建模、分析、优化和决策 |
|
|
|
|
基于动态时间窗的泊车系统路径规划研究 |
朱龙彪1, 王辉1, 王景良2, 邵小江1, 朱志慧3 |
1. 南通大学 机械工程学院, 江苏 南通 226019;
2. 江苏海事职业技术学院, 江苏 南京 211199;
3. 江苏金冠立体停车股份有限公司, 江苏 南通 226003 |
|
Research on path planning of parking system based on dynamic time window |
ZHU Long-biao1, WANG Hui1, WANG Jing-liang2, SHAO Xiao-jiang1, ZHU Zhi-hui3 |
1. School of Mechanical Engineering, Nantong University, Nantong 226019, China;
2. Jiangsu Maritime Institute, Nanjing 211199, China;
3. Jiangsu Jinguan Solid Parking System Engineering Co., Ltd., Nantong 226003, China |
引用本文:
朱龙彪, 王辉, 王景良, 邵小江, 朱志慧. 基于动态时间窗的泊车系统路径规划研究[J]. 工程设计学报, 2017, 24(4): 440-448.
ZHU Long-biao, WANG Hui, WANG Jing-liang, SHAO Xiao-jiang, ZHU Zhi-hui. Research on path planning of parking system based on dynamic time window[J]. Chinese Journal of Engineering Design, 2017, 24(4): 440-448.
链接本文:
https://www.zjujournals.com/gcsjxb/CN/10.3785/j.issn.1006-754X.2017.04.011
或
https://www.zjujournals.com/gcsjxb/CN/Y2017/V24/I4/440
|
[1] |
王辉,朱龙彪,朱天成,等.基于粒子群遗传算法的泊车系统路径规划研究[J].工程设计学报,2016,23(2):195-200. WANG Hui,ZHU Long-biao,ZHU Tian-cheng,et al. Research on path planning of parking system based on PSO-genetic hybrid algorithm[J].Chinese Journal of Engineering Design,2016,23(2):195-200.
|
[2] |
FAZLOLLAHTABAR H,SAIDI M M.Optimal path in an intelligent AGV-based manufacturing system[J]. Transportation Letters:the International Journal of Transportation Research,2015,7(4):219-228.
|
[3] |
MAJDI M,ANVAR H S,BARZAMINI R,et al.Multi AGV path planning in unknown environment using fuzzy inference systems[C].20083rd IEEE International Symposium on Control, Communications and Signal Processing (ISCCSP 2008).St Julians, Malta, Mar. 12-14,2008.
|
[4] |
NISHI T,MAENO R.Petri net decomposition approach to optimization of route planning problems for AGV sys-tems[J].IEEE Transactions on Automation Science and Engineering,2010,7(3):523-537.
|
[5] |
UMAR U A,ARIFFIN M K A,ISMAIL N,et al.Hy-brid multi-objective genetic algorithms for integrated dy -namic scheduling and routing of jobs and automated guided vehicle (AGV) in flexible manufacturing systems (FMS) environment[J].International Journal of Ad-vanced Manufacturing Technology, 2015, 81(9/12):2123-2141.
|
[6] |
KRNJAK A,DRAGANJAC I,BOGDAN S,et al.De-centralized control of free ranging AGVs in warehouse environments[C].2015 IEEE International Conference on Robotics and Automation (ICRA).Seattle, May. 26-30,2015.
|
[7] |
SMOLI? R N,BOGDAN S,KOVA?I?Z,et al.Time windows based dynamic routing in multi-AGV systems[J].IEEE Transactions on Automation Science & Engi-neering,2010,7(1):151-155.
|
[8] |
RAJOTIA S, SHANKER K, BATRA J L.Semi-dynamic time window constrained routeing strategy in an AGV system[J].International Journal of Production Research,1998,36(1):35-50.
|
[9] |
CHEN T J,SUN Y,DAI W,et al.On the shortest and conflict-free path planning of multi-AGV system based on Dijkstra algorithm and the dynamic time window method[J].Advanced Materials Research,2013,645:267-271.
|
[10] |
BALSEIRO S R,LOISEAUB I,RAMONET J.An ant colony algorithm hybridized with insertion heuristics for the time dependent vehicle routing prob-lem with time windows[J].Computers & Operations Research,2011,38(6):954-966.
|
[11] |
GUO L X,YANG Q,YAN W J.Intelligent path plan-ning for automated guided vehicles system based on to-pological map[C].2012 IEEE Conference on Control, Systems and Industrial Informatics. Bandung, Indonesia,Sep.23-26,2012.
|
[12] |
贺丽娜,楼佩煌,钱晓明,等.基于时间窗的自动导引车无碰撞路径规划[J].计算机集成制造系统,2010, 16(12):2630-2634. HE Li-na,LOU Pei-huang,QIAN Xiao-ming,et al. Conflict-free automated guided vehicles routing based on time window[J]. Computer Integrated Manufacturing Systems,2010,16(12):2630-2634.
|
[13] |
乔岩,钱晓明,楼佩煌,等.基于改进时间窗的AGVs避碰路径规划[J].计算机集成制造系统,2012,18(12):2683-2688. QIAO Yan,QIAN Xiao-ming,LOU Pei-huang,et al. Improved time window based conflict-free automated guided vehicle system routing[J].Computer Integrated Manufacturing Systems,2012,18(12):2683-2688.
|
[14] |
胡彬,王冰,王春香,等.一种基于时间窗的自动导引车动态路径规划方法[J].上海交通大学学报,2012, 46(6):967-971. HU Bin,WANG Bing,WANG Chun-xiang,et al.Dy-namic routing of automated guided vehicles based on time window[J].Journal of Shanghai Jiaotong Univer-sity,2012,46(6):967-971.
|
[15] |
霍凯歌,张亚琦,胡志华.自动化集装箱码头多载AGV调度问题研究[J].大连理工大学学报,2016,56(3):244-251. HUO Kai-ge,ZHANG Ya-qi,HU Zhi-hua.Research on scheduling problem of multi-load AGV at automated container terminal[J].Journal of Dalian University of Technology,2016,56(3):244-251.
|
[16] |
苏霞,李伟光.FMS中自动导引车路径规划[J].机械设计与制造,2015(1):201-203. SU Xia, LI Wei-guang.Path planning of automated guided vehicles in FMS[J].Machinery Design & Man-ufacture,2015(1):201-203.
|
[17] |
MIYAMOTO T, INOUE K. Local and random searches for dispatch and conflict-free routing problem of capacitated AGV systems[J].Computers & Industrial Engineering,2016,91:1-9.
|
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|