保质设计 |
|
|
|
|
多约束条件下采煤机摇臂横向振动分析及试验验证 |
白杨溪1, 陈洪月1,2, 陈洪岩1, 王鑫2 |
1.辽宁工程技术大学 机械工程学院, 辽宁 阜新 123000 2.辽宁工程技术大学 矿产资源开发利用技术及装备研究院, 辽宁 阜新 123000 |
|
Analysis and test verification of transverse vibration of shearer rocker arm under multiple constraints |
BAI Yang-xi1, CHEN Hong-yue1,2, CHEN Hong-yan1, WANG Xin2 |
1.School of Mechanical Engineering, Liaoning Technical University, Fuxin 123000, China 2.Research Institute of Technology and Equipment for the Exploitation and Utilization of Mineral Resources, Liaoning Technical University, Fuxin 123000, China |
引用本文:
白杨溪, 陈洪月, 陈洪岩, 王鑫. 多约束条件下采煤机摇臂横向振动分析及试验验证[J]. 工程设计学报, 2020, 27(6): 707-712.
BAI Yang-xi, CHEN Hong-yue, CHEN Hong-yan, WANG Xin. Analysis and test verification of transverse vibration of shearer rocker arm under multiple constraints. Chinese Journal of Engineering Design, 2020, 27(6): 707-712.
链接本文:
https://www.zjujournals.com/gcsjxb/CN/10.3785/j.issn.1006-754X.2020.00.093
或
https://www.zjujournals.com/gcsjxb/CN/Y2020/V27/I6/707
|
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|