自动化技术 |
|
|
|
|
考虑技能水平的多技能资源约束项目调度 |
任逸飞, 陆志强, 刘欣仪, 张猛 |
同济大学 机械与能源工程学院,上海 201804 |
|
Project scheduling problem with hierarchical levels of skills |
REN Yi-fei, LU Zhi-qiang, LIU Xin-yi, ZHANG Meng |
School of Mechanical Engineering, Tongji University, Shanghai 201804, China |
引用本文:
任逸飞, 陆志强, 刘欣仪, 张猛. 考虑技能水平的多技能资源约束项目调度[J]. 浙江大学学报(工学版), 10.3785/j.issn.1008-973X.2017.05.021.
REN Yi-fei, LU Zhi-qiang, LIU Xin-yi, ZHANG Meng. Project scheduling problem with hierarchical levels of skills. JOURNAL OF ZHEJIANG UNIVERSITY (ENGINEERING SCIENCE), 10.3785/j.issn.1008-973X.2017.05.021.
|
参考文献(References):
[1] BELLENGUEZ O, NETON E. Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills [M]. Berlin: Springer Berlin Heidelberg, 2005: 229-243.
[2] BARZ C, KOLISCH R. Hierarchical multi-skill resource assignment in the telecommunications industry [J]. Production and Operations Management, 2014, 23(3): 489-503.
[3] HURKENS C A J. Incorporating the strength of MIP modeling in schedule construction [J]. RAIRO-Operations Research, 2009, 43(4): 409-420.
[4] ESTELLON B, GARDI F, NOUIOUA K. High-performance local search for task scheduling with human resource allocation [C]∥International Workshop on Enigneering Stochastic Local Search Algorithms. Berlin: Springer Berlin Heidelberg,2009: 1-15.
[5] CORDEAU J F, LAPORTE G, PASIN F, et al. Scheduling technicians and tasks in a telecommunications company [J]. Journal of Scheduling, 2010, 13(4): 393-409.
[6] FIRAT M, HURKENS C A J. An improved MIP-based approach for a multi-skill workforce scheduling problem [J]. Journal of Scheduling, 2012, 15(3): 363-380.
[7] 喻小光,战德臣,聂兰顺,等.柔性资源约束的资源水平项目调度问题[J].计算机集成制造系统,2010,16(9): 1967-1976.
YU Xiao-guang, ZHAN De-chen, NIE Lan-shun, et al. Flexible resource constrained resource leveling project scheduling problem [J]. Computer Integrated Manufacturing Systems, 2010, 16(9): 1967-1976.
[8] 陈君兰,叶春明.柔性资源受限多项目调度的混沌粒子群算法研究[J].计算机应用研究,2013,30(1): 117120.
CHEN Jun-lan, YE Chun-ming. Chaos particle swarm optimization on flexible-resource constrained multi-project scheduling research [J]. Application Research of Computers, 2013, 30(1): 117-120.
[9] VALLS V, PEREZ A, QUINTANILLA S. Skilled workforce scheduling in service centres [J]. European Journal of Operational Research, 2009, 193(3): 791-804.
[10] HEIMERL C, KOLISCH R. Scheduling and staffing multiple projects with a multi-skilled workforce [J]. OR Spectrum, 2010, 32(2): 343-368.
[11] CHEN J, ZHU J, ZHANG D. Multi-project scheduling problem with human resources based on dynamic programming and staff time coefficient[C]∥Management Science & Engineering (ICMSE), 2014 International Conference on. Helsinki:IEEE, 2014: 1012-1018.
[12] NABER A, KOLISCH R. MIP Models for resourceconstrained project scheduling with flexible resource profiles [J]. European Journal of Operational Research, 2014, 239(2): 335-348.
[13] FERNANDEZ V V, FRAMINAN J M. Integrated project scheduling and staff assignment with controllable processing times [J]. The Scientific World Journal, 2014, 2014(1): 1-16.
[14] 周辅疆,陈宏文,王斌,等.改进柔性资源约束项目调度模型与粒子群算法[J].火力与指挥控制,2016, 41(1): 62-66.
ZHOU Fu-jiang, CHEN Hong-wen, WANG Bin, et al. Modified model of flexible resource-constrained multi-mode project scheduling problem and particle swarm optimization [J]. Fire Control & Command Control, 2016, 41(1): 62-66.
[15] JARBOUI B, DAMAK N, SIARRY P, et al. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems[J]. Applied Mathematics & Computation, 2008, 195(1): 299-308.
[16] PETEGHEM V V, VANHOUCKE M. A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem [J]. European Journal of Operational Research, 2010, 201(2): 409-418.
[17] PETEGHEM V V, VANHOUCKE M. An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances [J]. European Journal of Operational Research, 2014, 235(1): 62-72.
[18] 王万良,吴启迪.生产调度智能算法及其应用[M].北京:科学出版社,2007: 15-21. |
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|