LIANG Rong-zhu1,2, PAN Jin-long3, LIN Cun-gang4, SHAN Hua-feng1,2, SUN Lian-wei1,2
1. College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China; 2. Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China; 3.Hangzhou Geotechnical Engineering Limited Company, Hangzhou 310014, China; 4. College of Civil Construction and Environmental Engineering, Ningbo University, Ningbo 315211, China
Download:   PDF(781KB) HTML
Export: BibTeX | EndNote (RIS)      

Abstract  

The time boundary between the immediate and consolidation settlements was analyzed by using the “vi settlement-rate method” and “linear-curve fitting method” based on the field-observed ground settlements in construction of the Hangzhou Metro Line-2. Results show that when no ground heave is observed, the ground movements can be classified into three stages, of which the immediate and consolidation settlements can be respectively fitted by lines of different slopes. Slope of the fitting-lines for the immediate settlements is generally stiffer than that for the consolidation settlements. Settlements due to consolidation start to be predominant about 85-9 days after passage of the shield tail. The ground heave is observed and the ground is severely disturbed during the process of heavy pressure backfilling grouting. In this condition, the ground movements can be separated into five stages, and consolidation settlements predominate about 105~12 days after passage of the shield tail.



Published: 04 August 2014
CLC:  TU 477  
Cite this article:

LIANG Rong-zhu, PAN Jin-long, LIN Cun-gang, SHAN Hua-feng, SUN Lian-wei. Settlement boundary induced by shield tunnelling in soft ground. JOURNAL OF ZHEJIANG UNIVERSITY (ENGINEERING SCIENCE), 2014, 48(7): 1148-1154.

URL:

http://www.zjujournals.com/eng/10.3785/j.issn.1008-973X.2014.07.002     OR     http://www.zjujournals.com/eng/Y2014/V48/I7/1148


软土地区盾构施工沉降界限

结合杭州地铁二号线实测沉降,采用“vi速度法”及“拟合直线法”分析不排水瞬时沉降与排水固结沉降的时间界限.分析发现,在地表无隆起的情况下,可以将地表变形分成3个阶段,其中瞬时沉降及固结沉降可以分别拟合为斜率不同的直线,前者斜率大于后者.在盾构脱开管片85~9 d后,地层进入排水固结阶段. 在同步注浆导致地表隆起的情况下,地层受到二次扰动,可以将地表变形分为5个阶段,在盾尾脱开管片105~12 d后,地层进入排水固结阶段.

[1] SHIRLAW J N. Pore pressures around tunnels in clay: discussion [J]. Canadian Geotechnical Journal, 1993, 30(60):1044-1046.
[2] PECK R B. Deep excavations and tunneling in soft ground [C]∥State of the Art Report. Proceedings of 7th International Conference on Soil Mechanics and Foundation Engineering. Mexico: [s. n.], 1969: 225-290.
[3] PARK K H. Analytical solution for tunnelling-induced ground movement in clays [J]. Tunnelling and Underground Space Technology, 2005, 20(3):249-261.
[4] LOGANATHAN N, POULOS H G. Analytical prediction for tunneling-induced ground movements in clays [J]. Journal of Geotechnical and Geoenvironmental Engineering, 1998, 124(9): 846-856.
[5] VERRUIJT A,BOOKER J R. Surface settlements due to deformation of a tunnel in an elastic half plane [J]. Géotechnique, 1996, 46(4):753-756.
[6] SAGASETA C. Analysis of undrained soil deformation due to ground loss [J]. Géotechnique, 1987, 37(3):301-320.
[7] ROWE R K, LEE K M. Subsidence owing to tunnelling.II. Evaluation of a prediction technique [J]. Canadian Geotechnical Journal, 1992, 29(6): 941-954.
[8] 阳军生,刘宝琛. 城市隧道施工引起的地表移动及变形[M]. 北京:中国铁道出版社, 2002.
[9]DIAS D, KASTNER R. Movements caused by the excavation of tunnels using face pressurized shields: analysis of monitoring and numerical results [J]. Engineering Geology, 2013, 152(1): 17-25.
[10] FANG Y S, LIN S J, LIN J S. Time and settlement in EPB shield tunneling [J]. Tunnels and Tunnelling, 1993, 25(11): 27-28.
[11] HULME T W, SHIRLAW J N, HWANG R N. Settlements during the underground construction of the Singapore MRT [C]∥ Proceedings of 10th Southeast Asian Geotechnical Conference. Taipei: [s. n.], 1990: 521-526.
[12] SHIRLAW J N. Observed and calculated pore pressures and deformations induced by an earth balance shield: discussion [J]. Canadian Geotechnical Journal, 1995, 32(1): 476-490.
[13] OREILLY M P, NEW B M. Settlements above tunnels in the United Kingdom: their magnitude and prediction [C]∥ Proceeding of 3rd Tunnelling 82 Symposium, Institution of Mining and Metallurgy. London: [s. n.], 1982: 173-181.
[14] STANDING J R, BURLAND J B. Unexpected tunneling volume losses in the Westminster area, London [J]. Géotechnique, 2006, 56(1): 11-26.
[15] 魏纲. 盾构隧道施工引起的土体损失率取值及分布研究[J],岩土工程学报,2010,32(9): 1354-1360.
WEI Gang. Selection and distribution of ground loss ratio induced by shield tunnel construction [J]. Chinese Journal of Geotechnical Engineering, 2010, 32(9): 1354-1360.
[16] NG R M C,LO K Y. Analysis of field performance: the thunder tunnel [J]. Canadian Geotechnical Journal, 1986, 23(1): 30-50.
[17] YI X, ROWE R K, LEE K M. Observed and calculated pore pressures and deformations induced by an earth balance shield [J]. Canadian Geotechnical Journal, 1993, 30(3): 476-490.
[18] BOWERS K H, HILLER D M. Ground movement over three years at the heathrow express rail tunnel [C]∥Proceedings of Geotechnical Aspects of Underground Construction in Soft Ground. London: [s. n.], 1996: 647-652.
[19] MOH Z C, DANIEL H, JU HWANG R N. Ground movements around tunnels in soft ground [C]∥Proceedings of Symposium on Geotechnical Aspects of Underground Construction in Soft Ground. London: [s. n.], 1996: 725-730.
[20] TADASHI H, JUNICHI N, TAKAHIRO K. Prediction of ground deformation due to shield excavation in clayey soils [J]. Soils and Foundations, 1999, 39(3): 53-61.
[21] 张忠苗,林存刚,吴世明,等.过江盾构隧道穿越大堤的地层沉降分析及控制[J].岩土工程学报,2011, 33(6):977-984.
ZHANG Zhong-miao, LIN Cun-gang, WU Shi-ming, et al. Analysis and control of ground settlement of embankments in construction of cross-river shield tunnels [J]. Chinese Journal of Geotechnical Engineering, 2011, 33(6):977-984.
[22] CLOUGH G H, SWEENEY B P, FINNO R J. Measured soil response to EPB shield tunneling [J]. Journal Geotechnical Engineering, ASCE, 1983, 109(2): 131-149.
[23] LEE K M, ROWE R K, LO K Y. Subsidence owing to tunneling. I. estimating the gap parameter [J]. Canadian Geotechnical Journal, 1992, 29(6): 929-940.
[24] LEE K M, JI W H, SHEN C K, et al. Ground response to the construction of Shanghai Metro Tunnel-line2 [J]. Soils and Foundations, 1999, 39(3): 113-134.

[1] LIANG Rong-zhu, PAN Jin-long, LIN Cun-gang,SHAN Hua-feng, SUN Lian-wei. Settlement boundary induced by shield tunnelling in soft ground[J]. JOURNAL OF ZHEJIANG UNIVERSITY (ENGINEERING SCIENCE), 2014, 48(2): 0-00.