J4  2010, Vol. 44 Issue (8): 1621-1628    DOI: 10.3785/j.issn.1008-973X.2010.08.033
水利工程、土木工程     
大体积承台混凝土早期表面开裂控制措施
俞亚南,张巍,申永刚
浙江大学 土木工程学系,浙江 杭州 310058
Control measures for preventing crack on the surface
of mass concrete abutment in early stage
YU Ya-nan, ZHANG Wei, SHEN Yong-gang
Department of Civil Engineering, Zhejiang University, Hangzhou 310058, China
 全文: PDF  HTML
摘要:

针对大体积混凝土浇筑时因水化热作用引起的早期表面开裂问题,对比分析浇筑温度、环境温度、保温材料以及位移约束条件4种因素对混凝土表面应力的影响程度.以宁波象山港公路大桥承台为实例建立有限元模型,选取6个开裂关键部位的节点,分析这些节点的应力数值在28 d龄期内随4种影响因素变化的规律.模拟分析分层浇筑和水管冷却2种降温措施对于减小混凝土表面拉应力的作用.结果表明,混凝土表面拉应力与浇筑温度呈正比,与环境温度呈反比;保温层对承台表面中心部位拉应力的影响大于边缘部位;提高模板的刚度对抗裂有利;分层浇筑和水管冷却可以不同程度地改善表面开裂状况.

Abstract:

In order to prevent surface crack of massive concrete caused by hydration heat in early stage of concreting, the effects of four parameters, i.e., concreting temperature, environmental temperature, material of insulating layer, and constraint conditions on surface stress were analyzed. Finite element analysis was done by taking an abutment of Xiangshanharbor highway bridge in Ningbo as an example. Six points in the key cracking area were selected, and the change of surface stress on these points under the independent effects of four parameters over 28days period was analyzed. Moreover, two methods for temperature reduction, layerbylayer concreting and pipe cooling, were simulated and their effects on surface tensile stress were also examined. The result reveals that, tensile stress on the surface of concrete is proportional to concreting temperature while inversely proportional to environmental temperature; heat preservation reduces surface tensile stress more efficiently in the central area than at the edge of abutment; increasing stiffness of concrete formwork is beneficial to crack prevention; layerbylayer concreting and pipe cooling prevent surface crack in different degree.

出版日期: 2010-09-21
:  U 441.5  
通讯作者: 申永刚,男,博士后.     E-mail: sygdesign@zju.edu.cn
作者简介: 俞亚南(1958-),男,浙江奉化人,教授,博导,主要从事桥梁检测、施工监控方面研究. E-mail: yuyanan@zju.edu.cn
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  

引用本文:

俞亚南, 张巍, 申永刚. 大体积承台混凝土早期表面开裂控制措施[J]. J4, 2010, 44(8): 1621-1628.

SHU E-Na, ZHANG Wei, SHEN Yong-Gang. Control measures for preventing crack on the surface
of mass concrete abutment in early stage. J4, 2010, 44(8): 1621-1628.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2010.08.033        http://www.zjujournals.com/eng/CN/Y2010/V44/I8/1621

[1] 朱伯芳. 大体积混凝土温度应力与温度控制[M]. 北京:中国电力出版社, 1999: 1, 515, 272279,320331.
[2] 黄长华. 恒运热电C厂主厂房柱承台裂缝处理[J]. 武汉大学学报:工学版, 2005, 38(增刊): 345347.
HUANG Changhua. Cracking treatment of main powerhouse columns basement of Henyun Thermal Power Plant C [J]. Engineering Journal of Wuhan University. 2005, 38(Supol.): 345347.
[3] 黄沛, 金秀坤, 王新刚, 等. 天津港高桩码头面层混凝土裂缝成因分析及裂缝控制技术措施[J]. 中国港湾建设,2009, 159: 2224.
HUANG Pei,JIN Xiukun,WANG Xingang, et al .Cause of cracks of Tianjin port highpile wharf surface layer concretes and its control measures [J]. China Harbour Engineering, 2009,159: 2224.
[4] 闫海华, 李东, 周红兵, 等. 大型基础承台水化热分析与裂缝控制[J]. 工业建筑, 2005, 35(增刊): 862866.
YAN Haihua, LI Dong, ZHOU Hongbing, et al. Hydration heat analysis and crack control of large baseplate [J]. Industrial Construction. 2005, 35(Suppl.): 862866.
[5] 季日臣, 夏修身, 陈尧隆. 承台大体积混凝土温度场计算与温控防裂措施[J]. 混凝土, 2006, 203: 9293.
JI Richen, XIA Xiushen, CHEN Yaolong. Temperature field calculation and preventing crack measure in massive concrete about pillar abutment [J]. Concrete, 2006(09): 9293.
[6] 袁广林, 黄方意, 沈华, 等. 大体积混凝土施工期的水化热温度场及温度应力研究[J]. 混凝土, 2005, 184: 8688.
YUAN Guanglin, HUANG Fangyi, SHEN Hua, et al. Research on temperature field and thermal stress of hydration heat in massive concrete of construction period [J]. Concrete, 2005(2): 8688.
[7] JTG D622004. 公路钢筋混凝土和预应力混凝土桥涵设计规范[S]. 北京:人民交通出版社,2004.
JTG D622004. Code for design of highway reinforced concrete and prestressed concrete bridges and culverts[S]. Beijing: China Communications Press, 2004.
[8] ACI 31808. Building code requirements for structural concrete (ACI 31808) and commentary [S]. Farmington Hills: American Concrete Institute, 2008.
[9] 卢二侠. 大体积混凝土承台水化热温度分析与控制[D]. 长沙:湖南大学, 2007: 4345.
LU Erxia. Analysis and controlling of hydration heat temperature in massive concrete pile cap [D]. Changsha: Hunan University, 2007: 4345.
[10] 朱伯芳, 吴龙珅, 李玥, 等. 加热下部混凝土以防止混凝土结构裂缝的探索[J]. 水利水电技术,2009, 40(2): 3841.
ZHU Bofang, WU Longshen, LI Yue, et al. Researches on prevention of cracking in concrete structures by heating the lower part of the structure [J]. Water Resources and Hydropower Engineering, 2009, 40(2): 3841.