Please wait a minute...
浙江大学学报(工学版)
电气工程     
基于调度“三公”的浙江电力调峰交易市场模型
梅天华1,2, 甘德强1
1.浙江大学 电气工程学院,浙江 杭州 310027; 2. 国家能源局浙江监管办公室,浙江 杭州 310007
Market model of Zhejiang peak load regulation market based on principles of openness, equity and justness
MEI Tian Hua1,2, GAN De qiang1
1. College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China; 2. Zhejiang Energy Regulatory Office of National Energy Administration, Hangzhou 310009, China
 全文: PDF(915 KB)   HTML
摘要:
针对当前电力调峰困难,调峰调度优化和公平性不足的问题,提出调度“三公”模式下的调峰交易市场模型.所提出的交易模型包含2个关键部分:1)在“三公”调度相关规则的基础上,从公平角度建立了不同负荷水平下发电机组的调峰义务分摊模型,确定调峰交易的产权基础.2)结合现行运行规定,建立满足负备用需求的低谷调停及成本分摊模型、可提升系统负荷率的优化调停交易模型和日前调峰交易模型.所提出的调峰交易市场模型较好地解决当前燃煤机组调停与深度调峰激励不足和成本无法得到补偿的问题.基于浙江电网的实际算例验证提出的模型可以适应市场出清面临的计算问题,表明了实用性.
Abstract:
The peak load regulation market model was analyzed conforming to the principles of openness, equity and justness in order to handle the difficulty in achieving electricity peak load regulation resources, insufficient optimization and lacking of equity in peak load dispatching. Two key parts were included in the proposed model. 1) the allocation model of peak load regulating obligation for generators under different load levels was proposed from the view of equity based on the rules of “Three Equity” dispatching, The basis of property right for the peak load regulation trading was obtained. 2) the start up/shut down regulation and cost sharing model in valley load time for satisfying the negative reservation constraint, the start up/shut down trading optimization model for improving the system load factor and the day ahead peak load regulation trading model for improving the system peak load regulation were proposed based on the current rules of regulation. The proposed peak load model can solve the computability problem in the market clearing, and handle the main issues in the current peak load regulation market. Case studies were performed on Zhejiang power grid verified the effectiveness of the proposed model.
出版日期: 2016-02-01
:  TM 73  
通讯作者: 甘德强,男,教授,博导.ORCID: 0000 0002 6347 1817.     E-mail: dgan@zju.edu.cn
作者简介: 梅天华(1980—),男,博士,从事电力市场与电力系统需求侧管理方面的研究.ORCID: 0000 0002 3098 8692.
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  

引用本文:

梅天华, 甘德强. 基于调度“三公”的浙江电力调峰交易市场模型[J]. 浙江大学学报(工学版), 10.3785/j.issn.1008-973X.2016.02.024.

MEI Tian Hua, GAN De qiang. Market model of Zhejiang peak load regulation market based on principles of openness, equity and justness. JOURNAL OF ZHEJIANG UNIVERSITY (ENGINEERING SCIENCE), 10.3785/j.issn.1008-973X.2016.02.024.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2016.02.024        http://www.zjujournals.com/eng/CN/Y2016/V50/I2/369

[1] 王若谷,王建学,张恒,等.水电机组调峰服务的成本分析及实用补偿方法[J],电力系统自动化,2011,35(23): 41-46.
WANG Ruo gu,WANG Jian xue,ZHANG Heng,et al. A cost analysis and practical compensation method for hydropower units peaking service [J]. Automation of Electric Power systems, 2011, 35(23): 41-46.
[2] 王鹏,张灵凌,梁琳,等.火电机组有偿调峰与无偿调峰划分方法探讨[J],电力系统自动化,2010,34(9): 87-90.
WANG Peng, ZHANG Ling ling, LIANG Lin, et al. A method for division of paid peak regulation and free peak regulation for thermal power units [J]. Automation of Electric Power Systems, 2010,34(9): 87-90.
[3] 吴慧军,申建建,程春田,等. 网省两级调度多电源短期联合调峰方法[J],中国电机工程学报,2015,35(11): 2743-2755.
WU Hui jun, SHEN Jian jian, CHENG Chun tian, et al. Coordination method of regional and provincial grids for short term peak shaving operation among hybrid energy sources [J]. Proceedings of the Chinese Society of Electrical Engineering, 2015, 35(11): 2743-2755.
[4] 张志锋,徐 箭,闫秉科,等. 考虑特高压送风电的湖北电网调峰方案[J],电力自动化设备,2013,33(4): 6-11.
ZHANG Zhi feng,XU Jian,YAN Bing ke,et al. Hubei Power Grid peak load regulation considering wind power transmitted by UHV network [J]. Electric Power Automation Equipment, 2013, 33(4): 6-11.
[5] 侯婷婷,娄素华,吴耀武,等.含大型风电场的电力系统调峰运行特性分析[J],电工技术学报,2013,28(5): 105-111.
HOU Ting ting,LOU Su hua,WU Yao wu,et al. Analysis on peak load regulation operation characteristics of power system integrated with large scale wind power [J]. Transactions of China Electrotechnical Society, 2013, 28(5): 105-111.
[6] 原国家电力监管委员会.关于印发并网发电厂辅助服务管理暂行办法的通知(电监市场[2006]43号) [EB/OL].[2011 02 23].http:∥china.findlaw.cn/jingjifa/dianlifa/dlfg/43563_2.html.
State Electricity Regulatory Commission People’s Republic of China. Notification of distribute grid power plant auxiliary service management interim measures ([2006]43) [EB/OL].(2011 02 23).http:∥china.findlaw.cn/jingjifa/dianlifa/dlfg/43563_2.html.
[7] 国家能源局华东监管局.关于印发《印发实施华东区域发电并网运行管理实施细则(试行)》和《华东区域并网发电厂辅助服务管理实施细则(试行)的通知》(华东电监市场2009[65]号) [EB/OL]. (2008 12 25).http:∥www. doc88. com / p 6721807661172.html.
East China Energy Regulatory Bureau of National Energy Administration of the People’s Republic of China. The east China regional power grid operation management rules (trial), East China regional grid power plant auxiliary service management implementation rules (trial) (2009[65]) [EB/OL]. (2008 12 25).http:∥www.doc88.com/p67218076 61172.html.
[8] 梅坚,杨立兵,李晓刚,等. 调峰市场效用分析与低谷调峰市场设计[J],电力系统自动化,2013,37(21): 134138+75.
MEI Jian,YANG Li bing,LI Xiao gang,et al. Utility analysis for peak regulation market and trading market design for peak regulation capacity in valley time[J]. Automation of Electric Power Systems, 2013,37(21): 134138+75.
[9] 胡建军,胡飞雄. 节能发电调度模式下有偿调峰补偿新机制[J],电力系统自动化,2009,33(10): 16-18.
HU Jianjun, HU Feixiong. A novel compensation mechanism of remunerative peak load regulation under energy saving dispatch framework [J]. Automation of Electric Power Systems, 2009,33(10): 16-18.
[10] 国家能源局东北监管局. 东北电力调峰辅助服务市场监管办法[EB/OL].[2014 9 28]. http:∥www.docin. com/p970153000.html.
Northeast China Energy Regulatory Bureau of National Energy Administration. Northeast electric power load auxiliary service market regulation [EB/OL].[2014 9 28]. http:∥www.docin. com/p 970153000.html.
[11] 谢俊,白兴忠,甘德强.水电/火电机组调峰能力的评估与激励[J],浙江大学学报:工学版,2009,43(11):2079-2084.
XIE Jun, BAI Xing zhong, GAN De qiang. Evaluation and incentive mechanism of peaking capability of hydroelectric/thermoelectric generators[J]. Journal of Zhejiang University :Engineering Science, 2009, 43(11): 2079-2084.
[12] HU Zhao yang, CHEN Lin, GAN De qiang, et al. Allocation of unit start up costs using cooperative game theory[J].IEEE Transactions on Power Systems, 2006, 21(2): 653-662.
[13] XIE jun,BAI Xing zhong, FENG dong han, et al. Peaking cost compensation in northwest china power system [J]. European Transactions on Electrical Power, 2009, 19(7): 10161032.
[14] 谢俊,张晓花,吴复霞,等. 基于合作博弈论和工程方法的调峰费用分摊[J],电力系统保护与控制,2012,40(11): 16-23.
XIE Jun, ZHANG Xiao hua,WU Fu xia,et al. Peaking cost allocation using cooperative game theory and engineering concept [J]. Power System Protection and Control, 2012, 40(11): 16-23.
[15] 高志华,任震,黄雯莹. 电力市场中调峰权及其交易机制[J].中国电机工程学报,2005,25(5): 88-92.
GAO Zhi hua, REN Zhen, HUANG Wen ying. Peak regulation right and the corresponding transaction mechanism in electricity market [J]. Proceedings of the Chinese Society of Electrical Engineering, 2005, 25(5): 88-92.
[16] 徐辰婧,黄民翔,柯人观. 考虑节能减排效益的调峰权交易研究[J],华东电力,2014,42(2): 236-239.
XU Chen jing, HUANG Min xiang, KE Ren guan, Peak regulation right transaction considering energy saving and emission reduction [J]. East China Electric Power, 2014, 42(2): 236-239.
[17] 国家发改委.关于加强和改进发电运行调节管理的指导意见(发改运行[2014]985号).[EB/OL]. (2014 5 18). http:∥www.ndrc.gov.cn/fzgggz/jjyx/zhdt/201405/t20140522_612456.html.
National Development and Reform Commission. Guidance of strengthening and improving the management of power generation operation adjustment. ([2014]985) [EB/OL].(2014 5 18). http:∥www.ndrc.gov.cn/fzgggz /jjyx/zhdt/201405/t20140522_612456.html.
[18] 国家电力监管委员会.关于促进电力调度公开、公平、公正的暂行办法(电监市场[2003] 46号). [EB/OL]. (2003 12 29).http:∥www.gov.cn/gongbao/content/2004/content_62904.htm.
State Electricity Regulatory Commission People’s Republic of China. pPromoting electric power dispatching interim measures of openness, fairness and justice ([2003]46).[EB/OL].[2003 12 29].http:∥www.gov.cn/gongbao/content/2004/content_62904.htm.
[19] 王娟娟,吕泉,李卫东,等. 电力市场环境下燃气轮机调峰交易模式研究[J]. 电力自动化设备,2014,34(1): 48-54.
WANG Juan juan, LV Quan, LI Wei dong, et al. Peak load regulation transaction mode for gas turbine in electricity market [J]. Electric Power Automation Equipment, 2014, 34(1): 48-52.
[20] 谢俊,李振坤,章美丹,等. 机组调峰的价值量化与费用补偿,电工技术学报,2013,28(1): 271-276.
XIE Jun,LI Zheng kun, ZHANG Mei dan,et al. Peaking value quantification and cost compensation for generators[J]. Transactions of China Electrotechnical Society, 2013, 28(1): 271-276.
[21] MOULIN H J. Fair division and collective welfare [M]. Cambridge: The MIT Press, 2003: 175-208.

No related articles found!