浙江大学学报(工学版)  2021, Vol. 55 Issue (1): 46-54    DOI: 10.3785/j.issn.1008-973X.2021.01.006
土木工程、交通工程、水利工程     
装配式桥墩温度应力分析与裂纹控制
李中南(),朱海波,赵阳,罗雪,徐荣桥*()
浙江大学 土木工程系,浙江 杭州 310058
Thermal stress analysis and crack control of assembled bridge pier
Zhong-nan LI(),Hai-bo ZHU,Yang ZHAO,Xue LUO,Rong-qiao XU*()
Department of Civil Engineering, Zhejiang University, Hangzhou 310058, China
 全文: PDF(5844 KB)   HTML
摘要:

以某在建跨海大桥为例,通过数值仿真分析预制桥墩在与现浇承台连接施工时的温度应力及其影响因素,结合海上施工条件提出裂缝控制措施并进行现场试验. 分析结果表明,填芯混凝土热膨胀是预制桥墩温度应力的主要因素,温度梯度为次要因素. 混凝土入模温度从10 °C提高到40 °C,最大拉应力增加15.4%. 作为单项措施,设置隔热缓冲层的控制效果最佳,其次为冷却水管、优化混凝土配合比、分层施工和应力消散孔,外壁保温与内腔通风措施的效果较差. 提出的裂纹控制方案是采用优化混凝土配合比,且分3层浇筑混凝土,第1层和第2层分别设置隔热缓冲层和应力消散孔,通过现场试验验证了该方案可以有效地控制裂纹.

关键词: 装配化施工预制桥墩温度应力裂纹控制现场试验    
Abstract:

A cross-sea bridge under construction was considered as an example. The thermal stress and its influencing factors of the prefabricated bridge pier during connection with the cast-in-place cap were analyzed through numerical simulation. Crack control measures were proposed and field tests were conducted combined with the offshore construction conditions. Results show that the main factor causing thermal stress is the thermal expansion of the core-filled concrete, and the secondary factor is the temperature gradient of the pier. The maximum tensile stress increases by 15.4% when the concrete pouring temperature is increased from 10 °C to 40 °C. The control effect of setting the thermal insulation buffer layer is the best as a single measure, followed by the cooling water pipes, optimization of concrete proportion, layered construction and stress dissipation hole. The effect of outer insulation and inner cavity ventilation is poor. The recommended strategy includes optimizing concrete proportion and pouring concrete in three layers, in which the first layer and the second layer are respectively provided with a thermal insulation buffer layer and a stress dissipation hole. The results of field tests verify the effectiveness of the recommended strategy for crack suppression.

Key words: assembly construction    prefabricated bridge pier    thermal stress    crack control    field test
收稿日期: 2020-01-11 出版日期: 2021-01-05
CLC:  U 443  
基金资助: 国家自然科学基金资助项目(51478422)
通讯作者: 徐荣桥     E-mail: lizhongnan6@163.com;xurongqiao@zju.edu.cn
作者简介: 李中南(1994―),男,硕士生,从事桥梁工程的研究. orcid.org/0000-0002-9191-5112. E-mail: lizhongnan6@163.com
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
作者相关文章  
李中南
朱海波
赵阳
罗雪
徐荣桥

引用本文:

李中南,朱海波,赵阳,罗雪,徐荣桥. 装配式桥墩温度应力分析与裂纹控制[J]. 浙江大学学报(工学版), 2021, 55(1): 46-54.

Zhong-nan LI,Hai-bo ZHU,Yang ZHAO,Xue LUO,Rong-qiao XU. Thermal stress analysis and crack control of assembled bridge pier. Journal of ZheJiang University (Engineering Science), 2021, 55(1): 46-54.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2021.01.006        http://www.zjujournals.com/eng/CN/Y2021/V55/I1/46

材料 ρB/(kg·m?3)
碎石(5~16 mm) 314
碎石(16~25 mm) 734
中砂 759
PⅡ 52.5水泥 186
粉煤灰 83
矿粉 145
145
减水剂(标准型) 4.14
表 1  填芯混凝土初始配合比
图 1  桥墩与承台一般构造
图 2  连接部位详细构造
图 3  温度应力数值分析有限元模型
图 4  温度实测值和计算值的对比
图 5  桥墩表面主拉应力分布
图 6  热膨胀与温度梯度对拉应力的影响
图 7  混凝土入模温度对拉应力的影响
配合比 ρ(水泥)/
(kg·m?3)
ρ(粉煤灰)/
(kg·m?3)
ρ(矿粉)/
(kg·m?3)
${\theta _{\rm{s}}}$ /°C m
配合比1 160 120 120 59 0.69
配合比2 140 120 140 54 0.62
配合比3 120 120 160 48 0.50
表 2  优化配合比参数
图 8  冷却水管布置
参数 数值
E/MPa 2.5
$\rho $/(kg·m?3) 20
$\mu$ 0.09
$\lambda $/(W·m?2· K?1) 0.040
c /(J·kg?1·K?1) 121
表 3  橡塑海绵板材料参数
序号 控制措施 分析工况 ${\theta _1}$ /°C ${\theta _2}$ /°C ${p_{\rm{m}}}$ /
MPa
$({p_{\rm{m}}} - {p_0})\times$ ${p_0}^{-1}$/%
0 无措施 ? 65.4 23.2 ? 0
1 外壁保温与内腔通风 ? 65.2 17.8 6.31 ?1.1
2 应力扩散孔 方孔
(3.0 m×1.0 m)
55.8 21.6 5.98 ?6.3
圆孔
(直径1.6 m)
60.2 21.7 5.91 ?7.4
3 分层施工 层间间隔
时间48 h
61.8 22.0 5.74 ?10.0
层间间隔
时间72 h
59.0 21.3 5.13 ?19.6
层间间隔
时间96 h
56.8 20.1 4.72 ?26.0
4 优化混凝土配合比 配合比1 62.3 21.7 6.08 ?4.7
配合比2 57.5 19.7 5.49 ?13.9
配合比3 50.8 16.8 4.66 ?27.0
5 冷却水管 钢管 53.0 21.0 4.42 ?30.7
PVC管 55.0 21.8 4.80 ?24.8
6 隔热缓冲层 层高1.2 m 65.3 22.3 5.90 ?7.5
层高1.8 m 65.5 19.5 5.36 ?16.0
层高2.5 m 65.6 12.0 3.69 ?42.2
表 4  控制措施有效性计算结果
图 9  温度应力组合控制措施
图 10  温度和应变传感器的布置
施工层数 ${\theta _1}$/°C ${\theta _2}$/°C ${\theta _3}$/°C
实测值 计算值 实测值 计算值 实测值 计算值
注:1)括号内数据为温度数据对应的时间.
第1层2.5 m 83.0(52 h)1) 78.0(60 h) 17.8(40 h) 15.9(52 h) 12.7(28 h) 12.8(24 h)
第2层1.5 m 49.7(130 h) 73.3(140 h) 22.1(148 h) 22.0(140 h) ? ?
第3层1.8 m 81.6(210 h) 74.7(212 h) 26.9(210 h) 24.8(212 h) ? ?
表 5  现场试验最大温度
图 11  现场试验各测点的温度数据
10?6
测点 第1层2.5 m 第2层1.5 m 第3层1.8 m
εm εc εm εc εm εc
注:1)括号内数据为应变数据对应的时间.
1 98(96 h)1) 82(96 h) 92(96 h) 131(140 h) 68(220 h) 121(168 h)
2 105(96 h) 71(96 h) 98(96 h) 152(132 h) 82(244 h) 139(204 h)
3 44(62 h) 35(72 h) 106(160 h) 120(132 h) 108(244 h) 145(214 h)
4 25(96 h) ?9(96 h) 63(144 h) 75(140 h) 103(240 h) 120(240 h)
5 18(96 h) ?9(72 h) 60(129 h) 110(132 h) 90(224 h) 148(220 h)
6 60(96 h) 80(84 h) 86(122 h) 128(140 h) 63(224 h) 119(168 h)
7 48(96 h) 25(72 h) 85(129 h) 116(142 h) 90(240 h) 108(188 h)
8 38(62 h) ?3(96 h) 95(156 h) 90(140 h) 105(238 h) 147(212 h)
9 ?3(60 h) ?19(96 h) 44(152 h) 47(140 h) 87(220 h) 118(214 h)
表 6  现场试验的最大拉应变
图 12  现场试验各测点应变数据
1 KJELDGAARD N, FRIES G Construction of the great belt west bridge[J]. Structural Engineering International, 1995, 5 (4): 214- 215
doi: 10.2749/101686695780600809
2 CHEN Wai-fah, DUAN Lian. Handbook of international bridge engineering [M]. Boca Raton: CRC Press, 2014.
3 LI Fang-yuan, SHEN Yin Full-scale test of the hydration heat and the curing method of the wet joints of a precast segmental pier of a bridge[J]. European Journal of Environmental and Civil Engineering, 2017, 21 (3): 348- 370
doi: 10.1080/19648189.2015.1119063
4 刘忠友 大桥预制墩湿接头裂缝预防措施探讨[J]. 水运工程, 2008, (12): 164- 167
LIU Zhong-you Preventive measures for fissures in wet joints of bridge’s prefabricated pier[J]. Port and Waterway Engineering, 2008, (12): 164- 167
doi: 10.3969/j.issn.1002-4972.2008.12.034
5 王洪纲. 热弹性力学概论[M]. 北京: 清华大学出版社, 1989.
6 NOWACKI W. Thermoelasticity [M]. Kent: Elsevier, 2014.
7 朱伯芳. 有限单元法原理与应用[M]. 北京: 中国水利水电出版社, 2009.
8 朱伯芳. 大体积混凝土温度应力与温度控制[M]. 北京: 中国电力出版社, 1998.
9 WU Y, LUNA R Numerical implementation of temperature and creep in mass concrete[J]. Finite Elements in Analysis and Design, 2001, 37 (2): 97- 106
doi: 10.1016/S0168-874X(00)00022-6
10 LACKNER R, MANG H A Chemoplastic material model for the simulation of early-age cracking: from the constitutive law to numerical analyses of massive concrete structures[J]. Cement and Concrete Composites, 2004, 26 (5): 551- 562
doi: 10.1016/S0958-9465(03)00071-4
11 雷宇芳, 刘可心, 汪发红, 等 杭州湾跨海大桥湿接头混凝土裂缝原因分析及防裂措施研究施工关键技术研究[J]. 公路, 2006, (9): 90- 93
LEI Yu-fang, LIU Ke-xin, WANG Fa-hong, et al Analysis of reasons of concrete crack in cast-in-situ pier base of Hangzhou Bay sea-crossing bridge and a study on measures for cracking prevention[J]. Highway, 2006, (9): 90- 93
doi: 10.3969/j.issn.0451-0712.2006.09.020
12 许宏亮, 秦明强 金塘大桥浪溅区混凝土结构的裂缝控制[J]. 公路, 2009, (1): 146- 149
XU Hong-liang, QIN Ming-qiang Cracking control technique of concrete structure in splash zone of Jintang Bridge[J]. Highway, 2009, (1): 146- 149
13 王新刚, 孙业发, 徐鸿玉 港珠澳大桥预制桥墩裂缝控制技术[J]. 中国港湾建设, 2015, 35 (12): 66- 70
WANG Xin-gang, SUN Ye-fa, XU Hong-yu Control technology for prefabricated pier crack of Hongkong Zhuhai Macao Bridge[J]. China Harbour Engineering, 2015, 35 (12): 66- 70
14 孔祥谦. 热应力有限单元法分析[M]. 上海: 上海交通大学出版社, 1999.
15 ROHSENOW W M, HARTNETT J P, GANIC E N. Handbook of heat transfer fundamentals [M]. New York: McGraw-Hill, 1983.
16 British Standards Institution. Eurocode-2: design of concrete structures, Part1-1: general rules for buildings [S]. London: British Standards Institution, 2004.
17 刘宏伟. 混凝土早龄期弹性模量无损检测初探[D]. 南京: 河海大学, 2006: 38.
LIU Hong-wei. Tentative research on non-destructive detection of concrete early-age elastic modulus [D]. Nanjing: Hohai University, 2006: 38.
18 顾文发. C40商品混凝土早龄期力学性能试验研究[D]. 北京: 北京交通大学, 2012: 47.
GU Wen-fa. Experimental study on mechanical properties of C40 commercial concrete at early age [D]. Beijing: Beijing Jiaotong University, 2012: 47.
19 中华人民共和国住房和城乡建设部. 大体积混凝土施工规范: GB 50496—2009 [S]. 北京: 中国计划出版社, 2009.
20 Japan Society of Civil Engineers. コンクリート標準示方書設計編[S]. 東京都: 土木学会出版委員会, 2012.
21 SCHINDLER A K Effect of temperature on hydration of cementitious materials[J]. ACI Materials Journal, 2004, 101 (1): 72- 81
22 SCHINDLER A K, FOLLIARD K J Heat of hydration models for cementitious materials[J]. ACI Materials Journal, 2005, 102 (1): 24- 33
23 屈铁军, 徐荣桓, 石云兴 配筋率对钢筋混凝土构件弹性模量影响的试验研究[J]. 混凝土, 2014, (9): 113- 115
QU Tie-jun, XU Rong-huan, SHI Yun-xing Experimental study on influence of ratio of reinforcement to modulus of elasticity of reinforced concrete component[J]. Concrete, 2014, (9): 113- 115
doi: 10.3969/j.issn.1002-3550.2014.09.029
24 汪冬冬, 王成启, 谷坤鹏 不同胶凝材料混凝土绝热温升试验[J]. 水运工程, 2009, (10): 10- 13
WANG Dong-dong, WANG Cheng-qi, GU Kun-peng Experimental study on adiabatic temperature rising for concrete of different cement materials[J]. Port and Waterway Engineering, 2009, (10): 10- 13
25 YANG J, HU Y, ZHENG Z, et al Thermal analysis of mass concrete embedded with double-layer staggered heterogeneous cooling water pipes[J]. Applied Thermal Engineering, 2012, 35: 145- 156
doi: 10.1016/j.applthermaleng.2011.10.016
[1] 肖偲,王奎华,王孟波. 基于桩侧虚土桩模型的桩-桩芯土竖向动力响应[J]. 浙江大学学报(工学版), 2020, 54(8): 1593-1603.
[2] 张玉琦,蒋楠,贾永胜,周传波,罗学东,吴廷尧. 运营充水状态高密度聚乙烯管的爆破振动响应特性[J]. 浙江大学学报(工学版), 2020, 54(11): 2120-2127.
[3] 卢春鹏,刘杏红,赵志方,马刚,金瑞鑫,常晓林. 热膨胀系数时变性对混凝土温度应力仿真影响[J]. 浙江大学学报(工学版), 2019, 53(2): 284-291.
[4] 肖南,杨逢春. 不同温度和位移边界下混凝土楼板配筋建议[J]. 浙江大学学报(工学版), 2014, 48(11): 1925-1932.
[5] 潘金龙,齐长雨,黄毅方,吴宏雷. 超长大体积混凝土地下结构温度效应的确定及仿真[J]. J4, 2011, 45(9): 1680-1687.
[6] 俞亚南, 张巍, 申永刚. 大体积承台混凝土早期表面开裂控制措施[J]. J4, 2010, 44(8): 1621-1628.
[7] 徐正中 陈仁朋 陈云敏. 托板桩处理路堤技术现场试验研究[J]. J4, 2008, 42(9): 1484-1488.
[8] 金南国 金贤玉 吴伟河 田野. 等效龄期法在混凝土早龄期温度裂缝控制中的应用[J]. J4, 2008, 42(1): 44-47.
[9] 朱明双 王金昌 朱向荣. 路堤荷载下现浇筒桩复合地基性状分析[J]. J4, 2006, 40(12): 2186-2190.
[10] 曾开华 俞建霖 龚晓南. 路堤荷载下低强度混凝土桩复合地基性状分析[J]. J4, 2004, 38(2): 185-190.