was decreased as possible and customized design cycle and lead time were shortened. An example of the rotor of industry turbine was given to verify the effectiveness of the method.

出版日期: 2010-01-16
:  TP 391  
基金资助:

国家“863”高技术研究发展计划资助项目(2007AA040607 );国家自然科学基金资助项目(50805133);浙江省自然科学基金资助项目(Y107575);浙江省教育厅高校科研计划资助项目(20070333).

通讯作者: 纪杨建, 男, 副教授.     E-mail: mejyj@zju.edu.cn
作者简介: 鲁玉军(1976-), 男, 新疆石河子人, 副教授, 博士, 主要从事大批量定制、PDM/PLM研究.
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  

引用本文:

鲁玉军, 纪杨建, 祁国宁, 等. 基于延迟设计分离点的订单设计型产品配置设计[J]. J4, 2009, 43(12): 2231-2236.

LU Yu-Jun, JI Yang-Jian, QI Guo-Ning, et al. Configuration design of engineering-to-order product based on postponement design decoupling point. J4, 2009, 43(12): 2231-2236.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2009.12.018        http://www.zjujournals.com/eng/CN/Y2009/V43/I12/2231


[1] LAU R, RONALD S M. Mass customization: the next industrial revolution
[J]. Industrial Management, 1995, 37(5): 18-19.

[2]祁国宁, 顾新建, 谭建荣,等. 大批量定制技术及其应用
[M]. 北京: 机械工业出版社, 2003.

[3] MESIHOVIC S,MALMQVIST J. PDM system based support for the sales-delivery process of engineer-to-order products
[C]//Proceedings Produktmodeller Linkping. Sweden:
[s. n.], 2000: 157-172.

[4] DESIGN Power Inc. Instant engineering-to-order over the web
[EB/OL].
[2005-06-10]. http:∥www.dp.com/pdf/customwise /CustomWise.pdf.

[5] JOSEPH N, XIE H. Product configurators pave the way for mass customization
[EB/OL].
[2003-08-21].http:∥ www.ntrustin fotech.com/pdfs/art/doc23.pdf.

[6] STROM U, AXWORTHY A. Product configurators-the big picture
[R]. USA: Design Power Inc., 2000.

[7] ENCOMPIX. Engineer-to-Order ERP now to include configurator
[EB/OL].
[2005-05-30]. http:∥www.24-7presssrelea se.com/view_press_release.php?rID=5495.

[8] 张光鉴. 相似论
[M]. 南京:江苏科学出版社,1992.

[9] WIKNER J, RUDBERG M. Integrating production and engineering perspectives on the customer order decoupling point
[J]. International Journal of Operation & Production Management, 2005, 25(7): 623-641.

[10] SCHOETTNER J. Rapid product developing method
[R]. Germany: Engineering Consulting & Solutions, 1996.

[11] PRASSAD B. Concurrent engineering fundamentals: integrated product and process organization
[M]. New Jersey: Prentice Hall, 1996.

[12] BSHARAH F, LESS M. Requirements and strategies for the retention of automotive product data
[J]. Computer-Aided Design, 2000, 32(2):145-158.

[13] BRAIDEN P M, CAMERON N.S. Using business process re-engineering for the development of production efficiency in companies making engineered to order products
[J]. International Journal of Production Economics, 2004, 89(3): 261-273.

[14] SONG D P, HICKS C,EARL C F. Due date planning in manufacturing systems with complex product structures and uncertain processing times
[J]. International Journal of Production Economics, 2002, 76(3): 243-256.

[15] 鲁玉军, 祁国宁. 基于MC环境的面向订单的产品设计方法研究
[J]. 中国机械工程, 2006, 17 (22): 2354-2358.
LU Yu-jun, QI Guo-ning. Study on rapid design for engineering-to-order product in MC
[J]. China Mechanical Engineering, 2006, 17(22): 2354-2358.

[16] 鲁玉军. 面向大批量定制的ETO产品配置设计方法研究
[D]. 杭州: 浙江大学, 2007.
LU Yu-jun. Research on strategy of configuration design of ETO product for mass customization
[D]. Hangzhou: Zhejiang University, 2007: 25-44.

[1] 赵建军,王毅,杨利斌. 基于时间序列预测的威胁估计方法[J]. J4, 2014, 48(3): 398-403.
[2] 崔光茫, 赵巨峰, 冯华君, 徐之海, 李奇, 陈跃庭. 非均匀介质退化图像快速仿真模型的建立[J]. J4, 2014, 48(2): 303-311.
[3] 张天煜, 冯华君, 徐之海, 李奇, 陈跃庭. 基于强边缘宽度直方图的图像清晰度指标[J]. J4, 2014, 48(2): 312-320.
[4] 刘中, 陈伟海, 吴星明, 邹宇华, 王建华. 基于双目视觉的显著性区域检测[J]. J4, 2014, 48(2): 354-359.
[5] 王相兵,童水光,钟崴,张健. 基于可拓重用的液压挖掘机结构性能方案设计[J]. J4, 2013, 47(11): 1992-2002.
[6] 王进, 陆国栋, 张云龙. 基于数量化一类分析的IGA算法及应用[J]. J4, 2013, 47(10): 1697-1704.
[7] 胡根生,鲍文霞,梁栋,张为. 基于SVR和贝叶斯方法的全色与多光谱图像融合[J]. J4, 2013, 47(7): 1258-1266.
[8] 刘羽, 王国瑾. 以已知曲线为渐进线的可展曲面束的设计[J]. J4, 2013, 47(7): 1246-1252.
[9] 吴金亮, 黄海斌, 刘利刚. 保持纹理细节的无缝图像合成[J]. J4, 2013, 47(6): 951-956.
[10] 陈潇红,王维东. 基于时空联合滤波的高清视频降噪算法[J]. J4, 2013, 47(5): 853-859.
[11] 朱凡,李悦,蒋 凯,叶树明,郑筱祥. 基于偏最小二乘的大鼠初级运动皮层解码[J]. J4, 2013, 47(5): 901-905.
[12] 吴宁, 陈秋晓, 周玲, 万丽. 遥感影像矢量化图形的多层次优化方法[J]. J4, 2013, 47(4): 581-587.
[13] 计瑜,沈继忠,施锦河. 一种基于盲源分离的眼电伪迹自动去除方法[J]. J4, 2013, 47(3): 415-421.
[14] 王翔,丁勇. 基于Gabor滤波器的全参考图像质量评价方法[J]. J4, 2013, 47(3): 422-430.
[15] 童水光, 王相兵, 钟崴, 张健. 基于BP-HGA的起重机刚性支腿动态优化设计[J]. J4, 2013, 47(1): 122-130.