浙江大学学报(工学版)  2019, Vol. 53 Issue (1): 166-173    DOI: 10.3785/j.issn.1008-973X.2019.01.018
机械工程     
复合岩层地质下硬岩隧道掘进机滚刀布局方法
刘建琴1, 邢振华2, 宾怀成2, 郭伟2
1. 天津大学 机械工程学院, 天津 300072;
2. 天津大学 机构理论与装备设计教育部重点实验室, 天津 300072
Cutters' layout method of tunnel boring machine cutter-head under mixed-face rock ground
LIU Jian-qin1, XING Zhen-hua2, BIN Huai-cheng2, GUO Wei2
1. College of Mechanical Engineering, Tianjin University, Tianjin 300072, China;
2. Key Laboratory of Mechanism Theory and Equipment Design of Ministry of Education, Tianjin University, Tianjin 300072, China
 全文: PDF(1190 KB)   HTML
摘要:

为了减少滚刀的换刀次数,提高隧道掘进机在复合岩层地质下掘进时的施工效率, 针对复合岩石地层中刀盘滚刀磨损程度不同且所受载荷不均匀的特点,提出基于等磨损速率的正滚刀极径设计方法. 以秦岭隧道TB880E实际施工记录的数据为实例,得出滚刀的等磨损速率方差相对降低了10.45%;结合刀盘盘体载荷的分布特性,提出基于刀盘受载均匀的多螺旋线旋转分区域极角设计方法. 分析随机型刀盘、等速螺旋线型刀盘、多螺旋线型刀盘在复合地质条件下刀盘滚刀的磨损速率方差、倾覆力矩、径向不平衡力和质心偏斜量. 结果表明,8条螺旋线型刀盘滚刀的布置性能综合最优.

Abstract:

The characteristics of unequal wear and uneven load of the cutter-head under mixed-face rock ground were analyzed in order to reduce the number of cutter changes and improve the construction efficiency of tunnel boring machine (TBM) in mixed-face rock ground. A design method of the cutters' diameter based on equal wear rate was proposed. The actual construction record data of TB880E driven in Qin-ling Mountains tunnel was taken as an example. Results showed that the variance of the equal wear rate was reduced by 10.45%. A new method of polar angle design with multi-helices partitioned was proposed based on the distribution characteristics of cutter load. Then the wear rate variance, overturning moment, unbalanced radial force and centroid deviation of several TBM cutter-heads which have different cutters' layout design, including random, constant helix and multi-helices were analyzed. Results show that eight helices layout design is a comprehensive optimal solution.

收稿日期: 2017-12-27 出版日期: 2019-01-07
CLC:  TH69  
基金资助:

国家“973”重点基础研究发展规划资助项目(2013CB035402);国家自然科学基金资助项目(51675374,51575379)

作者简介: 刘建琴(1972-),女,博士,副教授,从事机构动力学,机械产品设计理论的研究.orcid.org/0000-0003-0766-040x.E-mail:liujianqin@tju.edu.cn
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
作者相关文章  

引用本文:

刘建琴, 邢振华, 宾怀成, 郭伟. 复合岩层地质下硬岩隧道掘进机滚刀布局方法[J]. 浙江大学学报(工学版), 2019, 53(1): 166-173.

LIU Jian-qin, XING Zhen-hua, BIN Huai-cheng, GUO Wei. Cutters' layout method of tunnel boring machine cutter-head under mixed-face rock ground. JOURNAL OF ZHEJIANG UNIVERSITY (ENGINEERING SCIENCE), 2019, 53(1): 166-173.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2019.01.018        http://www.zjujournals.com/eng/CN/Y2019/V53/I1/166

[1] LIU J, REN J, WEI G. Thrust and torque characteristics based on a new cutter-head load model[J]. Chinese Journal of Mechanical Engineering, 2015, 28(4):801-809.
[2] 张照煌, 乔永立. 全断面岩石掘进机盘形滚刀布置规律研究[J]. 工程力学, 2011, 28(5):172-177 ZHANG Zhao-huang, QIAO Yong-li. Study on the cutters' layout of cutter-head for full face tunnel boring machine[J]. Engineering Mechanics, 2011, 28(5):172-177
[3] 朱殿华, 孙斌. 基于均衡破岩量的TBM正滚刀多目标优化布局[J]. 机械设计, 2017, 34(11):1-6 ZHU Dian-hua, SONG Bin. Multi-objective optimal layout of TBM normal cutters based on balanced rock breaking[J]. Journal of Machine Design, 2017, 34(11):1-6
[4] SUN W, HUO J Z, CHEN J, et al. Disc cutters' layout design of the full-face rock tunnel boring machine (TBM) using a cooperative evolutionary algorithm[J]. Journal of Mechanical Science and Technology, 2011, 25(2):415-427.
[5] 程军, 巩亚东, 李伟, 等. 基于数字样机技术的隧道掘进机刀盘破岩机理分析[J]. 中国机械工程, 2013, 24(14):1847-1853 CHENG Jun, GONG Ya-dong, LI Wei, et al. Analysis of breaking mechanism of tunnel boring machine cutter based on digital prototype technology[J]. China Mechanical Engineering, 2013, 24(14):1847-1853
[6] MA H, YIN L, GONG Q, et al. TBM tunneling in mixed-face ground:problems and solutions[J]. International Journal of Mining Science and Technology, 2015, 25(4):641-647.
[7] 刘建琴, 宾怀成, 郭伟. 复合岩层下岩石掘进机刀盘载荷特性研究[J]. 哈尔滨工程大学学报, 2018, 39(3):575-583 LIU Jian-qin, BIN Huai-cheng, GUO Wei. Study on load characteristics of TBM cutter-head under mixed-face rock ground condition[J]. Journal of Harbin Engineering University, 2018, 39(3):575-583
[8] 尹怀秀. 针对复合式地层的刀盘设计[J]. 混凝土与水泥制品, 2017, 44(8):69-71 YIN Huai-xiu. Design of cutter-head for mixed-face rock ground[J]. China Concrete and Cement Products, 2017, 44(8):69-71
[9] 程永亮, 钟掘, 暨智勇, 等. TBM刀盘地质适应性设计方法及其应用[J]. 机械工程学报, 2018, 54(1):1-9 CHENG Yong-liang, ZHONG Jue, JI Zhi-yong, et al. Geological adaptaive design method and application of TBM cutter-head[J]. Journal of Mechanical Engineering, 2018, 54(1):1-9
[10] 吴起星, 安关峰, 周小文, 等. 软硬复合地层中盾构掘进刀盘受力分析与计算[J]. 土木工程学报, 2015, 48(2):321-326 WU Qi-xing, AN Guan-feng, ZHOU Xiao-wen, et al. Stress analysis and calculation of shield driven cutter-head in soft and hard composite stratum[J]. Journal of Civil Engineering, 2015, 48(2):321-326
[11] 王贺. 复合地层TBM破岩过程滚刀磨损机理及掘进效率研究[D]. 重庆:重庆大学, 2016. WANG He. Study on the mechanism of cutter wear and driving efficiency in the process of TBM rock breaking in mixed-face rock ground[D]. Chongqing:Chongqing University, 2016.
[12] 杨延栋, 陈馈, 李凤远, 等. 盘形滚刀磨损预测模型[J]. 煤炭学报, 2015, 40(06):1290-1296 YANG Yan-dong, CHEN Kui, LI Feng-yuan, et al. Disc cutter wear prediction model[J]. Journal of China Coal Society, 2015, 40(06):1290-1296
[13] 刘蒙蒙. 硬岩隧道掘进机滚刀布局关键问题研究[D]. 天津:天津大学, 2014. LIU Meng-meng. Research on key problems of cutters' layout in hard rock tunnel boring machine[D]. Tianjin:Tianjin University, 2014.

No related articles found!