摘要:

焊接混凝土管桩做无损检测时,桩体连接处普遍存在较强的反射信号,而传统的刚度传递模型不能很好地反映这一现象.为此,提出一种模拟管桩焊接缝的简化模型.该模型将焊接缝看作无延时的弹簧系统,弹簧系统刚度是焊接深度和焊缝高度的函数.应用该模型对非均质土中多级预应力混凝土管桩的纵向振动特性进行研究,并得到了半正弦简谐激振力作用下的桩顶刚度、速度等动力响应的半解析解.分析了焊接深度和焊缝高度等因素对桩顶动力响应的影响,发现焊接深度对桩体连接处的反射信号影响明显.两组典型缺陷桩的实测拟合结果表明:该焊缝模型能很好地反映焊接缝处的反射信号,弥补了现有理论的不足.

Abstract:

Nondestructive testing to welded concrete tubular pile demonstrates that more distinct reflected signals exist at the junctions. The traditional stiffness transfer model cannot give a rational explain for this phenomenon. So a simplified model of weld joint for pipe pile was presented. The weld joint in this model is viewed as a spring without time-delay, the stiffness of which is a function of the depth and height of weld. The longitudinal vibration performance of the spliced prestressed concrete pipe pile in inhomogeneous soil was studied and a semi-analytical solution of stiffness and admittance on the pile head under half sine harmonic excitation was obtained using the presented model. The influence of the depth and height of weld on the dynamic response of the pile head was also given. It is found that the reflection at the weld joint will be affected significantly by the depth of the weld. In addition, the fitting results of the field measurement for two typically defective piles show that the presented model can simulate well the reflection signals at the joint and overcome the limitation of the existing theories.

出版日期: 2012-09-01
:  TU 473.1  
基金资助:

国家自然科学基金资助项目(50879077).

作者简介: 王奎华(1965-),男,教授,博导,从事桩基动力学理论究.E-mail:zdwkh0618@zju.edu.cn
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  

引用本文:

王奎华,王宁,吴文兵. 预应力管桩焊接缝对桩基完整性检测的影响[J]. J4, 2012, 46(9): 1625-1632.

WANG Kui-hua, WANG Ning, WU Wen-bing. Influence of weld on integrity testing of prestressed pipe piles. J4, 2012, 46(9): 1625-1632.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2012.09.012        http://www.zjujournals.com/eng/CN/Y2012/V46/I9/1625

[1] KOTEN H V, MIDDENDORP P, BREDERODE PV. An analysis of dissipative wave propagation in a pile [C]∥ Intel Seminar on the Application of StressWave Theory On Piles.Stockholm: [s.n.], 1980.
[2] WANG T, WANG K H, XIE K H. An analytical solution to longitudinal vibration of a pile of arbitrary segments with variable modulus [J]. Acta Mechanica Solida Sinica, 2001, 14(1): 67-73.
[3] NOVAK M. Vertical vibration of floating piles [J]. Journal of the Engineering Mechanics Division, ASCE, 1977, 103(1):153-168.
[4] NOVAK M, TOYOAKI N, FAKHRY A E. Dynamic soil reactions for plane strain case [J]. Journal of the Engineering Mechanics Division, ASCE, 1978, 104(EM4):953-959.
[5] NOVAK M, ELLA F A. Impedance functions of piles in layered media [J]. Journal of the Engineering Mechanics Division, ASCE, 1978, 104(EM3):643-661.
[6] 王奎华, 杨冬英, 张智卿. 两种径向多圈层土体平面应变模型的对比[J]. 浙江大学学报:工学版,2009, 43(10):1903-1908.
WANG Kuihua, YANG Dongying, ZHANG Zhiqing. Comparison on two kinds of radial multizone plane strain model [J]. Journal of Zhejiang University:Engineering Science, 2009, 43(10):1903-1908.
[7] MUKI R, STERNBERG E. Electrostatic load transfer to a half space from a partially embedded axially loaded rod [J]. International Journal of Solids and Structures, 1970, 6:69-90.
[8] RAJAPAKSE R, SHAH A H. On the lateral harmonic motion of an elastic bar embedded in an elastic halfspace [J]. International Journal of Solids and Structures, 1987, 23(2):267-285.
[9] 刘宁. 预应力混凝土管桩水平承载力现场试验及数值模拟[D]. 太原:太原理工大学, 2011.
LIU Ning. InSitu test and numerical simulation of horizontal bearing capacity on prestressed concrete pipe pile[D]. Taiyuan :Taiyuan University of Technology, 2011.
[10] 肖德瑛. 预应力混凝土管桩的承载机理研究及沉降分析[D]. 东营:中国石油大学, 2009.
XIAO Deying. The vertical bearing capacity and settlement analysis of the prestressed concrete pipe pile[D]. Dongying:China University of Petroleum, 2009.
[11] 涂涛. 预应力混凝土管桩承载性能的研究[D]. 西安:长安大学, 2009.
TU Tao. Study on the vertical bearing behavior of prestressed concrete pipe pile[D]. Xian:Changan University, 2009.
[12] 杨轶. 预应力混凝土管桩竖向承载力数值分析与试验研究[D]. 长沙:长沙理工大学, 2008.
YANG Yi. Research on numerical simulation and experimentation of vertical bearing capacity of prestressed concrete tube pile[D]. Changsha:Changsha University of Science and Technology, 2008.
[13] 彭宏. 预应力混凝土管桩及其沉桩挤土效应研究[D]. 武汉:华中科技大学, 2004.
PENG Hong. Study on prestressed concrete pipe pile and compaction effect of pile driving[D]. Wuhan:Huazhong University of Science and Technology, 2004.
[14] LYSMER J, RICHART F E. Dynamic response of footing to vertical load[J]. Soil Mechanical and Foundation Division,ASCE, 1966, 2(1):65-91.
[15] 王建华, 程国勇等. 取样扰动引起土层剪切波速变化的研究实验[J]. 岩石力学与工程学报, 2004, 23(15):2604-2608.
WANG Jianhua, CHENG Guoyong, ZHANG Li. Study on variation of shear wave velocity caused by sampling disturbance [J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(15):2604-2608.
[16] 王奎华, 谢新宇. 连续弹性体模型下桩的动刚度表达式及与静刚度的关系[J]. 建筑结构学报, 2001, 22(2):88-91.
WANG Kuihua, XIE Xinyu. A study on dynamic stiffness based on continuous elastic model of pile [J]. Journal of Building Structures, 2001, 22(2):88-91.

[1] 王忠瑾,谢新宇,方鹏飞,李金柱,金伟良. 刚性长短组合桩的非线性沉降计算分析[J]. J4, 2014, 48(3): 463-470.
[2] 张忠苗, 谢志专, 刘俊伟, 俞峰. 淤质与粉质互层土中管桩沉桩过程的土压力[J]. J4, 2011, 45(8): 1430-1434.
[3] 张忠苗, 刘俊伟, 邹健, 谢志专, 何景愈. 加强型预应力混凝土管桩抗弯剪性能试验研究[J]. J4, 2011, 45(6): 1074-1080.
[4] 常林越, 王金昌, 朱向荣, 谢新宇. 水平受荷长桩弹塑性解析计算[J]. J4, 2010, 44(10): 2029-2035.