|
|
Scheduling of dual—resource constrained m anufacturing system |
ZHONG Jiang-Sheng |
Department of Mechatronic Engineering,Wuyi University,Jiangmen 529020,China |
|
|
Abstract Research on scheduling of m anufacturing system in recent years is reviewed. The methods with regard to computerized intelligence,especially genetic algorithm s for scheduling are addressed.It is pointed out that considering the system with equipm ent and workers constrained,dual—resource constrained system is important. A synthetic methodology for scheduling is proposed.
|
Published: 15 June 2002
|
双重资源约束条件下制造系统的调度
根据近年来关于制造系统优化调度问题的研究状况,阐述了具有计算智能的方法,特别是遗传算法在调度问题研究中的应用. 指出同时考虑设备和工人两种资源限制的双重资源约束条件是很重要的,提出了一种混合调度原理和方法.
关键词:
制造系统,
调度,
遗传算法,
双重资源约束
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|