Please wait a minute...
J4  2012, Vol. 46 Issue (12): 2215-2223    DOI: 10.3785/j.issn.1008-973X.2012.12.012
土木工程     
基于极限拉应变法的盾构掘进注浆隆起
对上覆结构的影响
林存刚1, 张忠苗1, 吴世明2, 崔迎辉3
1. 浙江大学 岩土工程研究所,软弱土与环境土工教育部重点实验室,浙江 杭州 310058;
2. 杭州庆春路过江隧道有限公司,浙江 杭州 310002; 3.中国石油独山子石化公司营销调运处,新疆 独山子 833600
Influences of grouting heave on overlying structures in shield tunneling
LIN Cun-gang1, ZHANG Zhong-miao1, WU Shi-ming2, CUI Ying-hui3
1. Institute of Geotechnical Engineering, MOE Key Laboratory of Soft Soils and Geoenvironment Engineering,
Zhejiang University, Hangzhou, 310058, China;2. Hangzhou Qing-chun Road Cross-river Tunnel Company Limited,
Hangzhou,Zhejiang 310002, China; 3. PetroChina Dushanzi Petrochemical Company,Dushanzi 833600, China
 全文: PDF 
摘要:

通过对杭州庆春路过江隧道盾构掘进地面位移的分析,发现横断面地面注浆隆起符合高斯分布;在Peck公式基础上考虑注浆隆起,提出广义Peck公式,可对盾构隧道施工引起的包含注浆隆起在内的横断面地面位移进行合理的预测与反分析.基于极限拉应变法,讨论了地层损失沉降和注浆隆起综合作用对上覆结构的影响.通过一算例分析,对盾构掘进最佳同步注浆量进行了探寻.算例表明:提高注浆建筑空隙填充率对减轻盾构掘进给结构造成的危害是最为关键的,额外注浆反而对结构不利.

关键词: 同步注浆盾构掘进极限拉应变法结构响应注浆隆起    
Abstract:

Through analysis of in-situ monitored ground surface movements due to shield tunnelling in construction of Hangzhou Qingchun Road Cross-river Tunnel,it was found that the transversal ground surface heave induced by tail grouting follows the Gaussian curve pattern. Based on the traditional Peck equation, a generalized Peck equation that takes the grouting heave into account was proposed, which can predict and backanalyze the shield tunnelling-induced ground surface movements including grouting heave inside with great accuracy. Based on the limiting tensile strain method, the combined influences of ground loss and tail grouting on overlying structures were studied. In the case study, the optimum grouting volume was explored. The case study showed that the key to minimize tunnelling’s damage to overlying structures is to increase the factor of grouting , while additional grouting is harmful to the structures’ safety.

Key words: synchronized grouting    shield tunnelling    limiting tensile strain method    structure’s response    grouting heave
出版日期: 2013-01-08
:  TU 443  
基金资助:

国家自然科学基金资助项目(51078330);杭州庆春路过江隧道科研资助项目.

作者简介: 林存刚(1986—),男,博士生,主要从事软土地层盾构隧道施工环境影响及隧道长期稳定性、耐久性研究. E-mail:cunganglin@163.com.
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  

引用本文:

林存刚, 张忠苗, 吴世明, 崔迎辉. 基于极限拉应变法的盾构掘进注浆隆起
对上覆结构的影响[J]. J4, 2012, 46(12): 2215-2223.

LIN Cun-gang, ZHANG Zhong-miao, WU Shi-ming, CUI Ying-hui. Influences of grouting heave on overlying structures in shield tunneling. J4, 2012, 46(12): 2215-2223.

链接本文:

http://www.zjujournals.com/xueshu/eng/CN/10.3785/j.issn.1008-973X.2012.12.012        http://www.zjujournals.com/xueshu/eng/CN/Y2012/V46/I12/2215

[1] PECK R B. Deep excavations and tunneling in soft ground[C]∥State of the Art Report. Proceedings of 7th International Conference on Soil Mechanics and Foundation Engineering. Mexico City: [s.n.], 1969: 225-290.
[2] SAGASETA C. Analysis of undrained soil deformation due to ground loss[J]. Géotechnique,1987,37(3): 30-320.
[3] VERRUIJT A,BOOKER J R. Surface settlements due to deformation of a tunnel in an elastic halfplane[J]. Géotechnique,1996,46(4): 753-756.
[4] LOGANATHAN N,POULOS H G. Analytical prediction for tunnelinginduced ground movements in clays[J]. Journal of Geotechnical and Geoenvironmental Engineering,1998,124(9): 846-856.
[5] CHIS Y,CHERN J C,LIN C C. Optimized backanalysis for tunnelinginduced ground movement using equivalent ground loss model[J]. Tunnelling and Underground Space Technology,2001,16(3): 159-165.
[6] PARK K H. Analytical solution for tunnellinginduced ground movement in clays[J]. Tunnelling and Underground Space Technology,2005,20(3): 249-261.
[7] BOSCARDIN M D,CORDING E J. Building response to excavationinduced settlement[J].Journal of Geotechnical Engineering,1989,115(1): 1-21.
[8] POTTS D M,ADDENBROOKE T I. A structure’s influence on thunnellinginduced ground movements[J].Proceedings of the ICEGeotechnical Engineering,1997,125(2): 109-125.
[9] BURLAND J B, STANDING J R, JARDINE F M. Building response to tunneling: Case studies from construction of the Jubilee Line Extension, London[M]. London : Thomas Telford Publishing, Thomas Telford Ltd, 2001: 23-43.
[10] NETZEL H D. Building response due to ground movements[D]. Amsterdam, Netherlands: Delft University of Technology, 2009: 37-46.
[11] FRANZIUS J N. Behaviour of buildings due to tunnel induced subsidence[D]. London :Department of Civil and Environmental Engineering Imperial College of Science, Technology and Medicine,2003: 56-79.
[12] 吴世明,林存刚,张忠苗,等.泥水盾构下穿堤防的风险分析及控制研究[J].岩石力学与工程学报,2011,30(5): 1034-1042.
WU Shiming,LIN Cungang,ZHANG Zhongmiao,et al. Risk analysis and control for slurry shield underpassing embankment[J].Chinese Journal of Rock Mechanics and Engineering, 2011,30(5): 1034-1042.
[13] 尹旅超,朱振宏,李玉珍,等.日本隧道盾构新技术[M].武汉:华中理工大学出版社,1999: 46-101.
[14] SHIRLAW J N, RICHARDS D P, RAMOND P, et al. Recent experience in automatic tail void grouting with soft ground tunnel boring machines[C]∥ITAAITES World Tunnel Congress. Singapore:[s.n.], 2004.
[15] LEE K M, JI H W, SHEN C K, et al. Ground response to the construction of Shanghai Metro TunnelLine 2[J].Soils and Foundations,1999,39(3): 113-134.
[16] MELIS M, MEDINA L, RODRIGUEZ J M. Prediction and analysis of subsidence induced by shield tunnelling in the Madrid Metro extension[J]. Canadian Geotechnical Journal, 2002, 39(6): 1273-1287.
[17] MAYNAR M M, RODRIGUEZ L M. Predicted versus measured soil movements induced by shield tunnelling in the Madrid Metro extension[J]. Canadian Geotechnical Journal, 2005, 42(4): 1160-1172.
[18] 肖衡.大直径泥水盾构掘进对土体的扰动研究[D].北京:北京交通大学土木建筑工程学院,2009: 234. XIAO Heng. Study on soil disturbance caused by large diameter slurry shield tunnelling[D].Beijing: School of Civil Engineering, Beijing Jiaotong University,2009: 2-34.
[19] ROWE R K, LO K Y, KACK G J. A method of estimating surface settlement above tunnels constructed in soft ground[J].Canadian Geotechnical Journal,1983,20(8): 11-22.
[20] LEE K M, POWE R K, LO  K Y. Subsidence owing to tunnelling. I: Estimating the gap parameter[J]. Canadian Geotechnical Journal,1992,29(6): 929-940.
[21] BURLAND J B, WROTH C P. Settlements of buildings and associated damage, State of the art review[C]∥ Conference on Settlement of Structure. London: Pentech Press, 1974: 611-654.
[22] 张忠苗,林存刚,吴世明,等.过江盾构隧道穿越大堤的地层沉降分析及控制[J].岩土工程学报,2011,33(6): 977-984.
ZHANG Zhongmiao, LIN Cungang, WU Shiming,et al.Analysis and control of ground settlement of embankments in construction of crossriver shield tunnels[J] Chinese Journal of Geotechnical Engineering, 2011,33(6): 977-984.

[1] 张雪辉, 陈吉祥, 白云, 陈昂, 黄德中. 类矩形土压平衡盾构施工引起的地表变形[J]. 浙江大学学报(工学版), 2018, 52(2): 317-324.
[2] 梁荣柱,潘金龙,林存刚,单华峰,孙廉威. 软土地区盾构施工沉降界限[J]. 浙江大学学报(工学版), 2014, 48(7): 1148-1154.
[3] 梁荣柱,潘金龙,林存刚,单华峰,孙廉威.  软土地区盾构施工沉降界限[J]. J4, 2014, 48(2): 0-00.
[4] 刘国斌, 龚国芳, 周如林, 施虎. 盾构掘进机液压系统参数匹配特性[J]. J4, 2011, 45(10): 1809-1814.
[5] 邢彤, 杨华勇, 龚国芳. 盾构刀盘驱动液压系统效率对比研究[J]. J4, 2010, 44(2): 358-363+372.
[6] 邢彤 杨华勇 龚国芳. 盾构机液压系统多泵优化组合驱动技术[J]. J4, 2009, 43(3): 511-516.
[7] 王柏生 徐仲杰 杨英武. 预测列车引起拟建建筑物的振动[J]. J4, 2008, 42(9): 1502-1505.
[8] 胡国良 龚国芳 杨华勇. 盾构掘进机土压平衡的实现[J]. J4, 2006, 40(5): 874-877.