Please wait a minute...
Chinese Journal of Engineering Design  2003, Vol. 10 Issue (4): 224-228    DOI:
    
Mathem atical analysis of high-rise structure’s piles-raft foundation
 JIN  Zhen-Fen1, CHEN  Yun-Min2, GAN  Gang1
1.浙江大学建筑设计研究院,浙江杭州310027;
2.浙江大学岩土工程研究所,浙江杭州310027
Download: HTML     PDF(273KB)
Export: BibTeX | EndNote (RIS)      

Abstract  A method of piles-raft-soil’s cooperate reaction is distributed.The pile and soil under the plank are simplified into springs.The stiffness of piles is calculated from the P-S curve of single pile.The settlement of substratum is calculated by layer-wise summation method.The settlement in the whole foundation,the stress in the raft,the reaction force on the top of piles are analyzed.

Key wordspiles-raft foundation      degenerated element      finite element method      cooperate reaction     
Published: 28 August 2003
Cite this article:

JIN Zhen-Fen, CHEN Yun-Min, GAN Gang. Mathem atical analysis of high-rise structure’s piles-raft foundation. Chinese Journal of Engineering Design, 2003, 10(4): 224-228.

URL:

https://www.zjujournals.com/gcsjxb/     OR     https://www.zjujournals.com/gcsjxb/Y2003/V10/I4/224


高层主裙楼变厚度桩筏基础数值试验

提供了一种桩-土-筏相互作用的计算模型,将筏板下的桩、土看成弹簧作用在筏板上,简化得到了软弱地基群桩应力和沉降等效分析模型,提出了一种群桩中单桩沉降的计算方法,建立了群桩中单桩非线性刚度的计算模型,并采用三维退化层合单元法对高层建筑主裙楼桩筏基础进行分析.

关键词: 桩筏基础,  退化层合单元,  有限元法,  共同作用 
[1] HUANG Wei, LIU Wei-yi, LIU Zhi-en, LU Chi-hua. Structure optimization of experimental target vehicle chassis based on multi-objective genetic algorithm[J]. Chinese Journal of Engineering Design, 2021, 28(1): 80-88.
[2] PAN Yi-ming, YU Lan-feng, HAN Lu-nan, SHAN Yi-feng. Finite element analysis of telescopic head-bracket contact of mobile car machine[J]. Chinese Journal of Engineering Design, 2019, 26(3): 315-320.
[3] SUN Qi-chen, JI Jie, QIN Jun-jie, LAI Xiao-ming. Research on unlockable servo stabilizer on lunar sampling drill[J]. Chinese Journal of Engineering Design, 2018, 25(6): 735-740.
[4] TANG Hua-ping, ZENG Li, WANG Sheng-ze, CHEN Hao-sen. Design of roll-over protective structure for heavy mining dumper based on topology optimization[J]. Chinese Journal of Engineering Design, 2018, 25(3): 295-301.
[5] DENG Xing, YU Lan-feng, LEI Cong, XU Jiang-ping, XIAO Ze-ping. Research on contact problem of trackless telescopic gantry crane[J]. Chinese Journal of Engineering Design, 2018, 25(1): 79-84,93.
[6] HUANG Zhi-qiang, PENG Xun, LI Gang. Analysis of multi-frequency response of vibroseis vibrator baseplate[J]. Chinese Journal of Engineering Design, 2017, 24(6): 648-654.
[7] REN Li-hui, JIAO Yong-shu, QI De-xuan. Numerical analysis on ultimate bearing capacity of spudcan of jack-up platform in two-layered clay[J]. Chinese Journal of Engineering Design, 2017, 24(4): 425-432.
[8] LUO Yan-yan, YANG Jing-yu, REN Yong-long, ZHANG Yuan-lei, LI Wen-jun. Simulation and experimental study on plug and pull characteristic of electrical connector contact[J]. Chinese Journal of Engineering Design, 2017, 24(2): 168-173,195.
[9] HU Jun-feng, HAO Ya-zhou, ZHENG Chang-hu. Robust optimization design of a precise micromanipulation stage for reducing temperature effect[J]. Chinese Journal of Engineering Design, 2015, 22(6): 581-588.
[10] MAO Jun, DONG Xian-rui, XIE Miao, BAI Ya-jing, XIE Chun-xue. Contact dynamics characteristic analysis on chain transmission system of scraper conveyer[J]. Chinese Journal of Engineering Design, 2015, 22(5): 445-451.
[11] HU Jun-feng, HAO Ya-zhou, XU Gui-yang, YANG Jian. Modeling and performance analysis of a micromanipulation stage considering temperature effects[J]. Chinese Journal of Engineering Design, 2015, 22(2): 143-154.
[12] AN Jing,WU Yi-hui. Common mode radiation analysis and suppression of electronic control system for attitude-control flywheel[J]. Chinese Journal of Engineering Design, 2014, 21(3): 240-244.
[13] YI Sheng-Xian, ZHAO Jun-Sheng, YIN Qing. Research on effect of structure parameters on dynamic characteristic for floating ring bearing[J]. Chinese Journal of Engineering Design, 2013, 20(6): 512-516.
[14] CAO Zhou-Hong, LIAN Ji-Jian, LIU Xiao-Ping. Finite element simulation of a castle structure and influence of the construction procedure on the floor stress[J]. Chinese Journal of Engineering Design, 2013, 20(4): 326-331.
[15] WANG Guo-Li, HUANG Xiao-Hai, LIU Shu-Hui, LI Qing-Wei. Fatigue simulation and structure optimization of suspension stabilizer link bracket[J]. Chinese Journal of Engineering Design, 2013, 20(1): 18-21.