[1] 毛江鸿,陈佳芸,崔磊,等. 氯盐侵蚀钢筋混凝土锈胀开裂监测及预测方法[J]. 建筑材料学报, 2016, 19(1):59-64. MAO Jiang-hong, CHEN Jia-yun, CUI Lei, et al. Monitoring and predicting method for reinforced concrete expansion and cracking induced by chloride erosion[J]. Journal of Building Materials, 2016, 19(1):59-64.
[2] 王晓舟,金伟良,延永东. 混凝土结构锈胀开裂预测的路径概率模型[J]. 浙江大学学报:工学版, 2010, 44(6):1191-1196. WANG Xiao-zhou, JIN Wei-liang, YAN Yong-dong. Path probability model of corrosion-crack assessment for existing reinforced concrete structures[J]. Journal of Zhejiang University:Engineering Science, 2010, 44(6):1191-1196.
[3] LI Fu-min, YUAN Ying-shu, LI C Q. Corrosion propagation of prestressing steel strands in concrete subject to chloride attack[J]. Construction and Building Materials, 2011, 25(10):3878-3885.
[4] 王治,金贤玉,付传清,等. 基于损伤的钢筋混凝土锈胀开裂模型[J]. 建筑结构学报, 2014, 35(9):115-122. WANG Zhi,JIN Xian-yu,FU Chuan-qing,et al. Concrete cracking model for rust expansion based on damage[J]. Journal of Building Structures, 2014, 35(9):115-122.
[5] ZHAO Yu-xi, JIN Wei-liang. Modeling the amount of steel corrosion at the cracking of concrete cover[J]. Advance in Structural Engineering, 2006, 9(5):687-696.
[6] BAZANT Z. Physical model for steel corrosion in concrete sea structures:theory[J]. Journal of the Structural Division, 1979, 105(6):1155-1166.
[7] ZHAO Yu-xi, YU Jiang, HU Bing-yan, et al.Crack shape and rust distribution in corrosion-induced cracking concrete[J]. Corrosion Science, 2012, 55:385-393.
[8] LU Chun-hua, JIN Wei-liang, LIU Rong-gui.Reinforcement corrosion-induced cover cracking and its time prediction for reinforced concrete structures[J]. Corrosion Science, 2011, 53(4):1337-1347.
[9] ŠAVIJA B, LUKOVIC M, HOSSEINI S, et al.Corrosion induced cover cracking studied by X-ray computed tomography, nanoindentation, and energy dispersive X-ray spectrometry (EDS)[J]. Materials and Structures, 2015, 48(7):2043-2062.
[10] JAFFER S J, HANSSON C M. Chloride-induced corrosion products of steel in cracked-concrete subjected to different loading conditions[J]. Cement and Concrete Research, 2009, 39(2):116-125.
[11] 吴灵杰,寇新建,周拥军,等. 既有钢筋混凝土码头保护层锈胀开裂计算时长对比[J]. 哈尔滨工业大学学报, 2016, 48(12):51-55. WU Ling-jie,KOU Xin-jian,ZHOU Yong-jun,et al. Propagation assessment of existing concrete dock based on concrete cover corrosion-crack[J]. Journal of Harbin Institute of Technology, 2016, 48(12):51-55.
[12] TORRES-ACOSTA A A, NAVARRO-GUTIERREZ S, TERAN-GUILLEN J. Residual flexure capacity of corroded reinforced concrete beams[J]. Engineering Structures, 2007, 29(6):1145-1152.
[13] LI C Q, YANG S T. Prediction of concrete crack width under combined reinforcement corrosion and applied load[J]. Journal of Engineering Mechanics, 2011, 137(11):722-731.
[14] KHAN I, FRANCOIS R, CASTEL A. Prediction of reinforcement corrosion using corrosion induced cracks width in corroded reinforced concrete beams[J]. Cement and Concrete Research, 2014, 56:84-96.
[15] DAI Li-zhao, WANG Lei, ZHANG Jian-ren, et al.A global model for corrosion-induced cracking in prestressed concrete structures[J]. Engineering Failure and Analysis, 2016, 62:263-275.
[16] FARROW W C, HIGGINS C. Tests of reinforced concrete beams with corrosiondamaged stirrups[J]. ACI Structural Journal, 2006, 103(1):133-141.
[17] OH B H, KIM E S, CHOI Y C. Theoretical analysis of transfer lengths in pretensioned prestressed concrete members[J]. Journal of Engineering Mechanics, 2006, 132(10):1057-1066.
[18] ALBERTO T R, CANH N D, HALE W M, et al. A higher-order equation for modeling strand bond in pretensioned concrete beams[J]. Engineering Structures, 2017, 131:345-361.
[19] MAADDAWY T E, SOUDKI K. A model for prediction of time from corrosion initiation[J]. Cement and Concrete Composites, 2007, 29(3):168-175. |