[1] 施虎,杨华勇,龚国芳,等.盾构掘进机关键技术及模拟试验台现状与展望[J].浙江大学学报:工学版,2013,47(5):741-749. SHI Hu, YANG Hua-yong, GONG Guo-fang, et al. Key technologies of shield tunneling machine and present status and prospect of test rigs for tunneling simulation[J]. Journal of Zhejiang University:Engineering Science, 2013, 47(5):741-749.
[2] 刘统,龚国芳,彭左,等.基于液压变压器的TBM刀盘混合驱动系统[J].浙江大学学报:工学版,2016,50(3):419-427. LIU Tong, GONG Guo-fang, PENG Zuo, et al. Hybrid cutterhead driving system for TBM based on hydraulic transformer[J]. Journal of Zhejiang University:Engineering Science, 2016, 50(3):419-427.
[3] HASSANPOUR R, ROSTAMI J, VNVER B. 3D finite difference model for simulation of double shield TBM tunneling in squeezing grounds[J]. Tunnelling and Underground Space Technology, 2014, 40:109-126.
[4] ROSTAMI J. Study of pressure distribution within the crushed zone in the contact area between rock and disc cutters[J]. International Journal of Rock Mechanics and Mining Sciences, 2013, 57:172-186.
[5] 夏毅敏,欧阳涛,陈雷,等.盘形滚刀破岩力影响因素研究[J].应用基础与工程科学学报,2012,20(3):500-507. XIA Yi-min, OUYANG Tao, CHEN Lei, et al. Study on the influencing factors of the disc cutter performance[J]. Journal of Basic Science and Engineering, 2012,20(3):500-507.
[6] 霍军周,杨静,孙伟,等.不同模式下TBM刀群三维回转切削仿真与优化设计[J].哈尔滨工程大学学报,2014,35(11):1403-1408. HUO Jun-zhou, YANG Jing, SUN Wei, et al. Simulation and optimization design of three-dimensional rotating cutting action of TBM cutter group with different modes[J]. Journal of Harbin Engineering University, 2014, 35(11):1403-1408.
[7] 龚秋明,何冠文,赵晓豹,等.掘进机刀盘滚刀间距对北山花岗岩破岩效率的影响实验研究[J].岩土工程学报,2015, 37(1):54-60. GONG Qiu-ming, HE Guan-wen, ZHAO Xiao-bao, et al. Influence of different cutter spacings on rock fragmentation efficiency of Beishan granite by TBM[J]. Chinese Journal of Geotechnical Engineering, 2015,37(1):54-60.
[8] 刘建琴,刘蒙蒙,郭伟.硬岩掘进机盘型滚刀回转破岩仿真研究[J].机械工程学报,2015,51(9):199-205. LIU Jian-qin, LIU Meng-meng, GUO Wei. Research on the simulation of cutting rock rotary by hard rock tunnel boring machine disc cutters[J]. Journal of Mechanical Engineering, 2015, 51(9):199-205.
[9] GERTSCH R, GERTSCH L, ROSTAMI J. Disc cutting tests in colorado red granite:implications for TBM performance prediction[J]. International Journal of rock mechanics and mining sciences, 2007, 44(2):238-246.
[10] CHO J W, JEON S, YU S H, et al. Optimum spacing of TBM disc cutters:a numerical simulation using the three-dimensional dynamic fracturing method[J]. Tunnelling and Underground Space Technology, 2010,25(3):230-244.
[11] CHO J W, JEON S, JEONG H Y, et al. Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear-cutting-machine testing and photogrammetric measurement[J]. Tunnelling and Underground Space Technology, 2013, 35:37-54.
[12] ZHAO X B, YAO X H, GONG Q M, et al. Comparison study on rock crack pattern under a single normal and inclined disc cutter by linear cutting experiments[J]. Tunnelling and Underground Space Technology, 2015, 50:479-489.
[13] GENG Q, WEI Z Y, MENG H. An experimental research on the rock cutting process of the gage cutters for rock tunnel boring machine (TBM)[J]. Tunnelling and Underground Space Technology, 2016, 52:182-191.
[14] TUMAC D, BALCI C. Investigations into the cutting characteristics of CCS type disc cutters and the comparison between experimental, theoretical and empirical force estimations[J]. Tunnelling and Underground Space Technology, 2015, 45:84-98.
[15] XIA Y M, OUYANG T, ZHANG X M, et al. Mechanical model of breaking rock and force characteristic of disc cutter[J]. Journal of Central South University, 2012, 19(7):1846-1858.
[16] 杨凯.TBM滚刀不同切削顺序下破岩特性及优化布置研究[D].长沙:中南大学,2014. YANG Kai. Research on rock-breaking characteristics of TBM disc cutter under different cutting sequences and cutter optimal layout[D]. Changsha:Central South University, 2014.
[17] 刘小伟.引洮工程红层软岩隧洞工程地质研究[D].兰州:兰州大学,2008. LIU Xiao-wei. Study on engineering geology of red bed soft rock tunnel in Yintao project[D]. Lanzhou:Lanzhou University, 2008.
[18] 黄风良,孙志坚,李鹏程,等.带扰流孔波纹板的传热和阻力特性[J].浙江大学学报:工学版,2015,49(7):1242-1248. HUANG Feng-liang, SUN Zhi-jian, LI Peng-cheng, et al. Heat transfer and resistance characteristics of corrugated plate with spoiler holes[J]. Journal of Zhejiang University:Engineering Science, 2015, 49(7):1242-1248.
[19] 侯旭丰,高波,申玉生,等.基于正交试验浅埋暗挖洞桩法车站边桩的影响因素分析[J].铁道科学与工程学报,2016,13(12):2463-2470. HOU Xu-feng, GAO Bo, SHEN Yu-sheng, et al.Analysis of side pile influencing factors in shallow underground excavated cave pile method station based on orthogonal test[J]. Journal of Railway Science andEngineering, 2016, 13(12):2463-2470. |