Please wait a minute...
J4  2013, Vol. 47 Issue (10): 1790-1797    DOI: 10.3785/j.issn.1008-973X.2013.10.014
    
Wind environment simulation and wind power utilizability of Anzhong Building
YUAN Xing-fei, ZHANG Ying
Space Structures Research Center, Zhejiang University, Hangzhou 310058, China
Download:   PDF(0KB) HTML
Export: BibTeX | EndNote (RIS)      

Abstract  

Basic forms of wind power generation in built environment and some indexes which evaluate the feasibility of wind power utilization were introduced. Considering the special location of Anzhong Building, the wind field around building was simulated by the computational fluid dynamics method. Some special places with large wind velocity, such as passageway, wind duct and building roof, were chosen to conduct further analysis. The utilization feasibility was evaluated using the index of wind speed increasing coefficient and proposals about reasonably installing wind turbines were proposed. Results show that the wind velocity at the building corner and passageway increases obviously and micro-turbines can be installed here. Considering economy and efficiency, it is feasible to install some horizontal-axis wind turbines on tower along the height. In the wind duct of the building, the wind velocity also increases significantly, especially when the direction of wind is parallel to that of the duct depth. The horizontal-axis wind turbine is suitable to be located at the front edge of duct. The wind power concentration effect on the roof of Anzhong Building is obvious with the increasing wind velocity, and multi rows of wind turbines can be installed according to the size of roof.



Published: 01 October 2013
CLC:  TU 023  
  TK 89  
Cite this article:

YUAN Xing-fei, ZHANG Ying. Wind environment simulation and wind power utilizability of Anzhong Building. J4, 2013, 47(10): 1790-1797.

URL:

http://www.zjujournals.com/eng/10.3785/j.issn.1008-973X.2013.10.014     OR     http://www.zjujournals.com/eng/Y2013/V47/I10/1790


安中大楼风环境模拟及风能利用

介绍建筑环境中的风能利用基本形式及风能利用可行性评价指标.针对安中大楼所处的特定位置,运用计算流体力学方法对周围的风环境进行数值模拟|对可能利用风能的位置即风速明显增大区域,如夹道、洞口及屋顶处进行详细的分析,利用风速增大系数指标评价风能利用的可行性,对合理布置风力机提出建议.研究结果表明:在夹道处、大楼边角处风速加大,可以安装小型风力发电机,综合考虑经济性和有效性,可以沿塔架高度布置多台水平轴风力机|建筑物开洞区域的风速增大,风向平行于洞口径深时效果显著,适合在洞口前沿布置水平轴风力机|安中大楼屋顶风速较大,集结效果明显,可以根据屋顶尺寸安装多排风力机.

[1] METENS S. Wind energy in urban areas: concentrator effects for wind turbines close to buildings [J]. Refocus, 2002, 3(2): 22-24.

[2] METENS S. The energy yield of roof mounted wind turbines [J]. Wind Engineering, 2003, 27(6): 507-517.

[3] BLANCH M J. Wind Energy technologies for use in the built environment [J]. Wind Engineering, 2002, 26(3): 125-143.

[4] PEACOCK A D, JENKINS D, AHADZI M, et al. Micro wind turbines in the UK domestic sector [J]. Energy and Building, 2008, 40(7): 1324-1333.

[5] LU L, IP K Y. Investigation on the feasibility and enhancement methods of wind power utilization in high-rise buildings of Hong Kong [J].Renewable and Sustainable Energy Reviews, 2009,13(2): 450-461.


[6] 苑安民,田思进.城市高层建筑群风能利用的研究[J].能源技术, 2005, 26(10): 154-156.

YUAN An-min, TIAN Si-jin. Research on the utilization of the wind energy among city highrises [J]. Energy Technology, 2005, 26(10): 154-156.

[7] 潘雷,陈宝明.扩压风道型建筑风能利用的探讨[J].可再生能源, 2009, 27(5): 90-93.

PAN Lei, CHEN Bao-ming. Study on wind energy utilization in the pressure expanding tunnel building [J]. Renewable Energy Resources, 2009, 27(5): 90-93.

[8] 李秋胜,李永贵,陈伏彬,等.风能发电在超高层建筑中的应用研究[C]∥第14届全国风工程学术会议论文集.北京: 中国土木工程学会, 2009: 801-805.

LI Qiu-sheng, LI Yong-gui, CHEN Fu-bin, et al. Application research on wind power generation in high buildings [C]∥Proceedings of the 14th National Wind Engineering Academic Conference. Beijing: China Civil Engineering Society, 2009: 801-805.

[9] 张玉.风能利用建筑的风能利用效能研究与结构分析[M].杭州:浙江大学, 2011.

[10] 中国建筑科学研究院. GB50009-2001, 建筑结构荷载规范[S]. 北京: 中国建筑工业出版社,2002.

[11] 程荣香.中小型风力机选址的技术条件和对策[J].可再生能源, 2002, 3: 26-27.

CHENG Rong-xiang. Technical conditions and countermeasure of site selection of small and middle wind turbines [J]. Renewable Energy, 2002, 3: 26-27.

[1] YUAN Xing-fei, YU Jun-Wei. Wind-induced response analysis of wind turbine tower installed on building roof[J]. J4, 2013, 47(11): 1911-1916.