[1] 武照云,李丽,赵韩.并行产品开发的重叠模型及其仿真优化[J].计算机集成制造系统, 2011, 17(3): 552-559. WU Zhao-yun, LI Li, ZHAO Han. Overlapping model and simulation optimization in concurrent product development[J]. Computer Integrated Manufacturing Systems, 2011, 17(3): 552-559.
[2] 包北方,杨育,李雷霆.产品定制协同开发任务分配多目标优化[J].计算机集成制造系统,2014, 20(4): 739-746. BAO Bei-fang, YANG Yu, LI Lei-ting. Multi-objective optimization for task allocation of product customization collaborative development[J]. Computer Integrated Manufacturing Systems, 2014, 20(4): 739-746.
[3] 徐亮亮,唐敦兵,朱仁淼,等.设计需求与方案求解协同演化模型的形式化表达[J].工程设计学报, 2011, 18(1): 17-22. XU Liang-liang, TANG Dun-bing, ZHU Ren-miao, et al. Formalization of co-evolution model of design requirement and solution solving[J]. Chinese Journal of Engineering Design, 2011, 18(1): 17-22.
[4] 王娟茹,罗玲.知识共享行为、创新和复杂产品开发绩效[J].科学管理, 2015, 36(6): 37-45. WANG Juan-ru, LUO Ling. Knowledge sharing behaviors, innovation and development performance of complex products[J]. Science Research Management, 2015, 36(6):37-45.
[5] 贾军,张卓.复杂产品开发时间和开发团队交流优化模型及其应用研究[J].中国机械工程, 2013, 24(15): 2030-2035. JIA Jun, ZHANG Zhuo. Research on optimized model of development cycle and R & D team communication strategies and its application to complex product[J]. China Mechanical Engineering, 2013, 24(15):2030-2035.
[6] 吴庆鸣,李勇,周超.基于知识工程复杂产品开发过程的模型研究[J].工程设计学报, 2008, 15(5): 324-329. WU Qing-ming, LI Yong, ZHOU Chao. Research on model of complex product developing process based on knowledge based engineering[J]. Chinese Journal of Engineering Design, 2008, 15(5): 324-329.
[7] 马文建,刘伟,李传昭.并行产品开发中设计活动间重叠与信息交流[J].计算机集成制造系统, 2008, 14(4): 630-636. MA Wen-jian, LIU Wei, LI Chuan-zhao. Overlapping and communication frequency between activities within concurrent product development[J]. Computer Integrated Manufacturing Systems, 2008, 14(4): 630-636.
[8] 刘伟,刘严严.下游开发活动纳入上游开发活动动态信息研究[J].计算机集成制造系统,2011, 17(6): 1292-1297. LIU Wei, LIU Yan-yan. Incorporating dynamic information of upstream activities by downstream activities[J]. Computer Integrated Manufacturing Systems, 2011, 17(6): 1292-1297.
[9] 王志亮,张友良.藕合任务的重叠执行问题研究[J].计算机集成制造系统, 2006, 12(6): 947-954. WANG Zhi-liang, ZHANG You-liang. Research on overlapping of coupled activities[J]. Computer Integrated Manufacturing Systems, 2006, 12(6): 947-954.
[10] CALANTONE R J, DI BENEDETTO C A. Performance and time-to-market: accelerating cycle time with over-lapping stages[J]. IEEE Transactions on Engineering Management, 2000, 47(2): 232-244.
[11] BROWNING T R, EPPINGER S D. Modeling impacts of process architecture on cost and schedule risk in product development[J]. IEEE Transactions on Engineering Management, 2002, 49(4): 428-442.
[12] 徐岩,姜澄宇,郑洪源,等.并行工程中下游事件启动时刻研究[J].机械科学与技术, 2005, 24(1): 115-118. XU Yan, JIANG Deng-yu, ZHENG Hong-yuan, et al. A research on startup time of downstream phase in concurrent engineering[J]. Mechanical Science and Technology for Aerspace Engineering, 2005, 24(1): 115-118.
[13] 周雄辉,李祥,阮雪榆.注塑产品与模具协同设计任务规划算法研究[J].机械工程学报,2003, 39(2): 851-857. ZHOU Xiong-hui, LI Xiang, RUAN Xue-yu. Study on task plan algorithm for injection product and mold collaborative design[J]. Journal of Mechanical Engineering, 2003, 39(2): 581-857.
[14] 黄振东,肖人彬.求解带性能约束凸多边形布局的混合算法[J].华中科技大学学报(自然科学版),2014, 42(3): 47-51. HUANG Zheng-dong, XIAO Ren-bin. Hybrid algorithm for the convex polygon packing problem with constraints of equilibrium[J]. Journal of Huazhong University of Science and Technology (Natural Science Edition), 2014, 42(3): 47-51.
[15] 杨宝森,郑柯君,来玲.基于设计结构矩阵的复杂研发项目过程模型[J].系统仿真学报,2015, 27(9): 2187-2193. YANG Bao-sen, ZHENG Ke-jun, LAI Ling. Process model of complex R & D project based on design structure matrix[J]. Journal of System Simulation, 2015, 27(9): 2187-2193.
[16] SOSA M E, EPPINGER S D, ROWLES C M. The misalignment of product architecture and organizational structure in complex product development[J]. Management Science, 2004, 50(12): 1674-1689.
[17] GOKPINAR B, HOPP W J, IRAVANI S M R. The impact of misalignment of organizational structure and product architecture on quality in complex product development[J]. Management Science, 2010, 56(3): 468-484.
[18] 柴国荣,杜志坤,廖颖.含有迭代的复杂项目工期与工时计算[J].管理工程学报, 2014, 28(1): 166-170. CHAI Guo-rong, DU Zhi-kun, LIAO Ying. Calculation of cycle and working hours for complex projects with iterations[J]. Journal of Industrial Engineering and Engineering Management, 2014, 28(1): 166-170. |