[1] 赵诗奎. 基于新型邻域结构的混合算法求解作业车间调度[J]. 机械工程学报, 2016, 52(9):141-150 ZHAO Shi-kui. A hybrid algorithm based on the new neighborhood structure to solve the job shop scheduling[J]. Journal of Mechanical Engineering, 2016, 52(9):141-150
[2] 张梅, 吴凯华, 胡跃明. 基于改进教学算法的车间作业调度问题[J]. 控制与决策, 2017, 32(2):349-357 ZHANG Mei, WU Kai-hua, HU Yue-ming. The job shop scheduling based on improved teaching algorithm[J]. Control and Decision, 2017, 32(2):349-357
[3] SHAHRABI J, ADIBI M A, MAHOOTCHI M. A reinforcement learning approach to parameter estimation in dynamic job shop scheduling[J]. Computer and Industrial Engineering, 2017, 110:75-82.
[4] ASADZADEH L. A parallel artificial bee colony algorithm for the job shop scheduling problem with a dynamic migration strategy[J]. Computers and Industrial Engineering, 2016, 102:359-367.
[5] ALLAHVERDI A. A survey of scheduling problems with no-wait in process[J]. European Journal of Operational Research, 2016, 255(3):665-686.
[6] LIAW C F. An efficient simple metaheuristic for minimizing the makespan in two-machine no-wait job shops[J]. Computers and Operations Research, 2008, 35(10):3276-3283.
[7] SAMARGHANDI H, ELMEKKAWY T Y. Two-machine no-wait job shop problem with separable setup times and single-server constraints[J]. International Journal of Advanced Manufacturing Technology, 2013, 65(1-4):295-308.
[8] AITZAI A, BENMEDJDOUB B, BOUDHAR M. Branch-and-bound and PSO algorithms for no-wait job shop scheduling[J]. Journal of Intelligent Manufacturing, 2016, 27(3):679-688.
[9] LI X, XU H, LI M. A memory-based complete local search method with variable neighborhood structures for no-wait job shops[J]. International Journal of Advanced Manufacturing Technology, 2016, 87(5-8):1401-1408.
[10] KOULAMAS C, PANWALKAR S S. The proportionate two-machine no-wait job shop scheduling problem[J]. European Journal of Operational Research, 2016, 252(1):131-135.
[11] 宁涛, 王旭坪, 焦璇. 基于混沌量子算法和MAGTD的多目标FJSP求解策略[J]. 运筹与管理, 2017, 26(1):18-24 NING Tao, WANG Xu-ping, JIAO Xuan. Multi-objective FJSP strategy based on chaotic quantum algorithm and MAGTD[J]. Operations Research and Management Science, 2017, 26(1):18-24
[12] 徐华, 张庭. 混合离散蝙蝠算法求解多目标柔性作业车间调度[J]. 机械工程学报, 2016, 52(18):201-212. XU Hua, ZHANG Ting. Hybrid discrete bat algorithm to solve multi-objective flexible job shop scheduling[J]. Journal of Mechanical Engineering, 2016, 52(18):201-212.
[13] 仲于江, 杨海成, 莫蓉, 等. 基于小生境粒子群算法的柔性作业车间调度优化方法[J]. 计算机集成制造系统, 2015, 21(12):3231-3238 ZHONG Yujiang, YANG Hai-cheng, MO Rong, et al. Flexible job shop scheduling optimization method based on small habitat particle swarm optimization algorithm[J]. Computer Integrated Manufacturing Systems, 2015, 21(12):3231-3238
[14] 蒋增强, 左乐. 低碳策略下的多目标柔性作业车间调度[J]. 计算机集成制造系统, 2015, 21(4):1023-1031 JIANG Zeng-qiang, ZUO Le. Multi-objective flexible job shop scheduling with low carbon strategy[J]. Computer Integrated Manufacturing Systems, 2015, 21(4):1023-1031
[15] 高丽, 周炳海, 杨学良, 等. 基于多规则资源分配的柔性作业车间调度问题多目标集成优化方法[J]. 上海交通大学学报, 2015, 49(8):1191-1198 GAO Li, ZHOU Bing-hai, YANG Xue-liang, et al. Multi-objective integration optimization method for flexible job shop scheduling based on multi-rule resource allocation[J]. Journal of Shaihai Jiaotong University, 2015, 49(8):1191-1198
[16] 张国辉. DBR理论求解柔性作业车间调度问题[J]. 运筹与管理, 2016, 25(1):53-58 ZHANG Guo-hui. Solving flexible job shop scheduling problem with DBR theory[J]. Operations Research and Management Science, 2016, 25(1):53-58
[17] 朱伟. 基于规则导向的柔性作业车间多目标动态调度算法[J]. 系统工程理论与实践, 2017, 37(10):2690-2699 ZHU Wei. Multi-objective dynamic scheduling algorithm for flexible job shop based on rule-oriented[J]. System Engineering Theory and Practice, 2017, 37(10):2690-2699
[18] 肖华军, 张超勇, 孟磊磊, 等. 基于混合化学反应算法的柔性作业车间调度研究[J]. 计算机集成制造系统, 2018, 24(9):1-21 XIAO Hua-jun, ZHANG Chao-yong, MENG Lei-lei, et al. Flexible job shop scheduling research based on hybrid chemical reaction algorithm[J]. Computer Integrated Manufacturing Systems, 2018, 24(9):1-21
[19] 田旻, 刘人境. 分层混合遗传算法求解柔性作业车间调度问题[J]. 工业工程与管理, 2017, 22(5):32-39 TIAN Wen, LIU Ren-jing. A hierarchical hybrid genetic algorithm to solve the flexible job shop scheduling problem[J]. Industrial Engineering and Management, 2017, 22(5):32-39
[20] 李聪波, 沈欢, 李玲玲, 等. 面向能耗的多工艺路线柔性作业车间分批优化调度模型[J]. 机械工程学报, 2017, 53(5):12-23 LI Cong-bo, SHEN Huan, Li Ling-ling, et al. A batch optimization scheduling model for multi-process flexible job shop oriented to energy consumption[J]. Journal of Mechanical Engineering, 2017, 53(5):12-23
[21] PEZZELLA F, MORGANTI G, CIASCHETTI G. A genetic algorithm for the flexible job-shop scheduling problem[J]. Computers and Operations Research, 2008, 35(10):3202-3212.
[22] ROSHANAEI V, AZAB A, ElMARAGHY H. Mathematical modelling and a meta-heuristic for flexible job shop scheduling[J]. International Journal of Production Research, 2013, 51(20):6247-6274.
[23] RAAYMAKERS W H M, HOOGEVEEN J A. Scheduling multipurpose batch process industries with no-wait restriction by simulated annealing[J]. European Journal of Operational Research, 2000, 126(1):131-151.
[24] VAN DEN AKKER J M, HOOGEVEEN J A, VAN DEN VELDE S L. Parallel machine scheduling by column generation[J]. Operations Research, 1999, 47(6):862-872.
[25] HUANG YUEHMIN, SHIAU DERFANG. Combined column generation and constructive heuristic for a proportionate flexible flow shop scheduling[J]. International Journal of Advanced Manufacturing Technology, 2008, 38(7/8):691-704. |