[1] 鲁班咨询.建筑业高增长时代渐行渐远——中国建筑业2014年二季度报告[EB/OL].2015-05-10. http:∥www.lubanway.com/index.phpcontroller=guandian&action=guandian_front&guandian_id=414.
[2] 中国市场调研网.2015年中国建筑设计市场现状调查与未来发展前景趋势报告[EB/OL].2015-05-12. http:∥www.20087.com/201411/JianZhuSheJiFaZhanQuShiFenXi.html.
[3] 建设部.绿色施工导则[J].施工技术,2007,36(11): 14.
CONSTRUCTION M O. Guidelines for green construction [J]. Construction Technology, 2007, 36(11): 14.
[4] GOLDBERG H E. AEC from the ground up: the building information modelin the AEC world, BIM is poised to lead the next big technological evolution [J]. CADalyst, 2004, 21(11): 56-61.
[5] Smith D. United states Building Informati0n Model Standard [C]∥2nd Congress on Digital Collaboration in the Building Industry. Washington DC: American Institute of Architects, 2005.
[6] HAN N, YUE Z F, LU Y F. Collision detection of building facility pipes and ducts based on BIM technology\[J\]. Advanced Materials Research, 2012, 346:312-317.
[7] KIM I, KIM J, SEO J. Development of an IFCbased IDF converter for supporting energy performance assessment in the early design phase [J]. Journal of Asian Architecture and Building Engineering, 2012, 11(2):313-320.
[8] BRYDE D, BROQUETAS M, VOLM J M. The project benefits of building information modelling (BIM) [J]. International Journal of Project Management, 2013,31(7): 971-980.
[9] PORWAL A, HEWAGE K N. Building information modeling (BIM) partnering framework for public construction projects [J]. Automation in Construction, 2013, 31: 204-214.
[10] ARAYICI Y, COATES P, KOSKELA L, et al. Technology adoption in the BIM implementation for lean architectural practice [J]. Automation in Construction, 2011, 20(2): 189-195.
[11] WANG Y, WANG X, WANG J, et al. Engagement of facilities management in design stage through BIM: framework and a case study [J]. Advances in CivilEngineering, 2013, 2013(3): 1275.
[12] 范喆.基于BIM技术的施工阶段4D资源动态管理[D].北京:清华大学, 2010.
FAN Zhe. BIMbased 4D resources dynamic management in construction [D]. Beijing: Tsinghua University, 2010.
[13] 胡振中,张建平,张新.基于四维时空模型的施工现场物理碰撞检测[J].清华大学学报:自然科学版,2010(6): 820-825.
HU Zhenzhong, ZHANG Jianping, ZHANG Xin. Construction collision detection for site entities based on 4D spacetime model [J]. Journal of Tsinghua University: Science and Technology, 2010(6): 820-825.
[14] 许娜,张雷.基于BIM技术的建筑供应链协同研究[J].北京理工大学学报,2014(12): 1315-1320.
XU Na, ZHANG Lei.Optimaization of building industry supply chain based on BIM technology [J]. Transactions of Beijing Institute of Technology, 2014(12): 1315-1320.
[15] 王宇佳,王佳,于辉.BIM技术在建筑工程施工管理中的应用探索[J].土木建筑工程信息技术,2016, 8(4): 89-93.
WANG Yujia, WANG Jia, YU Hui. Reserarch on the application of BIM technology in the building construction management [J]. Journal of Information Technology in Civil Engineering and Architecture, 2016, 8(4): 8993.
[16] 胡振中,陈祥祥,王亮.基于BIM的管道预制构件设计技术与系统研发[J].清华大学学报:自然科学版,2015(12): 12691275.
HU Zhenzhong, CHEN Xiangxiang, WANG Liang, et al. BIMbased design method for prefabricated pipeline components [J]. Journal of Tsinghua University: Science and Technology, 2015(12): 1269-1275.
[17] 张建平,张洋,张新.基于IFC的BIM三维几何建模及模型转换[J].土木建筑工程信息技术,2009, 1(1):40-46.
ZHANG Jianping, ZHANG Yang, ZHANG Xin. Methodology of 3D geometric modeling and model conversion of IFC 2based BIM [J]. Journal of Information Technology in Civil Engineering and Architecture, 2009, 1(1): 40-46.
[18] CHEW L P. Constrained delaunay triangulations [J]. Algorithmica, 1989, 4(14): 97-108.
[19] LEE G, SACKS R, EASTMAN C M. Specifying parametric building object behavior (BOB) for a building information modeling system [J]. Automation in Construction, 2006, 15(6): 758-776.
[20] SACKS R, EASTMAN C M, LEE G. Parametric 3D modeling in building construction with examples from precast concrete [J]. Automation in Construction, 2004, 13(3): 291-312. |