J4  2012, Vol. 46 Issue (7): 1182-1188    DOI: 10.3785/j.issn.1008-973X.2012.07.005
机械与能源工程     
基于盾构密封舱压力直接反馈地表变形控制
王林涛,龚国芳,施虎,刘怀印
浙江大学 流体动力与机电系统国家重点实验室,浙江 杭州 310027
Ground surface deformation control based on chamber
pressure direct feedback
WANG Lin-tao, GONG Guo-fang, SHI Hu, LIU Huai-yin
State Key Laboratory of Fluid Power Transmission and Control, Zhejiang University, Hangzhou 310027, China
 全文: PDF  HTML
摘要:

为了解决传统地表变形控制方法对施工人员经验的依赖性与控制的滞后性造成施工事故频发的问题,在分析引起盾构前方地表变形原因的基础上,提出密封舱压力直接反馈地表变形控制技术. 以土压平衡盾构为对象,建立2种密封舱压力调节模式的数学模型,并在Φ1.8 m土压平衡盾构综合试验台上开展多次实验,分析引起土压力波动的原因和检验新地表变形控制方法的有效性.实验结果表明,切深率变化会引起密封舱压力波动,不利于地表变形控制.采用密封舱压力直接反馈,通过自整定PID控制器控制螺旋输送机转速可以精确控制排土量和出土率,保证密封舱压力实时平衡,并能将盾构前方地表变形控制在-5~+3 mm,满足隧道施工标准要求.

Abstract:

The cause of the ground surface deformation in front of shield tunneling machine was analyzed and a new method based on the earth pressure of working chamber direct feedback technology was proposed in order to reduce the ground surface deformation in shield tunneling with the conventional method that has great dependence on engineer's construction experience and shows slow response to geological condition change. Mathematical models of two different earth pressure balance (EPB) control modes were given and experiments were conducted on the Φ1.8 m EPB test machine in the lab, so as to analyze the cause of disturbance of the earth pressure and verify the new ground surface deformation control method. The test results indicate that the cutting ratio greatly influences on the earth pressure in working chamber; unstable cutting ratio can result in disturbance of earth pressure in working chamber and goes against ground deformation control. By means of earth pressure direct feedback, the new method can precisely control the volume of discharged soil and discharge rate  using selftuning PID controller so that EPB condition can be kept in real time. As a result, the ground surface deformation in front of the shield machine can be controlled between -5 mm and +3 mm, which meets the standard of shield tunneling.

出版日期: 2012-07-01
:  TU 411  
基金资助:

国家“863” 高技术研究发展计划资助项目(2007AA041804).

通讯作者: 龚国芳,男,教授.     E-mail: gfgong@zju.edu.cn
作者简介: 王林涛(1987-),男,博士生,从事大型掘进装备电液控制技术研究.E-mail:lintaow@zju.edu.cn
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  

引用本文:

王林涛,龚国芳,施虎,刘怀印. 基于盾构密封舱压力直接反馈地表变形控制[J]. J4, 2012, 46(7): 1182-1188.

WANG Lin-tao, GONG Guo-fang, SHI Hu, LIU Huai-yin. Ground surface deformation control based on chamber
pressure direct feedback. J4, 2012, 46(7): 1182-1188.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2012.07.005        http://www.zjujournals.com/eng/CN/Y2012/V46/I7/1182

[1] 刘仁鹏.土压平衡盾构技术综述[J] .现代隧道技术,2000(1):1-7.
LIU Renpeng. Review of earth pressure balance shield [J]. Modern Tunneling Technology, 2000(1): 1-7.
[2] SUCHATVEE S, HERBERT H E. Artificial neural networks for predicting the maximum surface settlement caused by EPB shield tunneling [J]. Tunneling and Underground Space Technology, 2006, 21(2): 133-150.
[3] 周江天.盾构隧道下穿铁路枢纽的风险和沉降控制技术[J]. 特种结构, 2010, 27(4): 7-10.
ZHOU Jiangtian. Risk and displacement prevention technology of shield tunnel going under through the railway terminal [J]. Special Structures, 2010, 27(4): 7-10.
[4] 张冬梅,黄宏伟,王箭明. 盾构推进引起地面沉降的粘弹性分析[J]. 岩土力学,2001, 22(3): 311-314.
ZHANG Dongmei, HUANG Hongwei, WANG Jianming. The viscoelastic analysis of the settlement of the soil above the tunnel caused by shield tunneling [J]. Rock and Soil Mechanics, 2001, 22(3): 311-314.
[5] 胡国良,龚国芳,杨华勇. 盾构掘进机土压平衡的实现[J].浙江大学学报:工学版,2006,40(5):874-877.
HU Guoliang, GONG Guofang, YANG Huayong. Realization of earth pressure balance for shield tunnelling machine [J]. Journal of Zhejiang University: Engineering Science, 2006, 40(5): 874-877.
[6] 徐前卫,朱合华,廖少明, 等. 均匀软质地层条件下土平衡盾构施工的合理顶进推力分析[J]. 岩土工程学报, 2008, 30(1): 79-85.
XU Qianwei, ZHU Hehua,LIAO Shaoming, et al. Analysis of reasonable thrust force during tunnel excavation in homogeneous soft ground by use of earth pressure balance shield machine [J]. Chinese Journal of Geotechnical Engineering, 2008, 30(1): 79-85.
[7] WANG Lintao, GONG Guofang, SHI Hu, et al. Rotation and gate movement compound control of screw conveyor hydraulic system with disturbance compensation [J]. Lecture Notes in Computer Science, 2010, 6424: 329-340.
[8] 刘东亮. EPB盾构掘进的土压控制[J]. 铁道工程学报,2005, 4(2): 45-50.
LIU Dongliang. Earth pressure balance control for EPB shield tunneling [J]. Journal of Railway Engineering Society, 2005, 4(2): 45-50.
[9] 邢彤,龚国芳,杨华勇. 盾构刀盘驱动扭矩计算模型及实验研究[J]. 浙江大学学报: 工学版, 2009, 43(10): 1794-1800.
XING Tong, GONG Guofang, YANG Huayong. Torque calculation of cutting head in shield machine and experimental study [J]. Journal of Zhejiang University: Engineering Science, 2009, 43(10): 1794-1800.
[10] 陈馈. 盾构施工技术[M]. 北京:人民交通出版社,2009: 40-63.
[11] 魏康林. 土压平衡盾构施工中泡沫和膨润土改良土体的微观机理分析[J]. 现代隧道技术, 2007, 44(1): 73-77.
WEI Kanglin. Micromechanism analysis for the soil improvement by foam and bentonite in EPB shield tunneling [J]. Modern Tunneling Technology, 2007, 44(1):73-77.
[12] NOMOTO T, IMAURA S, HAGIWARA T, et al. Shield tunnel construction in centrifuge [J]. Autom Construction, 1997, 5(5): 421-426.
[13] 施虎,龚国芳,杨华勇, 等. 盾构掘进土压平衡控制模型[J]. 煤炭学报, 2008, 33(3): 343-346.
SHI Hu, GONG Guofang, YANG Huayong, et al. Control model of earth pressure balance for shield tunneling [J]. Journal of China Coal Society, 2008, 33(3): 343-346.
[14] 施虎,龚国芳,杨华勇,等. 盾构掘进机推进力计算模型[J]. 浙江大学学报: 工学版, 2011,45(1): 126-131.
SHI Hu, GONG Guofang, YANG Huayong, et al. Determination of thrust force for shield tunneling machine [J]. Journal of Zhejiang University: Engineering Science, 2011, 45(1): 126-131.
[15] YANG Huayong, SHI Hu, GONG Guofang, et al. Earth pressure balance control for EPB shield [J]. Science in China Series  E:Technological Sciences, 2009, 52(10): 2840-2848.
[16] 胡国良,龚国芳,杨华勇. 土压平衡式盾构机土压控制的模拟实验[J]. 液压与气动,2007 (9): 1-3.
HU Guoliang, GONG Guofang, YANG Huayong. Simulating experiment of earth pressure control for EPB shield [J]. Chinese Hydraulics and Pneumatics, 2007 (9): 1-3.
[17] 胡国良. 盾构模拟试验台电液控制系统关键技术研究[D]. 杭州: 浙江大学,2006.
HU Guoliang. Research into electrohydraulic control system for a simulator test rig of shield tunneling machine [D]. Hangzhou: Zhejiang University, 2006.

[1] 刘长殿, 孙红月, 康剑伟, 杜丽丽. 土体的充气阻渗试验[J]. J4, 2014, 48(2): 236-241.
[2] 柯瀚,王文芳,魏长春,陈云敏,詹良通. 填埋体饱和渗透系数影响因素室内研究[J]. J4, 2013, 47(7): 1164-1170.
[3] 刘永莉,孙红月,于洋,詹伟,尚岳全. 基于BOTDR监测技术抗滑桩上滑坡推力确定[J]. J4, 2012, 46(5): 798-803.
[4] 刘永莉, 孙红月, 于洋, 詹伟, 尚岳全. 抗滑桩内力的BOTDR监测分析[J]. J4, 2012, 46(2): 243-249.
[5] 徐日庆,张俊,朱剑锋, 王兴陈. 考虑扰动影响的修正Duncan-Chang模型[J]. J4, 2012, 46(1): 1-7.
[6] 周建, 郑鸿镔, 温晓贵, 管林波, 邓以亮. 考虑中主应力系数影响的主应力轴旋转下
原状软黏土变形研究
[J]. J4, 2011, 45(12): 2134-2141.
[7] 陈国红, 谢康和, 程永峰, 徐妍. 考虑涂抹区渗透系数变化的砂井地基固结解[J]. J4, 2011, 45(4): 665-670.
[8] 施虎,龚国芳,杨华勇,汪慧. 盾构掘进机推进力计算模型[J]. J4, 2011, 45(1): 126-131.