机械与能源工程 |
|
|
|
|
基于不完整数据的变压器全生命周期成本 |
唐维,陈芨熙,王子龙,郑佳俊,顾新建 |
浙江大学 机械工程学系,浙江 杭州 310027 |
|
Life cycle cost assessment for transformer based on incomplete records |
TANG Wei, CHEN Ji-xi, WANG Zi-long, ZHENG Jia-jun, GU Xin-jian |
Department of Mechanical Engineering, Zhejiang University, Hangzhou 310027, China |
引用本文:
唐维,陈芨熙,王子龙,郑佳俊,顾新建. 基于不完整数据的变压器全生命周期成本[J]. J4, 2014, 48(1): 42-49.
TANG Wei, CHEN Ji-xi, WANG Zi-long, ZHENG Jia-jun, GU Xin-jian. Life cycle cost assessment for transformer based on incomplete records. J4, 2014, 48(1): 42-49.
链接本文:
http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2014.01.007
或
http://www.zjujournals.com/eng/CN/Y2014/V48/I1/42
|
[1]陆爽,陈红兵,肖福利.资产全寿命周期管理在物资采购中的应用研究[J].华东电力,2010,38(9):1323-1326.
LU Shuang, CHEN Hong-bing, XIAO Fu-li. Research on application of life cycle asset management in materials procurement [J].East China Electric Power,2010,38(9):1323-1326.
[2] 帅国庆.电力企业资产全寿命周期管理:理论、方法及应用[M].北京:中国电力出版社,2010: 2045.
[3] 夏成军,邱桂华,黄冬燕,等.电力变压器全寿命周期成本模型及灵敏度分析[J]. 华东电力,2012,40(1):26-30.
XIA Cheng-jun,QIU Gui-hua,HUANG Dong-yan, et al. Life cycle cost model and sensitivity analysis of power transformer [J]. East China Electric Power,2012,40(1):26-30.
[4] 姜益民. 变压器的全寿命周期成本分析[J].上海电力,2004(3):188-191.
JIANG Yi-min. LCC assessment on transformer [J]. Shanghai Electric Power, 2004(3):188-191.
[5] 刘建强,钟立华,马仲能,等. 资产全寿命周期管理在变压器招评标中的应用[J]. 广东电力,2011, 24(3):17-20.
LIU Jian-qiang,ZHONG Li-hua,MA Zhong-neng, et al. Research on application of LCAM in bid invitation/evaluation of transformers [J]. GuangDong Electric Power, 2011, 24(3):1720.
[6] 孙鹏,陈绍辉,张彩庆. 基于全寿命周期成本模型的变电站设备最佳寿命周期评估[J].南方电网技术,2011(5):96-100.
SUN Peng, CHEN Shao-hui, ZHANG Cai-qing. LCC assessment on the best life cycle of substation equipment [J]. Southern Power System Technology, 2011(5):96-100.
[7] GREENE L F, SHAW B L. The steps for successful life cycle cost analysis [C]∥Proceeding of the IEEE 1990 National Aerospace and Electronics Conference. [S.l.]: IEEE, 1990: 1209-1216.
[8] DOWNING D J, MCCONNELL B W, BARNES P R, et al. Economic analysis of efficient distribution transformer trends [R].\
[S.l.\]:EPA,1998: 89-93.
[9] 陆广香. 最大负荷损耗小时数求取方法质疑 [ J/OL]. [2012-04-12]. http:∥wenku.baidu.com/view/2f16d2ef81c 758f5f61f67cc.html,1996,2.
LU Guang-xiang. Querying for maximum load loss hours calculating method [J/OL]. [2012-04-12].
http:∥wenku.baidu.com/view/ 2f16d2ef81c 758f5f61f67cc.html,1996,2.
[10] CUI Xin-qi,YIN Lai-bin, FAN Chun-ju, et al. Study of LCC for power transformer in modification of transformer substation [J]. Power System Protection and Control, 2010, 38(7):69-73.
[11] 韩天祥,黄华炜,陆一春.LCC管理技术在国外电力系统的研究与应用[J].上海电力,2004(3):192-194.
HAN Tian-xiang, HUANG Hua-wei, LU Yi-chun. LCC management technology research and application in foreign electric power system [J]. Shanghai Electric Power, 2004(3):192-194.
[12] 杜国付,李骥,赵铁城. 空调冷热源系统全寿命周期成本计算软件开发[J]. 建筑科学,2011(2): 21-25.
DU Guo-fu, LI Ji, ZHAO Tie-cheng. Software development of life cycle cost for heat/cold sources of air-conditioning system [J]. Building Science, 2011(2): 21-25. |
|