空间余量最优的拼装机轨迹规划
王明斗, 陶建峰, 覃程锦, 刘成良
上海交通大学 机械与动力工程学院,上海 200240
Trajectory planning for segment erector based on optimal space allowance
WANG Ming-dou, TAO Jian-feng, QIN Cheng-jin, LIU Cheng-liang
School of Mechanical Engineering, Shanghai Jiaotong University, Shanghai 200240, China
 全文: PDF(1430 KB)   HTML
摘要:

针对类矩形盾构管片拼装轨迹规划问题,阐述类矩形盾构管片拼装机的工作原理并推导其运动学正逆解.在机械手外轮廓上设置若干关键点,建立关键点空间余量最优模型,并将空间余量最大位姿作为管片拼装轨迹的中间段;在关节空间内采用多项式插值法获取平滑的起始段与结束段轨迹.最终形成的轨迹包括起始段、中间段和结束段:起始段为起点至空间余量最大位姿点轨迹段,中间段为空间余量最大位姿运动轨迹段,结束段为空间余量最大位姿点至终点轨迹段.仿真实验表明:该方法能够规划出从起点至终点的无碰平滑轨迹,使得类矩形盾构管片拼装机在狭窄空间内安全有效地完成管片递送任务.

Abstract:
The working principle of quasi-rectangular tunnel segment erector was introduced and the forward and inverse kinematics solution were derived for the trajectory planning problem of quasi-rectangular tunnel segment erector. Then several key points were set on the manipulator contours; an optimization model was established based on the points; the maximum space allowance pose was taken as the middle part of erecting trajectory. The starting part and the terminal part were generated by using polynomial interpolation method in joint space. As results, every trajectory contains starting, middle and terminal part. The starting part is from starting point to the maximum space allowance pose. The middle part is the trajectory along maximum space allowance pose. The terminal part is from the maximum space allowance pose to goal point. The simulation experiments show that this method can plan out smooth trajectory from start point to goal point, and the erector can finish segment delivery tasks along these trajectories in narrow space safely and effectively.
出版日期: 2017-03-01
CLC:  TH 112  
基金资助:

国家自然科学基金资助项目(51375297,51275288);上海市科学技术委员会资助项目(14DZ1207900);上海市优秀学术带头人计划(14XD1402000)

通讯作者: 陶建峰,男,副教授. ORCID: 0000-0001-6098-9779.     E-mail: jftao@sjtu.edu.cn
作者简介: 王明斗(1993—),男,硕士生,从事机械电子研究.ORCID: 0000-0002-8655-659X. E-mail: mingdouwang@sjtu.edu.cn
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
作者相关文章  

引用本文:

王明斗, 陶建峰, 覃程锦, 刘成良. 空间余量最优的拼装机轨迹规划[J]. 浙江大学学报(工学版), 10.3785/j.issn.1008-973X.2017.03.004.

WANG Ming-dou, TAO Jian-feng, QIN Cheng-jin, LIU Cheng-liang. Trajectory planning for segment erector based on optimal space allowance. JOURNAL OF ZHEJIANG UNIVERSITY (ENGINEERING SCIENCE), 10.3785/j.issn.1008-973X.2017.03.004.

[1] GUO W, GUO W, GAO F, et al. Innovative group-decoupling design of a segment erector based on G F set theory [J]. Chinese Journal of Mechanical Engineering. 2013, 26(2): 264-274.
[2] 崔国华.盾构管片拼装机的设计及动态性能研究[D].长春:吉林大学,2009: 2.
CUI Guo-hua. Research on design and dynamic performance for segment assembly erector of shield tunnel machine [D]. Changchun: Jilin University, 2009: 2.
[3] KOYAMA Y. Present status and technology of shield tunneling method in Japan [J]. Tunneling and Underground Space Technology. 2003, 18(2/3): 145-159.
[4] SHI H, GONG G, YANG H, et al. Energy savinganalysis of segment positioning in shield tunneling machine considering assembling path optimization\[J\]. Journal of Central South University, 2014, 22(12):4526-4536.
[5] 王林涛,龚国芳,施虎.基于拼装参数优化的盾构机管片拼装节能技术[J].浙江大学学报:工学版,2012, 46(12): 2259-2267.
WANG Lin-tao, GONG Guo-fang, SHI Hu. Energy-saving technology of segment erecting process of shield tunneling machine based on erecting parameters optimization [J]. Journal of Zhejiang University: Engineering Science, 2012, 46(12): 2259-2267.
[6] 奚鹰.盾构掘进机异形断面隧道切削机构的理论研究[D].上海:同济大学,2006: 6.
XI Ying. Theoretical analysis of special section tunnel cutting mechanism of shield machine [D].Shanghai: Tongji University, 2006: 6.
[7] 奚鹰,徐宝富,陆敏恂,等.异形隧道盾构切削机构的奇异性与运动学分析[J].同济大学学报:自然科学版,2006,34(2): 249-253.
XI Ying, XU Bao-fu, LU Min-xun, et al. Singularity and kinematics analysis of special section tunnel shield machine cutting mechanism [J]. Journal of Tongji University: Natural Science, 2006,34(2): 249-253.
[8] JEEVAMALAR J, RAMABALAN D. Optimal trajectory planning for autonomous robots: a review [C] ∥ International Confrerence on advances in Engineering, Science and Management, Tamil Nadu: IEEE, 2012: 269-275.
[9] 黄献龙,梁斌,吴宏鑫.机器人避碰规划综述[J].航天控制,2002(1): 34-40,46.
HUANG Xian-long, LIANG Bin, WU Hong-xin. A survey on robotics collision avoidance planning [J]. Aerospace Control, 2002(1): 34-40,46.
[10] KHATIB O. Real-time obstacle avoidance for manipulators and mobile robots [C] ∥ Robotics and Automation. Proceedings. 1985 IEEE International Conference.St. Louis: IEEE, 1985: 500-505
[11] KHATIB O. Real-time obstacle avoidance for manipulators and mobile robots [J]. The International Journal of Robotics Research, 1986, 5(1): 90-98.
[12] TIAN L,COLLINS C. An effective robot trajectory planning method using a genetic algorithm \[J\]. Mechatronics, 2004, 14(5): 455-470.
[13] SIMEON T. Manipulation planning with probabilistic roadmaps \[J\]. The International Journal of Robotics Research, 2004, 23(7/8): 729-746.
[14] SIMEON T. LAUMOND J, NISSOUX C. Visibility-based probabilistic roadmaps for motion planning [J]. Advanced Robotics, 2000, 14(6): 477-493.
[15] 贾庆轩,陈钢,孙汉旭,等.基于A*算法的空间机械臂避障路径规划[J].机械工程学报,2010,46(13): 109-115.
JIA Qing-xuan, CHEN Gang, SUN Han-xu, et al. Path planning for space manipulator to avoid obstacle based on A*algorithm [J]. Chinese Journal of Mechanical Engineering, 2010,46(13): 109-115.
[16] 罗鑫.矩形盾构隧道管片拼装方法的研究[J].建筑施工,2014,36(2): 199-201.
LUO Xin. Study on assembly method for rectangular tunnel segments [J], Building Construction, 2014, 36(2):199-201.
[17] 刘峰,高国跃,赵洁咏,等.用于矩形盾构的回转拼装机:CN104533472A[P]. 2015-04-22.
[18] 黄健,周文波,顾旭莹,等.异形断面盾构管片拼装机:CN103244144A[P]. 2013-08-14.
[19] JHON J C.机器人学导论[M].贠超,译.北京:机械工业出版社,2006: 84-86.
[20] 蒋刚,龚迪琛,蔡勇,等.工业机器人[M].成都:西南交通大学出版社,2011: 101-104.
[1] 李伟达,王柱,张虹淼,李娟,顾洪. 床式步态康复训练系统机构设计[J]. 浙江大学学报(工学版), 2021, 55(5): 823-830.
[2] 高阳,方成刚,蒋贤辉. 水泥3D打印喷头中浆体的流动分析[J]. 浙江大学学报(工学版), 2019, 53(3): 420-426.
[3] 张铭奎, 程文明, 刘放. 助力外骨骼负载特征与驱动特征耦合效应[J]. 浙江大学学报(工学版), 2017, 51(4): 807-816.
[4] 戚玉轩, 邱清盈, 冯培恩, 李立新. 机械结构组合对称概念体系及应用[J]. 浙江大学学报(工学版), 2016, 50(10): 1889-1901.