Please wait a minute...
J4  2009, Vol. 43 Issue (10): 1892-1896    DOI: 10.3785/j.issn.1008-973X.2009.10.025
    
Simulation analysis of cable dome construction process
GUO Jia-min, DONG Shi-lin, YUAN Xing-fei, ZHAO Bao-jun
(Space Structures Research Center, Zhejiang University, Hangzhou 310027, China)
Download:   PDF(570KB) HTML
Export: BibTeX | EndNote (RIS)      

Abstract  

A general and reliable method was explored to improve the calculative efficiency and precision during the construction analysis to ensure the analysis results guide the practical construction. Two different simulations of construction process of the same cable dome were analyzed based on the finite element software ANSYS. The coordinates of the control points, component internal force and geometric configuration were obtained to study the construction process. Comparison of two construction processes shows that the variations of component force and geometric configuration in the construction process are related to the construction methods, and the diagonal cable has reinforced effect to the structure from inner to outer. Two construction processes are similar under given conditions. Calculation processes also show that the construction simulation based on ANSYS is general and efficient.



Published: 29 November 2009
CLC:  TU 323  
Cite this article:

GUO Jia-Min, DONG Dan-Lin, YUAN Hang-Fei, et al. Simulation analysis of cable dome construction process. J4, 2009, 43(10): 1892-1896.

URL:

http://www.zjujournals.com/eng/10.3785/j.issn.1008-973X.2009.10.025     OR     http://www.zjujournals.com/eng/Y2009/V43/I10/1892


索穹顶结构施工模拟分析

为了研究索穹顶的施工成形过程,寻找一种通用、可靠的计算方法来提高施工分析的效率与精确性,确保计算结果切实有效地指导实际工程施工,利用有限元软件ANSYS对一索穹顶结构按反分析的思想进行2种施工方案下的施工模拟计算,确定在施工过程中各控制结点的坐标值、各单元的内力值与结构的几何形状,并对2种施工方案进行了分析对比.结果表明,在结构的张拉成形过程中,单元的内力值与结构的几何形状的变化规律与施工方案有关,2种施工方案在一定条件下具有共性,各斜索对整个结构的影响由里及外依次增强.计算过程也表明,利用通用有限元软件ANSYS对索穹顶结构进行施工模拟具有通用性与高效性.

[1] 曹喜.张拉整体索穹顶结构的设计理论与试验研究[D].天津:天津大学,1997.
CAO Xi. Study on design theory and experiment of tensegrity cable dome structures[D].Tianjin: Tianjin University,1997.
[2] GEIGER D H, STENFANIUK A, CHEN D. The design and construction of two cable domes for the Korean Olympics[C]∥ Proceedings of International Association of Space Structures. Osaka: American Society of Civil Engineering, 1986: 265272.
[3] 杨联萍,董明,邱枕戈,等.索穹顶结构[J].空间结构,2003,9(2):914.
YANG Lian-pin, DONG Ming, QIU Zhen-ge,et al.Cable domes[J].Spatial Structures,2003,9(2):914.
[4] 唐建民.索穹顶体系的结构理论研究[D].上海:同济大学,1996.
TANG Jian-ming. The theory of cable dome system [D].Shanghai: Tongji University,1996.
[5] 袁行飞, 董石麟.索穹顶结构施工控制反分析[J].建筑结构学报,2001,22(2):7579.
YUAN Xing-fei, DONG Shi-lin. Inverse analysis of construction process of cable dome[J]. Journal of Building Structures, 2001, 22(2):7579.
[6] 郑君华,董石麟,詹伟东.葵花型索穹顶结构的多种施工张拉方法及其试验研究[J].建筑结构学报,2006,27 (1):112116.
ZHENG Jun-hua, DONG Shi-lin, ZHAN Wei-dong. Experimental research on construction process of Levy type cable dome[J]. Journal of Building Structures, 2006, 27(1): 112116.
[7] 沈祖炎,张立新.基于非线性有限元的索穹顶施工模拟分析[J].计算力学学报,2002,19(4):466471.
SHEN Zu-yan, ZHANG Li-xin. Simulation of erection procedures of cable domes based on nonlinear FEM[J]. Chinese Journal of Computational Mechanics, 2002, 19(4): 466471.
[8] 罗尧治,沈雁彬.索穹顶结构初始状态确定与成形过程分析[J].浙江大学学报:工学版,2004,38(10):13211327.
LUO Yao-zhi, SHEN Yan-bin. Initial configuration determination of cable dome structure and analysis of its configuration process [J]. Journal of Zhejiang University: Engineering Science , 2004,38(10):13211327.

[1] CAI Jin-biao, CHEN Yong, YAN Wei. Three-dimensional finite element analysis based electromechanical
impedance model and its application
[J]. J4, 2010, 44(12): 2342-2347.