盾构近距离上穿运营隧道的实测数据分析
朱蕾1,2, 黄宏伟1
1.同济大学 地下建筑与工程系,上海 200092; 2.上海地铁维保中心,上海 200070
onitoring data analysis of disturbing effect caused by
shielddriven over operating tunnel
ZHULei1,2, HANG Hong-wei 1
1. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China;
2. Shanghai Metro Maintenance Center, Shanghai 200070, China
 全文: PDF  HTML
摘要:

在上海地铁13号线上穿地铁4号线施工期隧道变形实测数据分析的基础上,探讨在施工扰动影响下的隧道变形机理,得出穿越扰动导致隧道隆起变形,隧道隆起变形存在滞后,盾构穿越完成后第51天隧道隆起变形趋于收敛等规律.盾构穿越后隧道隆起变形量占隧道累计隆起变形量的40%~65%.二次穿越施工扰动延长了隧道隆起变形的稳定时间,增加了隧道累计隆起变形量.盾构穿越施工的影响范围为4倍的施工盾构直径(4D),隧道纵向变形曲线近似成正态分布,反弯点位置在2D左右,最大累计隆起变形出现在沿4号线隧道方向的投影相交点位置.

Abstract:

The deformation mechanism of existing tunnel was analyzed based on the monitoring data analysis of M13 crossing M4 in shanghai. Results showed that the deformation of tunnel was caused by the construction disturbance and was convergent after 51 days. The heave deformation of tunnel after construction accounted for 40%65% of the cumulative deformation of tunnel. The second crossing construction disturbance delayed the convergence time of heave deformation and increased the cumulative heave deformation of tunnel. The range of disturbing effect was four times of the shield diameter (4D). The longitudinal deformation curve of tunnel was approximately normal function distribution. The distance of inflection point was 2D. Along the tunnel direction of M4, the maximum of heave deformation was in the middle of the two crossing point.

出版日期: 2010-10-01
:  U 456.3  
作者简介: 朱蕾(1975—),女,上海人,博士生,从事地铁监护及咨询. E-mail: zl13916404902@163.com
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  

引用本文:

朱蕾, 黄宏伟. 盾构近距离上穿运营隧道的实测数据分析[J]. J4, 2010, 44(10): 1962-1966.

SHU Lei, HUANG Hong-Wei. onitoring data analysis of disturbing effect caused by
shielddriven over operating tunnel. J4, 2010, 44(10): 1962-1966.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2010.10.020        http://www.zjujournals.com/eng/CN/Y2010/V44/I10/1962

[1] 白廷辉,尤旭东,李文勇.盾构超近距离穿越地铁运营隧道的保护技术[J].地下空间,1999,19(4): 311-316.
BAI Tinghui, YOU Xudong, LI Wenyong. The protection techniques of the running subway caused by adjacent shielddriven [J]. Underground Space, 1999, 19(4): 311-316.
[2] 李强,曾德顺.盾构施工中垂直交叉隧道变形的三维有限元分析[J].岩土力学,2001,22(3): 334-338.
LI Qiang, ZENG Deshun. 3D deformation analysis with the preliminary new tunnel perpendicularly crossing under the old one [J]. Rock and Soil Mechanics, 2001, 22(3): 334-338.
[3] 孙钧,刘洪洲.交叠隧道盾构法施工土体变形的三维数值模拟[J].同济大学学报,2002, 22(4): 379-385.
SUN Jun, LIU Hongzhou. Threedimensional numerical simulation of groundsurface settlement under overlapped shield tunneling [J].Chinese Journal of Tongji University, 2002, 22(4): 379-385.
[4] 王梦恕.21世纪是隧道及地下空间大发展的年代[J].西部探矿工程, 2000,62(1): 7-8.
WANG Mengshu. The 21st is a big century for the development of tunnel and underground [J]. West China Exploration Engineering, 2000, 62(1): 7-8.
[5] 沈培良,张海波,殷宗泽.相邻隧道长距离叠交施工的数值模拟[J].西部探矿工程,2003, 90(11): 93-95.
SHEN Peiliang, ZHANG Haibo, YIN Zongze. Numerical simulation of long distance overlapped shield tunneling [J]. West China Exploration Engineering, 2003, 90(11): 93-95.
[6] 周文波,吴惠明.观光隧道盾构叠交施工技术初探[J].中国市政工程,2002,100(4): 20-23.
ZHOU Wenbo, WU Huiming. Preliminary exploration of crossover construction sightseeing technology for tunnel shield [J]. China Municipal Engineering, 2002, 100(4): 20-23.
[7]侯学渊,廖少明.盾构隧道沉降预估[J].地下工程与隧道,1993(4): 25-32.
HOU Xueyuan, LIAO Shaoming. The settlement prediction of shield tunnel [J]. Underground Work and Tunnel, 1993(4): 25-32.
[8]刘建航,侯学渊.盾构法隧道[M].北京:中国铁道出版社,1991: 398-414.

No related articles found!