[1] XIE J, HUNTER M, IRWIN P. Experimental and analytical approaches in wind engineering studies for bridges[C]//Proceedings of IABSE Symposium on "Responding to Tomorrow's Challenges in Structural Engineering". Budapest, Hungary:IABSE. 2006,92(14):9-16.
[2] 项海帆.现代桥梁抗风理论与实践[M].北京:人民交通出版社,2005:50-97.
[3] SIMIU E, SCANLAN R H. Wind effects on structures-fundamentals and applications to design[M]. 3rd Edition, New York:John Wiley & Sons, New York NY, 1996:446-486.
[4] STRØMMEN E N. Theory of brid-ge aerodynamics[M], Berlin Heidelberg:Springer-Verlag, 2006. 91-208.
[5] GE Y, TANAKA H. Aerodynamic flutter analysis of cable-supported bridges by multi-mode and full-mode approaches[J]. Journal of Wind Engineering and Industrial Aerodynamics, 2000, 86(2/3):123-153.
[6] DING Q, CHEN A, XIANG H. Coupled buffeting response analysis of long-span bridges by the CQC approach[J]. Structural Engineering and Mechanics, 2002, 14(5):505-520.
[7] XIE J, YANG D. Wind Engineering Studies for Provencher Pedestrian Bridge[C]//Proceedings of 7th International Conference on Short and Medium Span Bridges. Montreal, Quebec, Canad:CURRAN, 2006,1:203-313.
[8] XIE J, TANAKA H, WARDLAW R L, et al. Buffeting Analysis of long span bridges to turbulent wind with yaw angle[J]. Journal of Wind Engineering and Industrial Aerodynamics, 1991, 37(1):65-77.
[9] DIANA G, CHELI F, ZASSO A, et al. Suspension bridge response to turbulent wind:comparison of a new numerical simulation results with full scale data[C]//Proceedings of 10th International. Conference on Wind Engineering. Copenhagen Denmark:AA Balkema 1999:871-878.
[10] XU Y L, SUN D K, KO J M, et al. Fully coupled buffeting analysis of tsing ma suspension bridge[J]. Journal of Wind Engineering and Industrial Aerodynamics, 2000, 85(1):97-117.
[11] ZHU L D, XU Y L. Buffeting response of long cable-supported bridges under skew winds-part I:Theory[J]. Journal of Sound and Vibration, 2005, 281(3/5):647-673.
[12] BENNISON S J. Designing the Grand Canyon's new laminated glass walkway[R]. Glass performance days, 2007.
[13] 高斐,冯文焕.高墩大跨连续刚构桥气弹模型风洞试验研究[J].现代交通技术,2012,9(5):33-37. GAO Fei, FENG Wen-huan. Long-span continuous rigid frame bridge with high-rise piers gas model wind tunnel test study[J]. Modern Transport Technology, 2012, 9(5):33-37.
[14] 李永乐,郑史雄,廖海黎.泰安长江大桥最大单悬臂状态气弹模型风洞试验研究[C]//中国铁道学会中国交通土建工程学术暨建设成果交流会.成都:铁道学会,2003, 432:26-37. LI Yong-le, ZHENG Shi-xiong, LIAO Li-hai.Taian Yangtze river bridge's largest single cantilever state gas bomb model wind tunnel test research[C]//China Communications Construction of Academic and Civil Engineering of China Railway Society Communication Meeting. cheng du:Railway society, 2003, 432:26-37.
[15] 周健,熊龙,王骑,等.大跨扁平钢箱梁悬索桥全桥气弹模型设计[J].重庆交通大学学报:自然科学版,2014,33(6):1-4. ZHOU Jian, XIONG Long, WANG QI, et al. Large-span flat steel box girder suspension bridge gas model design[J]. Journal of Chongqing Jiao-tong University:Natural Science Edition, 2014, 33(6):1-4.
[16] Canadian Commission of Building and Fire Codes.User's Guide-NBC 2010 Structural Commentaries (Part 4 of Division B)[S]. Ottawa, Canada:NRCC, 2010.
[17] IRWIN P A, GARBER J, HO E. Integration of wind tunnel data with full scale wind climate[C]//Proceedings of 10th Ameri.cas Conference on Wind Engineering. Baton Rouge, Louisiana, USA:ASCE, 2005.
[18] Committee on Loads and Forces of the Committee on Bridges of the Structural. Division. Recommended design loads for bridges[J]. Journal of Structural Division, Proceeding of ASCE, 1981, 107(7):1161-1213. |