Please wait a minute...
J4  2009, Vol. 43 Issue (10): 1823-1827    DOI: 10.3785/j.issn.1008-973X.2009.10.014
    
Numerical parameter design and calculation of lean production dashboard
WANG Zhi-guo, TANG Ren-zhong
(Institute of Manufacturing Engineering, Zhejiang Province Key Laboratory of Advanced Manufacturing
Technology, Zhejiang University, Hangzhou 310027,China)
Download:   PDF(1975KB) HTML
Export: BibTeX | EndNote (RIS)      

Abstract  

A lean visual dashboard was designed based on the management theory of lean production dashboard (LPD). The parameter index system of the visual dashboard was established on the basis of analyzing the content and selection principle of the dashboard’s parameter index. Combined with the workstation information model and the real-time data acquisition of parameter index system of the dashboard, a calculation model of LPD parameter index was developed through studying the processes from collecting data to displaying parameter. The method was applied to the assembly production of toy robots. Results show that the parameter index system of LPD is reasonable and the calculation model is feasible.



Published: 29 November 2009
CLC:  TP 30  
  TH 122  
Cite this article:

WANG Zhi-Guo, TANG Lin-Zhong. Numerical parameter design and calculation of lean production dashboard. J4, 2009, 43(10): 1823-1827.

URL:

http://www.zjujournals.com/eng/10.3785/j.issn.1008-973X.2009.10.014     OR     http://www.zjujournals.com/eng/Y2009/V43/I10/1823


车间生产精益驾驶舱数显参量设计与计算

基于车间生产精益驾驶舱的管理思想,设计了精益驾驶舱仪表盘.在分析仪表盘设计参量指标内容和选取原则的基础上,构建仪表盘参量指标体系.结合工位信息模型、车间工位级实时数据采集以及现场生产管理仪表盘参量指标体系,分析从可采集的车间生产现场数据到生产系统运作参数设计过程,提出驾驶舱参量指标的计算模型——“数据-参量转换公式组”.以某玩具机器人装配生产过程为例开展了实例研究,从而验证了指标体系结构的合理性和计算模型的有效性.

[1] 陈蔚芳,彭昱,史建新.基于条码技术的在制品生产过程管理[J].中国机械工程,2006,17(13):13841387.
CHEN Wei-fang,PENG Yu,SHI Jian-xin. Workpiece-in-process management based on barcode technique[J]. China Mechanical Engineering, 2006,17(13):13841387.
[2] 李凌丰,谭建荣. 制造系统的对象与行为建模[J]. 机械工程学报,1998,34(2):813.
LI Ling-feng, TAN Jian-rong. Object and behavior modeling for manufacture system[J]. Chinese Journal of Mechanical Engineering,1998,34(2):813.
[3] TAYLAN O. Neural and fuzzy model performance evaluation of a dynamic production system[J]. International Journal of Production Research ,2006,44 (6): 10931105.
[4] TELUKDARIE A, BROUCKAERT B M, HAUNG Y. A case study on artificial intelligence based cleaner production evaluation system for surface treatment facilities[J]. Journal of Cleaner Production,2006,14( 18): 16221634.
[5] 狄瑞坤,蒋君侠.集成精益生产和敏捷制造的混合供应链[J].浙江大学学报:工学版,2002,36(3):269272.
DI Rui-kun, JIANG Jun-xia. Hybrid supply chain integrated lean production and agile manufacturing. Journal of Zhejiang University: Engineering Science, 2002,36(3):269272.
[6] TOLEDO J, MULLER H, BUYTAERT J, et al. A plug and play approach to data acquisition[J].IEEE Transactions on Nuclear Science, 2002,49(3):11901194.
[7] SAYGIN C, SARANGAPANI J. RFID on the manufacturing shop floor: applications and challenges[C]∥ IIE Annual Conference & Exposition. Orlando,Florida:[s.n.],2006.
[8] 王文铭,孙在冠,石二勇.采油企业数据仓库框架体系结构研究[J].石油大学学报:自然科学版,2005,29(5):139143,146.
WANG Wen-ming,SUN Zai-guan,SHI Er-yong. Researches of oil production enterprise data warehouse framework\[J\].Journal of the University of Petroleum: Edition of Natural Science, 2005,29(5):139143,146.
[9] 潘家绍,曹德弼.现代生产管理学[M].北京:清华大学出版社,2003.

[1] YE Xia, XIN Yuan, LIU Yong, LIU Peng. Stream Prefetcher based on MediaDSP[J]. J4, 2014, 48(2): 268-278.
[2] LIU Jia-hai, YANG Mao-lin, LEI Hang, LIAO Yong. Multicore real-time task allocation algorithms with shared resource constraints[J]. J4, 2014, 48(1): 113-117.
[3] QUAN Li, CHENG Ai-lian, PAN Yun, DING Yong, YAN Xiao-lang. Bypassed channels based differentiated service implementation method for network-on-chip[J]. J4, 2013, 47(6): 957-968.
[4] ZHAO Shi-kui, FANG Shui-liang, GU Xin-jian. Genetic algorithm with new initialization mechanism for flexible job shop scheduling[J]. J4, 2013, 47(6): 1022-1030.
[5] WANG You-wei, LIU Yuan-ning, ZHU Xiao-dong. Novel semi-fragile watermarking algorithm for image content authentication[J]. J4, 2013, 47(6): 969-976.
[6] SONG Jie, HOU Hong-ying, WANG Zhi, ZHU Zhi-liang. Improved energy-efficiency measurement model for cloud computing[J]. J4, 2013, 47(1): 44-52.
[7] ZHANG Jun-chao, YUE Mao-xiong, LIU Hua-feng. Dynamic PET image reconstruction with Geometrical structure
prior constraints
[J]. J4, 2012, 46(6): 961-966.
[8] LIU Yi, LI Ping, GAO Zeng-liang. Quality prediction of hot metal in blast furnace using improved
support vector regression
[J]. J4, 2012, 46(5): 830-836.
[9] YU Hai-qing, LIU Yi, CHEN Kun, JI Jun1, LI Ping. Robust recursive kernel learning modeling method with
application to blast furnace
[J]. J4, 2012, 46(4): 705-711.
[10] ZHANG Zhen, LI Shan-ping. DVFS-aware CPU service time estimation method[J]. J4, 2012, 46(4): 725-733.
[11] FANG Shui-liang, YAO Yan-fei, ZHAO Shi-kui. Improved genetic algorithm for flexible job shop scheduling[J]. J4, 2012, 46(4): 629-635.
[12] LIU Jia-hai, YANG Mao-lin. Fair scheduling algorithm on multi-core platforms based platforms[J]. J4, 2011, 45(9): 1566-1570.
[13] LI Zhuo, CHEN Jian, JIANG Xiao-ning, ZENG Xian-ting, PAN Xue-zeng. Blind JPEG steganalysis based on multi-domain features[J]. J4, 2011, 45(9): 1528-1538.
[14] XU Ke-lin, ZHU Wei, LI Yan-bing. Integrated decision model for goods loading-transportation
and its genetic algorithm
[J]. J4, 2011, 45(9): 1630-1635.
[15] CAO Xiao-yang, PAN Yun, YAN Xiao-lang, HUAN Ruo-hong. Systolic structure for DCT with low area-time complexity[J]. J4, 2011, 45(4): 656-659.