[1] 邱东,陈爽,仝彩霞,等. 钢铁企业高炉煤气平衡与综合优化[J]. 计算机技术与发展, 2009,19(3): 196-199.
QIU Dong, CHEN Shuang, TONG Caixia, et al. Blast furnace gas balance and comprehensive optimization in iron and steel enterprises [J].Computer Technology and Development , 2009, 19(3): 196-199.
[2] 刘渺. 钢铁企业主工序分厂煤气量预测方法研究[D]. 长沙: 中南大学,2006∶30-34.
LIU Miao. Study on gas prediction methods in branch plants of main process in ironsteel enterprise [D]. Changsha: Central South University, 2006: 30-34.
[3] 刘颖,赵珺,王伟,等. 基于数据的改进回声状态网络在高炉煤气发生量预测中的应用 [J]. 自动化学报,2009,35(6): 731-738.
LIU Ying, ZHAO Jun, WANG Wei, et al, Improved Echo state network based on datadriven and its application to prediction of blast furnace gas output [J]. Acta Automatica Sinica, 2009,35(6): 731-738.
[4] 时飞飞. 基于改进ESN的高炉煤气系统预测方法的研究[D]. 大连: 大连理工大学,2009:21-38.
SHI Feifei. Study on the prediction method for blast furnace gas system based on improved echo state network [D]. Dalian: Dalian University of technology, 2009: 21-38.
[5] 周传典. 高炉炼铁生产技术手册[M]. 北京: 冶金工业出版社, 2002: 365-374.
[6] 成兰伯.高炉炼铁工艺及计算[M]. 北京: 冶金工业出版社, 1991: 203-215.
[7] 姜曙光.济钢能源中心煤气平衡预测模型研究[D]. 济南:山东大学,2009: 29-31.
JIANG Shuguang. The research of gas balance forecast in the energy center of Jinan Iron& Steel Group[D]. Jinan: Shandong University, 2009: 29-31.
[8] 王玉涛,夏靖波,周建常,等. 基于神经网络模型的时间序列预测算法及其应用 [J]. 信息与控制,1998,27(6): 413-417.
WANG Yutao, XIA Jingbo, ZHOU Jianchang et al. A predictive algorithm based on neural network model for times series and its application [J]. Information and Control, 1998,27(6): 413-417.
[9] 唐万梅. 几个预测方法及模型的研究[D]. 内蒙古: 内蒙古大学,2006:21-30.
TANG Wanmei. Research of some forecasting methods and models[D]. Inner Mongolia: Inner Mongolia University, 2006: 21-30.
[10] 王晓萍,孙继洋,金鑫. 基于BP神经网络的钱塘江水质指标的预测 [J]. 浙江大学学报:工学版,2007,41(2): 361-364.
WANG Xiaoping, SUN Jiyang, JIN Xin. Prediction of water quality index in Qiantang river based on BP neural network model [J]. Journal of Zhejiang University Engineering Science, 2007,41(2): 361-364.
[11] 曾燕飞. 基于人工神经网络的高炉热状态预测模型研究[D]. 长沙: 中南大学,2005:22-35.
ZENG Yanfei. Research on prediction model of blast furnace thermal condition based on BP neural network[D]. Changsha: Central South University, 2005:22-35.
[12] 徐哲,邬玲懿,杨成忠,等. 基于BP神经网络的城市污水泵站预测模型 [J]. 控制工程,2010,17(4): 1-4.
XU Zhe, WU Lingyi, YANG Chengzhong, et al, The forecasting model of urban sewage pumping station based on BP neural networks [J]. Control Engineering of China, 2010,17(4): 1-4.
[13] TONG Hongwei, CHENG Jianyuan, WANG Shidong. The effective application of BP neural networks prediction model for gas content in binchang mining[C]∥ Proc. of the International Conference on Computational Intelligence and Software Engineering. Wuhan. [s. n.], 2009: 978-981.
[14] 黄琳,魏保立. BP网络的泛化能力改进方法及应用 [J]. 石家庄铁道学院学报,2005,18(3): 94-96.
HUANG Lin, WEI Baoli. Study of generalization of BP neural network [J]. Journal of Shijiazhuang Railway Institute,2005,18(3): 94-96.
[15] 徐建伟,刘桂芳. 基于贝叶斯正规化算法的BP神经网络泛化能力研究 [J]. 数理医药学杂志,2007,20(3): 293-295.
XU Jianwei,LIU Guifang. Research of generalization of based on Bayesianregularization algorithm BP neural network [J]. Journal of Mathematical Medicine,2007,20(3): 293-295.
[16] RADHAKRISHNAN V R, MOHAMED A R. Neural networks for the identification and control of blast furnace hot metal quality [J]. Journal of Process Control, 2000, 10(6): 509-524. |