Please wait a minute...
Chinese Journal of Engineering Design  2000, Vol. 7 Issue (1): 6-10    DOI: 1006-754X(2000)01-0006-05
    
Design Integrated Pre calculation
Download: HTML     PDF(541KB)
Export: BibTeX | EndNote (RIS)      

Abstract  The authors pre senting a methodology for the design integrated precalculation of life cycle costs of products under consideration of cost targets.Besides the fundamental description of the method for a pre calculation of product costs the main emphasis lies on the specific adaptation of the methodology to the requirements of each phase of the life cycle of a technical product.

Published: 28 March 2000
Cite this article:

H.Weule , L.Trender , GE Zhong-Min, HUANG Jing-Yuan. Design Integrated Pre calculation. Chinese Journal of Engineering Design, 2000, 7(1): 6-10.

URL:

https://www.zjujournals.com/gcsjxb/1006-754X(2000)01-0006-05     OR     https://www.zjujournals.com/gcsjxb/Y2000/V7/I1/6


伴随开发的成本预算——按目标成本面向过程确定产品生命周期的成本

介绍一种按目标成本对产品生命周期成本的伴随开发的预算方法。除了描述预算产品成本的一般方法的框架条件外 ,其重点在于将其原理转移并专门适用于一个技术产品的各个生命阶段。

关键词: 产品生命周期成本,  计算,  目标成本; 
[[ 1]]   Spath, D. u. a. : Pro ze??-or ientierte Kostensch?? t zung in der Konstruktion dur ch Nutzung informationslog istischer Konzepte. In: Industr ie Management, Ausgabe EngineeringManagement. Ber lin: GITOVer l. 1998
[[ 2]]   Spath, D. u. a. : Hy pertex tbasier tes Informationssystem zur Unterstutzung des Life-Cycle-Design. ZWF 92( 1997) H. 12
No related articles found!