数字化与智能化设计 |
|
|
|
|
高性能液压缸数智化设计与制造平台的构建与应用 |
张伟1,3( ),胡晓平2( ),唐红涛1,张雁翔3,李西兴4 |
1.机器人与智能制造湖北省工程研究中心,武汉理工大学 机电工程学院,湖北 武汉 430070 2.武汉理工大学 科技合作与成果转化中心,湖北 武汉 430070 3.韶关液压件厂有限公司,广东 韶关 512000 4.湖北工业大学 机械工程学院,湖北 武汉 430068 |
|
Construction and application on high-performance hydraulic cylinder digital intelligent design and manufacturing platform |
Wei ZHANG1,3( ),Xiaoping HU2( ),Hongtao TANG1,Yanxiang ZHANG3,Xixing LI4 |
1.School of Mechanical & Electronic Engineering, Wuhan University of Technology, Wuhan 430070, China 2.Science &Technology Cooperation Center, Wuhan University of Technology, Wuhan 430070, China 3.Shaoguan Hydraulic Parts Factory Co. , Ltd. , Shaoguan 512000, China 4.School of Mechanical Engineering, Hubei University of Technology, Wuhan 430068, China |
引用本文:
张伟,胡晓平,唐红涛,张雁翔,李西兴. 高性能液压缸数智化设计与制造平台的构建与应用[J]. 工程设计学报, 2024, 31(1): 31-41.
Wei ZHANG,Xiaoping HU,Hongtao TANG,Yanxiang ZHANG,Xixing LI. Construction and application on high-performance hydraulic cylinder digital intelligent design and manufacturing platform[J]. Chinese Journal of Engineering Design, 2024, 31(1): 31-41.
链接本文:
https://www.zjujournals.com/gcsjxb/CN/10.3785/j.issn.1006-754X.2024.03.301
或
https://www.zjujournals.com/gcsjxb/CN/Y2024/V31/I1/31
|
1 |
王博.液压缸基础零件制造车间MES的研究与设计[D]. 南京: 南京理工大学,2017:2-3. WANG B. Research and design of MES in manufacturing workshop of hydraulic cylinder parts [D]. Nanjing: Nanjing University of Science and Technology, 2017: 2-3.
|
2 |
刘晨.液压油缸总装生产线规划与仿真研究[D]. 秦皇岛: 燕山大学,2014:7-8. LIU C. Planning and simulation study of hydraulic oil cylinders assembly line [D]. Qinhuangdao: Yanshan University, 2014: 7-8.
|
3 |
王长江. 液压元件及核心零部件行业分析报告[J].今日工程机械,2021(4):27-31. doi:10.3969/j.issn.1671-9018.2021.04.007 WANG C J. Industry analysis report of hydraulic components and core components [J]. Construction Machinery Today, 2021(4): 27-31.
doi: 10.3969/j.issn.1671-9018.2021.04.007
|
4 |
李宏宝. 中国挖掘机械及其核心液压件市场分析[J].液压气动与密封,2020,40(1):101-103. doi:10.3969/j.issn.1008-0813.2020.01.027 LI H B. Market analysis of excavating machinery and its core hydraulic components in China [J]. Hydraulics Pneumatics & Seals, 2020, 40(1): 101-103.
doi: 10.3969/j.issn.1008-0813.2020.01.027
|
5 |
杨华勇.智能制造与智能液压件的一些探索[J].液压与气动,2020(1):1-9. doi:10.11832/j.issn.1000-4858.2020.01.001 YANG H Y. Review of intelligent manufacturing and intelligent hydraulic components [J]. Chinese Hydraulics & Pneumatics, 2020(1): 1-9.
doi: 10.11832/j.issn.1000-4858.2020.01.001
|
6 |
FENG Y J. Integration model based on the integration of “CAD/CAPP/PLM/ERP” framework research [J]. Chemical Engineering Transactions (CET Journal), 2015, 46: 1111-1116.
|
7 |
MLECZKO J. Integration of CAD/PDM and ERP systems in practice [J]. Applied Mechanics and Materials, 2015, 791: 26-33.
|
8 |
王林苑. 铸造CAE数值模拟系统与CAD及ERP系统接口技术的研究[D]. 武汉:华中科技大学,2019:13-14. doi:10.30919/esmm5f239 WANG L Y. Research on interface technology of connecting foundry CAE numerical simulation system and CAD and ERP system [D]. Wuhan: Huazhong University of Science and Technology, 2019: 13-14.
doi: 10.30919/esmm5f239
|
9 |
秦红斌,孙齐,唐红涛,等.面向ERP与CAD集成的液压缸产品图库管理系统研究[J].机床与液压,2022, 50(13):102-106. doi:10.3969/j.issn.1001-3881.2022.13.019 QIN H B, SUN Q, TANG H T, et al. Research on the drawing management system of hydraulic cylinder product oriented to the integration of ERP and CAD [J].Machine Tool & Hydraulics, 2022, 50(13): 102-106.
doi: 10.3969/j.issn.1001-3881.2022.13.019
|
10 |
陈朝猛,王立洋,王元青.基于最小二乘法的自动钻铆工时预测研究[J].计算机技术与发展,2021,31(3): 206-210. doi:10.3969/j.issn.1673-629X.2021.03.036 CHEN C M, WANG L Y, WANG Y Q. Study on prediction of man-hour of automatic drilling and riveting based on least square method [J]. Computer Technology and Development, 2021, 31(3): 206-210.
doi: 10.3969/j.issn.1673-629X.2021.03.036
|
11 |
邱晓静. 基于神经网络的船舶设计工时测算方法实践[J]. 船舶标准化与质量,2020(1):21-25. doi:10.3969/j.issn.1007-9750.2020.01.006 QIU X J. Application of calculation method of ship design man hour based on neural network [J]. Shipbuilding Standardization & Quality, 2020(1): 21-25.
doi: 10.3969/j.issn.1007-9750.2020.01.006
|
12 |
刘俊玮. 基于数据分析的产品工时定额研究[D].上海:上海交通大学,2018:36-38. doi:10.1007/s12204-018-1946-5 LIU J W. Study the time quota of product based on data analysis [D]. Shanghai: Shanghai Jiaotong University, 2018: 36-38.
doi: 10.1007/s12204-018-1946-5
|
13 |
HUR M, LEE S, KIM B, et al. A study on the man-hour prediction system for shipbuilding [J]. Journal of Intelligent Manufacturing, 2015, 26(6): 1267-1279.
|
14 |
GOMEZ C D A, DIAZ R R E, CANTU O F J, et al. Data analysis and forecasting of the COVID-19 spread: a comparison of recurrent neural networks and time series models [J]. Cognit Comput, 2021, 13(2): 1-12.
|
15 |
BOUZID M, ALAYA I, TAGINA M. A new artificial bee colony algorithm using a gradual weight method for the bi-objective traveling salesman problems [J]. Evolutionary Intelligence, 2022, 15(3): 2077-2088.
|
16 |
杨佩莉,宋栓军,石雯丽.基于人工蜂群算法的柔性工艺规划方法研究[J].价值工程, 2016, 35(25): 298-300. YANG P L, SONG S J, SHI W L. Research on the flexible process planning based on artificial bee colony algorithm [J]. Value Engineering, 2016, 35(25): 298-300.
|
17 |
段建国,王彦森,谢楠. 基于时间向量的多工序加工系统工艺路线重组建模与优化[J].计算机集成制造系统,2020, 26(7): 1814-1823. DUAN J G, WANG Y S, XIE N. Modeling and optimization of process route reconfiguration in multi-stage machining system based on time vector [J]. Computer Integrated Manufacturing Systems, 2020, 26(7): 1814-1823.
|
18 |
ZHANG Y J, GE L L. Method for process planning optimization with energy efficiency consideration [J]. International Journal of Advanced Manufacturing Technology, 2015, 22(9): 2197-2207.
|
19 |
YI Q, LI C, ZHANG X, et al. An optimization model of machining process route for low carbon manufacturing [J]. The International Journal of Advanced Manufacturing Technology, 2015, 80(5): 1181-1196.
|
20 |
程海琴,曹华军,李洪丞,等.基于碳效益的零部件制造工艺决策模型及应用[J].计算机集成制造系统,2013, 19(8): 2018-2025. CHENG H Q, CAO H J, LI H C, et al. Decision-making model of mechanical components based on carbon benefit and its application[J]. Computer Integrated Manufacturing Systems, 2013, 19(8): 2018-2025.
|
21 |
李聪波,沈欢,李玲玲,等.面向能耗的多工艺路线柔性作业车间分批优化调度模型[J].机械工程学报,2017, 53(5):12-23. doi:10.3901/jme.2017.05.012 LI C B, SHEN H, LI L L, et al. A batch splitting flexible job shop scheduling model for energy saving under alternative process plans [J]. Journal of Mechanical Engineering, 2017, 53(5): 12-23.
doi: 10.3901/jme.2017.05.012
|
22 |
RAO R V, MORE K C, TALER J, et al. Dimensional optimization of a micro-channel heat sink using Jaya algorithm [J]. Applied Thermal Engineering, 2016, 103(25): 572-582.
|
23 |
唐红涛,张伟,张雁翔.面向高端液压缸离散制造的PLM/ERP/MES全生命周期管控平台构建与应用研究[J].机床与液压,2022,51(1):63-70. TANG H T, ZHANG W, ZHANG Y X. Research on the PLM/ERP/MES information integration platform construction and application for high-end hydraulic cylinder discrete manufacturing [J]. Machine Tool & Hydraulics, 2022, 51(1): 63-70.
|
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|