土木工程与水利工程 |
|
|
|
|
排水和排涝设计暴雨重现期的异同 |
张泽慧,丁晶,覃光华,姚瑞虎 |
1.四川大学 水利水电学院 四川 成都 610065;
2.四川大学 水力学与山区河流开发保护国家重点实验室 四川 成都 610065 |
|
Differences and similarities of design rainstorm’s return period between drainage and water logging |
ZHANG Zebhui,DING Jing,QIN Guang hua,YAO Rui hu |
1.College of Water Resource and Hydropower, Sichuan University, Chengdu, 610065, China;
2. State Key Laboratory of Hydraulics and Mountain River Engineering, Chengdu, 610065, China |
[1] 曾娇娇.市政排水与水利排涝标准衔接研究[D].广州:华南理工大学,2015.
ZENG Jiaojiao. Study on standard syntaxis of urban drainage between pipe and river [D]. Guangzhou: South China University of Technology,2015.
[2] 邱瑞田,徐宪彪,文康,等.关于确定城市防洪标准的几点认识[J]. 中国防汛与抗旱,2006,13:43-47.
QIU Ruitian,XU Xianbiao,WENG Kang,et al. Considerations related to formulation of urban flood control standards [J]. China flood & drought management,2006,13:43-47.
[3] 何文学,李茶青.城市“排水、排涝、防洪”工程之间的和谐关系研究[J].给水排水,2015,41(S1):85-88.
HE Wenxue,LI Chaqing. Study of harmonious relationship about“municipal drainage,drain waterlogging,flood control”in city waterlogging [J]. Journal of Water Resources and Architectural Engineering,2015,41(S1):85-88.
[4] 陆廷春.南京市六合区市政排水与水利排涝设计暴雨重现期衔接关系[J]. 水利与建筑工程学报,2012,10(6):191-194.
LU Tingchun. Study on connection relationship between return period of municipal drainage system and waterlogged drainage system in Liuhe district of Nanjing city[J]. Journal of Water Resources and Architectural Engineering,2012,10(6):191-194.
[5] 杨星,李朝方,刘志龙,等.基于风险分析法的排水排涝暴雨重现期转换关系[J].武汉大学学报:工学版,2012,45(2):171-176.
YANG Xing,LI Chaofang,LIU Zhilong,et al. Risk probability analysis of design storm combination of urban pipe drainage and rive drainage[J]. Engineering Journal of Wuhan University, 2012, 45(2): 171-176.
[6] 高学珑.城市排涝标准与排水标准衔接的探讨[J].给水排水,2014,6(40):18-21.
GAO Xuelong. On the connection relationship between the standards of urban Waterlogging and drainage [J]. Water & Wastewater Engineering,2014,40(6):18-21.
[7] 冯耀龙,马姗姗,肖静.水利排涝与市政排水重现期的转换关系[J].南水北调与水利科技,2015, 8(13):614-617.
FENG Yaolong,MA Shanshan,XIAO Jing. Transformation relationship of return period between municipal drainage system and waterlogged drainage system [J].SouthtoNorth Water Transfers and Water Science &Technolog,2015, 8(13):614-617.
[8] 陈鑫,邓慧萍,马细霞.基于SWMM的城市排涝与排水体系重现期衔接关系研究[J]. 给水排水,2009,9(35) :114-117.
CHEN Xin,DENG Huiping,MA Xixia. Study on connection relationship between return period of urban drainage system and waterlogged drainage system based on SWMM [J]. Water & Wastewater Engineering,2009,9 (35) :114-117.
[9] 邵卫云.基于水文特性的暴雨选样方法的频率转换[J].浙江大学学报:工学版,2010,44(8):1597-1603.
SHAO Weiyun. Probability relationship between rainstorm sampling methods base on hydrologic characters [J]. Journal of Zhejiang University :Engineering Science,2010,44(8):1597-1603.
[10] 叶守泽.水文水利计算\[M\].北京:中国水利水电出版社,1994:47-52.
[11] 马戈.概率论与数理统计\[M\].北京:科学出版社,2012:5-12.
[12] 邓培德.城市暴雨2种选样方法的概率关系与应用评述[J]. 给水排水,2003,32(6):39-42.
DENG Peide. Review on probability and application of two sampling methods for urban storm [J]. Water & Wastewater Engineering,2003,32(6):39-42.
[13] 夏军良.城市防洪排涝体系建设存在的问题与对策[J]. 江西建材,2015,8(161):295.
XIA Liangjun. Problems existing in the construction of urban flood control and drainage system and the countermeasures [J]. Jiangxi Building Material,2015,8(161):295.
[14] 方国华,钟淋娟,苗苗.我国城市防洪排涝安全研究[J].灾害学,2008,23(3):119-123.
FANG Guohua,ZHONG Linjuan,MIAO Miao. Research on urban flood control and waterlogged drainage safety of our country [J]. Journal of Catastrophology,2008,23(3):119-123.
[15] 中华人民共和国水利部.SL442006 水利水电工程设计洪水计算规范[S].北京:中国水利水电出版社,2006:7.
Ministry of Water Resources of the People's Republic of China. SL442006.Regulation for calculating design flood of water resources and hydropower projects\[S\].Beijing:Water&Power Press,2006:7 |
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|