Project planning method for engineering-to-order product mass customization |
SU Shao-hui1,2, JI Yang-jian1, QI Guo-ning1, CHEN Guo-jin2 |
(1. Institute of Manufacturing Engineering, Zhejiang University, Hangzhou 310027, China;
2. School of Mechanical Engineering, Hangzhou Dianzi University, Hangzhou 310018,China) |
|
|
Abstract A rapid project planning method based on project main plan was proposed, according to the feature of engineering to order (ETO) product mass customization. Project main plan was established based on the product main structure. The process of project plan instantiation was researched, and the project plan knowledge base was described. The project plan of ETO product mass customization could be built rapidly through project plan instantiation, so the project plan was efficiently implemented. An engine product example was given to verify the feasibility of the principle. The engine project’s main plan was built up in a specific application system, and the project plan instantiation of engine product was realized. Accordingly, the project plan of the engine can be carried out efficiently.
|
Published: 29 November 2009
|
|
面向ETO产品大批量定制的项目规划方法研究
针对按订单设计(ETO)产品大批量定制的特点,提出基于项目主规划的快速项目规划方法.在ETO产品主结构的基础上构建了项目主规划,对基于项目主规划的项目规划派生流程进行了研究,对项目规划派生过程中用到的项目规划规则库进行描述;基于规则的项目规划派生能够快速生成ETO产品大批量定制的项目规划,提高项目规划效率.以柴油机产品为例进行了应用验证,在一个具体的应用系统中建立柴油机的项目主规划,实现柴油机大批量定制项目规划的派生,从而提高柴油机大批量定制项目规划效率,缩短项目规划时间.
|
|
[1] 陈昆玉,覃正.大规模定制:企业竞争的新范式[J]. 科学学与科学技术管理,2002,23(2):4951.
CHEN Kun-yu, TAN Zheng. Mass customization: new method of enterprise competition [J]. Science of Science and Management of S.& T., 2002,23( 2): 4951.
[2] 李贵春,李从东,李龙洙.MC供应链的集成优化理论与方法[J].天津大学学报:社会科学版,2005,7(4):280284.
LI Gui-chun, LI Cong-dong, LI Long-zhu. Theories and methods of integration and optimization of supply chain based on MC [J]. Journal of Tianjin University:Social Sciences, 2005, 7(4): 280284.
[3] 邱进冬,顾新建.面向大规模定制的项目管理[J].成组技术与生产现代化,2003,20(1):3437.
QIU Jin-dong, GU Xin-jian. The probe of project management for mass customization [J]. Group Technology & Production Modernization, 2003, 20(1): 3437.
[4] WANG Juite. A fuzzy project scheduling approach to minimize schedule risk for product development [J].Fuzzy Sets and Systems, 2002, 127(2): 99116.
[5] 徐志勇.航空产品项目计划及监控技术研究[D].西安:西北工业大学,2006.
XU Zhi-yong. Research on the key techniques of project planning and monitoring for aviation products [D]. Xian: Northwestern Polytechnical University, 2006.
[6] NICHOLAS J M.面向商务和技术的项目管理原理与实践[M].蔚林巍,译.北京:清华大学出版社,2003:145146.
[7] 袁家军.神舟飞船系统工程管理[M].北京:机械工业出版社,2005.
[8] WILEY V D. DECKRO R F, JACKSON J A. Optimization analysis for design and planning of multi-project programs[J]. European Journal of Operational Research, 1998, 107(2): 492506.
[9] HARTMANN S, SPRECHER A. A note on hierarchical models for multi-project planning and scheduling[J].European Journal of Operational Research, 1996, 67(2): 377383.
[10]LOVA A, TORMOS P. Analysis of scheduling schemes and heuristic rules performance in resource-constrained multi-project scheduling[J]. Annals of Operations Research, 2001,102(2):263286.
[11]祁国宁, 顾新建, 谭建荣. 大批量定制技术及其应用[M]. 北京:机械工业出版社,2003. |
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|