Please wait a minute...
J4  2012, Vol. 46 Issue (4): 672-680    DOI: 10.3785/j.issn.1008-973X.2012.04.015
土木工程     
海底取水盾构隧道管片力学性状的数值研究
钟润辉1, 王立忠1, 王湛1, 王体2
1. 浙江大学 建筑工程学院,浙江 杭州 310058;2. 浙江大唐乌沙山发电有限责任公司,浙江 大唐315722
Numerical analysis of mechanical behaviors of segments of
subsea shield tunnel for water intake
ZHONG Run-hui1, WANG Li-zhong1, WANG Zhan1, WANG Ti2
1. College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China;
2. Zhejiang Datang Wushashan Power Generation Limited Company, Datang 315722, China
 全文: PDF  HTML
摘要:

为了研究海底取水隧道管片在施工和运行过程中力学性状的不同,采用三维实体模型对国内首次采用八环错缝拼装的三门核电取水隧道标准段进行分析.模型中管片采用实体单元模拟,螺栓采用梁单元模拟,充分考虑各接缝间的接触作用.计算结果表明,与施工阶段相比,运行期整体直径变形增大了1.5倍,最大正弯矩增大了44.4%,环向螺栓受力增大了近11倍,各接缝张开量增大了近9倍.八环错缝拼装时,关键块位置的改变将在一定程度上影响各环的内力分布,运行期各环拱顶处正弯矩最大值是最小值的2.22倍.对于取水隧道而言,运行期充水工况是控制工况.

Abstract:

A three-dimensional solid model was adopted to analyze the standard segment of Sanmen nuclear power station’s water intake tunnel which was staggered joint assembling per eight rings in order to analyze the different mechanical behaviors of subsea water intake tunnel’s segments between construction and operation. The segments were modeled by solid elements, the bolts were modeled by beam elements, and the contact role of joints was considered. The numerical results indicated that the diameter deformation of water intake tunnel in operation was 1.5 times larger than in construction, with the maximum positive moment increasing 44.4%, the internal force of circumferential bolt rising nearly 11 times, and the splaying amount of joints soaring up to nearly 9 times. When tunnel was staggered joint assembling per eight rings, key block’s location would affect the distribution of internal force of segments. During the operation period, the maximum of positive moment of crown was 2.22 times larger than the minimum. For the water intake tunnel, operation with water stress is design control load case.

出版日期: 2012-05-17
:  TU 94.2  
基金资助:

国家自然科学基金资助项目(51079128).

通讯作者: 王立忠,男,教授.     E-mail: wlzzju@163.com
作者简介: 钟润辉(1986—),男,硕士生,从事岩土工程中隧道受力问题的研究. E-mail:godlefthand@126.com
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  

引用本文:

钟润辉, 王立忠, 王湛, 王体. 海底取水盾构隧道管片力学性状的数值研究[J]. J4, 2012, 46(4): 672-680.

ZHONG Run-hui, WANG Li-zhong, WANG Zhan, WANG Ti. Numerical analysis of mechanical behaviors of segments of
subsea shield tunnel for water intake. J4, 2012, 46(4): 672-680.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2012.04.015        http://www.zjujournals.com/eng/CN/Y2012/V46/I4/672

[1] 刘建航,候学渊.盾构法隧道[M].北京:中国铁道出版社,1991: 183-197.
[2] 日本土木学会.隧道标准规范(盾构篇)及解说[M].朱伟,译.北京:中国建筑工业出版社,2001: 68-73.
[3] Working Group No.2, International Tunneling Association. Guidelines for the design of shield tunnel lining [J]. Tunneling and Underground Space Technology, 2000, 15(3): 303-331.
[4] 朱合华,陶履彬.盾构隧道衬砌结构受力分析的梁弹簧系统模型[J].岩土力学,1998,19(2): 26-31.
ZHU Hehua, TAO Lvbin. Study on two beamspring models for the numerical analysis of segments in shield tunnel [J]. Rock and Soil Mechanics, 1998, 19(2): 26-31.
[5] 朱伟,黄正荣,梁精华.盾构衬砌管片的壳弹簧设计模型的研究[J].岩土工程学报,2006,27(12): 2154-2158.
ZHU Wei, HUANG Zhengrong, LIANG Jinghua. Studies on shellspring design model for segment of shield tunnels [J]. Chinese Journal of Geotechnical Engineering, 2006, 27(12): 2154-2158.
[6] 苏宗贤,何川. 盾构隧道管片衬砌内力分析的壳弹簧接触模型及其应用[J]. 工程力学,2007,24(10): 131-136.
SU Zongxian, HE Chuan. Shellspringcontact model for shield tunnel segmental lining analysis and its application [J]. Engineering Mechanics, 2007, 24(10): 131-136.
[7] 张建刚,何川,杨征. 大断面宽幅盾构管片三维内力分布分析[J]. 岩土力学,2009,30(7): 2058-2062.
ZHANG Jiangang, HE Chuan, YANG Zheng. Analysis of 3D internal forces distribution of wide segment lining for largesection shield tunnel [J]. Rock and Soil Mechanics, 2009, 30(7): 2058-2062.
[8] NAGGAR H E, HINCHBERGER S D, LO K Y. A closedform solution for composite tunnel linings in a homogeneous infinite isotropic elastic medium [J]. Canadian Geotechnical Journal, 2008, 45(2):  266-287.
[9] LEE K M, GE X W. The equivalence of a jointed shielddriven tunnel lining to a continuous ring structure [J]. Canadian Geotechnical Journal, 2001, 38(3): 461-483.
[10] 张海波,殷宗泽,朱俊高,等.盾构法隧道衬砌施工阶段受力特性的三维有限元模拟[J].岩土力学,2005,26(6): 990-994.
ZHANG Haibo, YIN Zongze, ZHU Jungao, et al. Threedimensional FEM simulation of shielddriven tunneling during construction stage [J]. Rock and Soil Mechanics, 2005, 26(6): 990-994.
[11] 陈俊生,莫海鸿,梁仲元.盾构隧道施工阶段管片局部开裂原因初探[J].岩石力学与工程学报,2006,25(5): 906-910.
CHEN Junsheng, MO Haihong, LIANG Zhongyuan. Study on local cracking of segments in shield tunnel during construction [J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(5): 906-910.
[12] MO H H, CHEN J S. Study on inner force and dislocation of segments caused by shield machine attitude [J]. Tunneling and Underground Space Technology, 2008, 23(3): 281-291.
[13] CHEN J S, MO H H. Numerical study on crack problems in segments of shield tunnel using finite element method [J]. Tunneling and Underground Space Technology, 2009, 24(1): 91-102.
[14] 钟小春,朱伟.盾构衬砌管片压力反分析研究[J].岩土力学,2006,27(10): 1743-1748.
ZHONG Xiaochun, ZHU Wei. Back analysis of soil pressure acting on shield lining segment [J]. Rock and Soil Mechanics, 2006, 27(10): 1743-1748.
[15] 朱合华,崔茂松,杨金松.盾构衬砌管片的设计模型与荷载分布的研究[J].岩土工程学报,2000,22(2): 190-194.
ZHU Hehua, CUI Maosong, YANG Jinsong. Design model for shield lining segments and distribution of load [J]. Chinese Journal of Geotechnical Engineering, 2000, 22(2): 190-194.