[1] 孟祥泽,韩建慧.电站锅炉压力容器事故案例分析与预防[M].北京:中国水利水电出版社,2007: 14-71. [2] American Petroleum Institute. Riskbased inspection base resource document, API 581[S]. 1st ed. Washington:American Petroleum Institute, 2000. [3] American Petroleum Institute. Riskbased inspection, API 580 [S]. Washington:American Petroleum Institute, 2002. [4] 邵松伟.RBI技术在电站锅炉系统中的应用研究[D].兰州:兰州理工大学,2009. SHAO Songwei. Research on the application of RBI technology for the boiler system in power plant [D]. Lanzhou: Lanzhou University of Technology, 2009. [5] 郑世津.国外锅炉炉管泄漏防治工作发展综述及启示[J].电站系统工程,2004, 20(3): 11-14. ZHENG Shijin. Development of preventing boiler tube failure BTF) at abroad and revelation [J]. Power System Engineering, 2004, 20(3): 11-14. [6] 杨震.电站锅炉炉管失效机理和提高可靠性的措施[J]. 锅炉技术, 2001, 32(12): 1-7. YANG Zhen. Mechanism for utility boiler tube failure and measures to improve reliability [J]. Boiler Technology, 2001, 32(12): 1-7. [7] 纪冬梅,施睿贇,杨森.亚临界锅炉后屏过热器12Cr1MoV炉管的剩余寿命预测[J].压力容器,2008, 25(9): 11-14. JI Dongmei, SHI Ruiyun, YANG Sen. Life prediction of 12Cr1MoV rear platen superheat boiler tube in a power plant [J]. Pressure Vessel Technology, 2008, 25(9): 11-14. [8] 王小辉,刘钧泉.一段转化炉高温炉管剩余寿命评估[J].石油化工设备,2008, 37(2): 73-77. WANG Xiaohui, LIU Junquan. Residual life evaluation of high temperature tubes in primary reformer [J]. PetroChemical Equipment, 2008, 37(2): 73-77. [9] GIRIBONE R, VALETTE B. Principles of failure probability assessment (PoF) [J]. International Journal of Pressure Vessels and Piping, 2004(7): 797-806. [10] HARALD K. Conditional firstorder secondmoment method and its application to the quantification of uncertainty in groundwater modeling [J]. Water Resources Research, 2002, 38(4): 1-14. [11] 傅敏,岳增武,雒利勇,等.锅炉省煤器的飞灰磨损状态及材料耐磨性能浅析[J].山东电力技术, 2000(5): 14-16. FU Min, YUE Zengwu, LUO Liyong, et al. Erosion states on the boiler economizer by fly ash and the erosion resistant ability of materials [J]. Shandong Electric Power, 2000(5): 14-16. [12] 岑可法,樊建人,池作和,等.锅炉和热交换器的积灰、结渣、磨损和腐蚀的防止原理与计算[M].北京:科学出版社, 1994: 424. [13] American Petroleum Institute. Calculation of heater tube thickness in petroleum refineries. API 530 [S]. 5th ed. Washington: API, 2003. [14] SANTOSH A, VINODA G, SHRIVASTAVA O P. Reliability analysis of pipelines carrying H2S for risk based inspection of heavy water plants [J]. Reliability Engineering and System Safety, 2006, 91(2): 163-170. [15] SCHRODER H C, KAUER R. Regulatory requirements related to riskbased inspection and maintenance [J]. International Journal of Pressure Vessels and Piping, 2004, 81(10/11): 847-854. [16] STIRLING A. Risk at a turning point [J]. Journal of Environmental Medicine, 1999, 1(2): 119-126. [17] 杨卫娟,周志军,刘茂省,等.锅炉低NOx燃烧中的三次风运行优化[J].浙江大学学报:工学版, 2008, 42(7): 1227-1230, 1270. YANG Weijuan, ZHOU Zhijun, LIU Maosheng, et al. Tertiary air operation optimization aiming at low NOx combustion in boiler [J]. Journal of Zhejiang University:Engineering Science, 2008, 42(7): 1227-1230, 1270. [18] 郭雷.电站锅炉冲蚀磨损机理及材料防磨性能的试验研究[D].太原:太原理工大学,2007. GUO Lei. An experimental study on the erosion mechanism in power station and the antierosion performance of materials [D]. Taiyuan: Taiyuan University of Technology, 2007. |