|
2014, Vol. 48(10): 1809-1815 DOI: 10.3785/j.issn.1008-973X.2014.10.014 | ||
Constant-force jack unloading method for removing temporary supports from large-span steel roof |
||
GUO Xiao-nong1, YANG Shang-fei1, LUO Yong-feng1, QIU Li-qiu1, YU Zheng-hua2, ZHENG Xiang-jie2 |
||
1. Department of Building Engineering, Tongji University, Shanghai 200092, China;2. Shanghai Mechanized Construction Group Limited Company, Shanghai 200439, China | ||
Received null Revised null | ||
Supporting info | ||
null | ||
|