土木工程 |
|
|
|
|
深水S型铺管收弃管作业分析 |
龚顺风1,徐普1,钟文军2,何宁2,燕晖2 |
1.浙江大学 结构工程研究所,浙江 杭州 310058;2.海洋石油工程股份有限公司,天津 300452 |
|
Analysis on abandonment and recovery of offshore pipeline for deepwater S-lay Operation |
GONG Shun-feng1, XU Pu1, ZHONG Wen-jun2, HE Ning2, YAN Hui2 |
1. Institute of Structural Engineering, Zhejiang University, Hangzhou 310058, China;
2. Offshore Oil Engineering CO. LTD., Tianjin 300452, China |
引用本文:
龚顺风,徐普,钟文军,何宁,燕晖. 深水S型铺管收弃管作业分析[J]. J4, 2013, 47(11): 1904-1910.
GONG Shun-feng, XU Pu, ZHONG Wen-jun, HE Ning, YAN Hui. Analysis on abandonment and recovery of offshore pipeline for deepwater S-lay Operation. J4, 2013, 47(11): 1904-1910.
链接本文:
http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2013.11.003
或
http://www.zjujournals.com/eng/CN/Y2013/V47/I11/1904
|
[1] LI Zhi-gang, WANG Cong, HE Ning, et al. An overview of deepwater pipeline laying technology [J]. China Ocean Engineering, 2008, 22(3): 521-532.
[2] DUAN Meng-lan, WANG Yi, ESTEFEN S, et al. An installation system of deepwater risers by an S-lay vessel [J]. China Ocean Engineering, 2011, 25(1): 139-148.
[3] GARCA-PALACIOS J, SAMARTIN A, NEGRO V. A nonlinear analysis of laying a floating pipeline on the seabed [J]. Engineering Structures, 2009, 31(5): 1120-1131.
[4] JENSEN G A, SFSTRM N, NGUYEN T D, et al. A nonlinear PDE formulation for offshore vessel pipeline installation [J]. Ocean Engineering, 2010, 37(4): 365-377.
[5] WANG Li-zhong, YUAN Feng, GUO Zhen, et al. Numerical analysis of pipeline in J-lay problem [J]. Journal of Zhejiang University-SCIENCE A∶Applied Physics & Engineering, 2010, 11(11): 908-920.
[6] SZCZOTKA M. A modification of the rigid finite element method and its application to the J-lay problem [J]. Acta Mechanica, 2011, 220: 183-198.
[7] YUAN Feng, GUO Zhen, LI Ling-ling, et al. Numerical model for pipeline laying during S-lay [J]. Journal of Offshore Mechanics and Arctic Engineering, 2012, 134(2): 17031-17039.
[8] DATTA T K. Abandonment and recovery solution of submarine pipelines [J]. Applied Ocean Research, 1982, 4(4): 247-252.
[9] 戴英杰, 宋甲宗, 冯刚. 海底管道收弃管作业分析[J]. 海洋工程, 2000, 18(3): 75-78.
DAI Ying-jie, SONG Jia-zong, FENG Gang. A study on abandonment and recovery operation of submarine pipelines [J]. Ocean Engineering, 2000, 18(3): 7578.
[10] 胡亮文. 拾弃管作业的大变形分析[D]. 大连: 大连理工大学, 2009.
Hu Liang-wen. The analysis for large deformation in abandonment and recovery operation of submarine pipeline [D]. Dalian: Dalian University of Technology, 2009.
[11] 龚顺风, 何勇, 周俊, 等. 深水海底管道S型铺设参数敏感性分析[J]. 海洋工程, 2009, 27(4): 87-95.
GONG Shun-feng, HE Yong, ZHOU Jun, et al. Parameter sensitivity analysis of S-lay technique for deepwater submarine pipeline [J]. Ocean Engineering, 2009, 27(4):87-95.
[12] GONG Shun-feng, CHEN Kai, CHEN Yuan, et al. Configuration analysis of deepwater S-lay pipeline [J]. China Ocean Engineering, 2011, 25(3): 519-530.
[13] PLUNKETT R. Static bending stresses in catenaries and drill springs [J]. Journal of Engineering for Industry, ASME, 1967, 89 (1): 31-36.
[14] Malahy C R. Offpipe users guide [M]. version 2.07. Houston: Robert C Malahy Company, 1996: 128. |
|