[1] 冯忠居,程继夏.路桥过渡段行车荷载的计算[J].西安建筑科技大学学报:自然科学版,2004,36(3): 318-320.
FENG Zhongju, CHENG Jixia. The calculation of vehicle load of highway and bridge transition section [J]. Journal of Xi’an University of Architecture and Technology: Natural Science Edition, 2004, 36(3): 318-320.
[2] 赵衡,刘晓明.桥头跳车引起的路面受力计算分析[J].公路交通科技,2005,22(5): 59-63.
ZHAO Heng, LIU Xiaoming. Analysis of pavement loading caused by vehicle jumping at bridge head [J]. Journal of Highway and Transportation Research and Development, 2005, 22(5): 59-63.
[3] 张洪亮,胡长顺,陈培芳.移动荷载作用下桥头搭板动力响应分析[J].中南公路工程,2005,30(4): 91-95.
ZHANG Hongliang, HU Changshun, CHEN Peifang. Dynamic response analysis of approach slab under moving loads [J]. Central South Highway Engineering, 2005, 30(4): 91-95.
[4] 陶向华.路桥过渡段差异沉降控制标准与人车路相互作用[D].南京:东南大学,2005.
TAO Xianghua. Differential settlement control criterion of bridgeapproach and peoplevehicleroad interaction [D]. Nanjing: Southeast University, 2005.
[5] 刘萌成.桥台后回填差异沉降控制标准及设计方法研究[D].南京:东南大学,2005.
LIU Mengcheng. Investigation of the design criterion of the bridgeapproach settlement for the backfills [D].Nanjing: Southeast University, 2005.
[6] 刘萌成,黄晓明,陶向华.移动荷载作用下近桥台处路面结构动力响应的有限元法分析[J].公路交通科技,2006,23(5): 1-6.
LIU Mengcheng, HUANG Xiaoming, TAO Xianghua. FEM analysis of dynamic response of pavement adjacent to abutment under moving load [J]. Journal of Highway and Transportation Research and Development, 2006, 23(5): 1-6.
[7] 沈正,黄晓明.软土地基桥台后回填固化粉煤灰工后沉降与差异沉降分析[J].公路交通科技,2007,24(5): 53-56.
SHEN Zheng, HUANG Xiaoming. Analysis on post construction settlements and differential settlement of solidified fly ash backfills adjacent to abutment on soft clay foundation [J]. Journal of Highway and Transportation Research and Development, 2007, 24(5): 53-56.
[8] 项贻强,孙筠.采用深层混凝土搭板处治桥头跳车的试验研究[J].哈尔滨工业大学学报,2010,42(1):158-162.
XIANG Yiqiang, SUN Yun. Case study of the deepseated concrete slab for settlement control at bridge approach embankment [J]. Journal of Harbin Institute of Technology, 2010, 42(1):158-162.
[9] 聂志红.高速铁路轨道路基竖向动力响应研究[D].长沙:中南大学,2005.
NIE Zhihong. Study on vertical response of the track/ subgrade in highspeed railway [D]. Changsha: Central South University, 2005.
[10] 王金昌,陈页开.ABAQUS在土木工程中的应用[M].杭州:浙江大学出版社,2006: 79.
[11] CAI C S, SHI X M, VOYIADJIS G Z. Structural performance of bridge approach slabs under given embankment settlement [J]. Journal of Bridge Engineering, 2005, 10(4): 482-489.
[12] 王其昌.高速铁路土木工程[M].成都:西南交通大学出版社,1999: 280.
[13] 廖公云,黄晓明.ABAQUS有限元软件在道路工程中的应用[M].南京:东南大学出版社,2008: 45.
[14] 朱志铎,郝建新,赵黎明.交通荷载作用下粉土路基变形特性分析[J].地下空间与工程学报,2009,5(5): 1013-1019.
ZHU Zhiduo, HAO Jianxin, ZHAO Liming. Deformation characteristics of silt subgrade under traffic loads [J].Chinese Journal of Underground Space and Engineering, 2009, 5(5): 1013-1019.
[15] HYODO M, YASUHARA K. Analytical procedure for evaluating porewater pressure and deformation of saturated clay ground subjected to traffic loads [C]∥Proceeding of 6th International Conference on Numerical Methods in Geomechanics. Innsbruck, Austria: [s.n.], 1988: 659-664.
[16] TOSHLKAZU H. Threedimensional analysis of trafficinduced ground vibrations [J]. Journal of Geotechnical Engineering, 1991, 117(8): 1413-1434.
[17] 张艳美,梁波.几何不平顺条件下高速公路路基的动态响应[J].兰州铁道学院学报:自然科学版, 2001, 20(4): 66-69.
ZHANG Yanmei, LIANG Bo. Dynamic response to subgrade of highway in geometric irregularity condition [J]. Journal of Lanzhou Railway University: Natural Sciences, 2001, 20(4): 66-69.
[18] 刘萌成,黄晓明,陶向华.移动荷载作用下近桥台处路面结构动力响应的有限元法分析[J].公路交通科技,2006,23(5): 1-6.
LIU Mengcheng, HUANG Xiaoming, TAO Xianghua. FEM analysis of dynamic response of pavement adjacent to abutment under moving load [J]. Journal of Highway and Transportation Research and Development, 2006, 23(5): 1-6. |