[1] 王庆.知识型企业知识员工任务指派及调度决策问题研究[D].天津:天津大学, 2006.
WANG Qing. Study on decision of knowledge workers task appointing and scheduling in knowledge enterprises [D]. Tianjin: Tianjin University, 2006.
[2] 张余.随机能力提升下知识型员工调度问题研究[D].西安:西安电子科技大学,2012.
ZHANG Yu. Knowledge workers scheduling based on stochastic ability promotion [D]. Xi’an: Xidian University, 2012.
[3] ALBA E, FRANCISCO CHICANO J. Software project management with GAs [J]. Information Sciences, 2007, 177(11): 2380-2401.
[4] 应瑛,寿涌毅,李敏.资源受限多项目调度的混合遗传算法[J].浙江大学学报:工学版,2009,43(1): 23-27.
YING Ying, SHOU Yong-yi, LI Min. Hybrid genetic algorithm for resource constrained multi-project scheduling problem [J]. Journal of Zhejiang University :Engineering Science, 2009,43(1): 23--27.
[5] 寿涌毅,傅奥.多目标资源受限项目调度的多种群蚁群算法[J].浙江大学学报:工学版,2010,44(1): 51-55.
SHOU Yong-yi, FU Ao. Multi-colony ant algorithm for multi-objective resource-constrained project scheduling [J]. Journal of Zhejiang University :Engineering Science, 2010,44(1): 51-55.
[6] GUTJAHR W J, KATZENSTEINER S, REITER P, et al. Multi-objective decision analysis for competence-oriented project portfolio selection [J]. European Journal of Operational Research, 2010, 205(3): 670-679.
[7] 柳春锋.工程项目中技能型员工调度问题研究[D].合肥: 合肥工业大学,2011.
LIU Chun-feng. Research on the skilled workforce scheduling problem in the engineering project[D]. Hefei: Hefei University of Technology, 2011.
[8] EISELT H A, MARIANOV V. Employee positioning and workload allocation[J]. Computers & Operations Research, 2008, 35(2): 513-524.
[9] ERNST A T, JIANG H, KRISHNAMOORTHY M, et al. Staff scheduling and rostering: A review of applications, methods and models [J]. European Journal of Operational Research, 2004, 153(1): 3-27.
[10] 闫纪红,王子墨.基于学习遗忘作用的人员调度实验设计及其软件开发[J].实验室研究与探索, 2011,30(6): 55-58.
YAN Ji-hong, WANG Zi-mo. Experimental design and software development of staff scheduling based on learning-forgetting effect [J]. Research and Exploration in Laboratory, 2011,30(6): 55-58.
[11] OTERO L D, OTERO C E. A fuzzy expert system architecture for capability assessments in skill-based environments [J]. Expert Systems with Applications, 2012, 39(1): 654-662.
[12] DORAN C, LASENBY A. Geometric algebra for physicists [M]. Cambridge: Cambridge University Press, 2003: ix-xi.
[13] 袁林旺,俞肇元,罗文,等.基于共形几何代数的GIS三维空间数据模型[J].中国科学: 地球科学,2010,40(12): 1740-1751.
YUAN Lin-wang, YU Zhao-yuan, LUO Wen, et al. A 3D GIS spatial data model based on conformal geometric algebra [J]. Scientia Sinica (Terrae),2010,40(12): 1740-1751.
[14] 刘群,李素建.基于《知网》的词汇语义相似度计算[J].中文计算语言学,2002,7(2): 59-76.
LIU Qun, LI Su-jian. Word similarity computing based on How-net [J]. Computational Linguistics and Chinese Language Processing, 2002,7(2): 59-76.
[15] 岳芳,顾新建,郭剑锋,等.概念知识地图协同创作过程中的群体决策模型[J].科研管理,2015,36(1): 127-134.
YUE Fang, GU Xin-jian, GUO Jian-feng, et al. Group decision-making model for collaboratively building conceptual knowledge map [J].Science Research Management, 2015,36(1): 127-134.
[16] 岳芳,顾新建,祁国宁,等.协同创作过程中的子群决策随机过程模型[J].计算机集成制造系统,2015,21(1): 21-30.
YUE Fang, GU Xin-jian, QI Guo-ning, et al. Subgroup decision-making stochastic process model of collaborative building [J]. Computer Integrated Manufacturing Systems, 2015, 21(1): 21-30.
[17] DUBUISSON M P, JAIN A K. A modified Hausdorff distance for object matching [C]∥ Pattern Recognition. Conference A: Computer Vision & Image Processing, Proceedings of the 12th IAPR International Conference on. Jerusalem: IEEE, 1994, 1: 566-568.
[18] PERWASS C. Geometric algebra with applications in engineering [M]. Berlin: Springer, 2009: 61-79.
[19] 岳芳, 顾新建, 曹玉华,等. 基于几何代数的知识型员工-项目匹配程度计算方法[J]. 计算机集成制造系统, 2015,21(6): 1601-1608.
YUE Fang, GU Xin-jian, CAO Yu-hua, et al. Matching method of knowledge workers and project based on geometric algebra [J]. Computer Integrated Manufacturing Systems, 2015, 21(6): 1601-1608. |