Whole Machine and System Design |
|
|
|
|
Research of the freight ropeway trolley based on the lever reinforcement mechanism |
CHEN Zi-long1, JING Wen-chuan2, YU Rong1, HE Chao-ming1 |
1. School of Mechanical Engineering, Southwest Jiaotong University, Chengdu 610031, China;
2. Sichuan Electric Power Transmission Substation Construction Company, Chengdu 610051, China |
|
|
Abstract With the rapid development of power industry in our country, the material transportation in the process of the transmission line construction is getting more and more attention. As a new mode of transportation in transmission line, the freight ropeway has been widely used in the transmission line construction with its low cost, convenient construction and not being affected by the climate and other advantages. In the domestic freight ropeway, the fixed rope clips based on bolt is widely adapted, and the action of hanging or offing the cable is always realized by human. So the work efficiency and the economic efficiency are low. The structure of the trolley was optimized, lever reinforcement mechanism was applied to magnify the weight of the bearing body of the trolley which could realize the automatic hanging the cable and could realize the automatic offing the cable based on the weight of the fixed grip body of the trolley. The experiment shows that the optimized trolley can be applied in the complex environment of the workplace, and further reduce the cost.
|
Received: 23 November 2015
Published: 28 June 2016
|
|
基于杠杆增力机构的货运索道小车研究
随着我国电力建设的不断发展,输电线路施工过程中的货物运输越来越受到重视.索道运输作为一种新的运输方式,拥有成本低、施工方便并不受气候影响等诸多优点,已经得到了广泛应用.国内货运索道大多数采用基于螺栓的固定式抱索器,而且多采用人工进行行走小车的脱挂索动作,因此工作效率较低,经济效益不高.对行走小车结构进行优化,将杠杆增力机构应用于小车结构中,使得小车的挂重车体自身重量放大,实现行走小车的自动挂索;在抱索车体的自重下实现自动脱索.经实验证明,优化后的行走小车能够应用于环境复杂的工作场所,并且能够进一步降低成本.
关键词:
货运索道,
小车,
抱索器,
杠杆增力机构,
经济效益
|
|
[1] 胡亮,黄涛涛,关绍峰.探讨输电线路施工中索道的应用[J].广东科技,2012,12(24):53-54. HU Liang,HUANG Tao-tao,GUAN Shao-feng.Discussing the application of the ropeway in the transmission line construction[J].Guanngdong Science and Technology,2012,12(24):53-54.
[2] 李恒斌.可摘挂式抱索器结构设计及性能优化研究[D].长沙:中南大学机电工程学院,2011:8-12. LI Heng-bin.The removable hanging rope clips structure design and performance optimization research [D].Changsha:Central South University,College of Mechanical and Electrical Engineering,2011:8-12.
[3] 稽焕章.国外几种货运施工索道悬索理论计算模型研究[J].起重运输,1988(3):13-17. JI Huan-zhang.Study on the theoretical models of the foreign several freight construction cableway suspension cable[J].Lifting Transportation,1988(3):13-17.
[4] 杨义勇,江擒虎.新型架空索道脱挂式抱索器的研究设计[J].新技术 新工艺,2000(8):21-23. YANG Yi-yong,JIANG Qin-hu.Study on new type of aerial ropeway hanging rope clips off[J].Journal of New Technology and New Process,2000(8):21-23.
[5] 牛国栋.电网施工索道运输技术的研发及应用[J].科技兴电,2010(6):37-38. NIU Guo-dong.Cableway transportation technology research and development and application of power grid construction [J].Electric Science and Technology,2010(6):37-38.
[6] 闻邦椿,陈良玉,巩云鹏.机械设计手册:第2卷 机械零部件设计(连接、紧固与传动)[M].北京:机械工业出版社,2010:(5-16)-(5-17). WEN Bang-chun,CHEN Liang-yu,GONG Yun-peng.Mechanical design manual:volumn 2,mechanical parts design (connection,fastening and drive) [M].Beijing:China Machine Press,2010:(5-16)-(5-17).
[7] 李靖.货运索道自动化关键技术研究与应用[D].成都:西南交通大学机械工程学院,2014:18-22. LI Jing.Freight ropeway automation key technology research and application[D].Chengdu:Southwest Jiaotong University,College of Mechanical Engineering,2014:18-22.
[8] 邓战光,蔡敢为,李兆军.含螺栓预紧力的汽车钢圈强度分析[J].机械设计与制造,2009(8):219-220. DENG Zhan-guang,CAI Gan-wei,LI Zhao-jun.The car rims strength analysis with bolt pre-tightening force[J].Machinery Design and Manufacture,2009(8):219-220.
[9] 稽焕章.抱索器钳口与牵引索之间摩擦系数的研究[J].化工矿山技术,1989,18(5):41-43. JI Huan-zhang.The research of the coefficient of friction between the rope-grip and the traction rope[J].Journal of Chemical Mining Technology,1989,18(5):41-43.
[10] 湖南省煤炭科学研究所.煤矿固定抱索器架空乘人装置技术条件:MT/T 873—2000[S].北京:煤炭工业出版社,2000:1-4. Hunan Coal Science Research Institute.General specifications for the aerial passenger device with fixed grip in coal mining:MT/T 873—2000[S].Beijing:China Coal Industry Publishing Home,2000:1-4.
[11] 稽焕章.客运索道脱挂式抱索器的剖析与计算[J].中国索道,2002,2(4):23-29. JI Huan-zhang.The analysis and calculation of the hanging rope clips off of the passenger ropeway[J].Journal of China Cableway,2002,2(4):23-29.
[12] SUN Yu-jun,HAN Yi-shi,PENG Shao-bing.Environmental impact of ropeway on tourist resorts and its management[J].Journal of Beijing Forestry University,2001,23(3):97-100.
[13] 程军,写义明,王宇.矿用索道固定抱索器夹紧力与力矩确定[J].煤炭科学技术,2013(10):102-104. CHENG Jun,XIE Yi-ming,WANG Yu.Mine cableway fixed rope clips clamping force and moment[J].Coal Science and Technology,2013(10):102-104.
[14] 王素芬.对螺栓拧紧方法的探讨[J].安装,1997(6):1-2. WANG Su-fen.Discussing the bolt tightening method[J].Installation,1997(6):1-2.
[15] 汪华葆.螺纹联接的拧紧力矩及预紧力控制[J].机械工程师,1997(5):6-7. WANG Hua-bao.The tightening torque and pre-tightening force control of the threaded connection[J].Mechanical Engineers,1997(5):6-7.
[16] 郭瑞洁,钟康民.基于铰杆-杠杆串联增力机构的内夹持气动机械手[J].液压与气动,2009(1):55-56. GUO Rui-jie,ZHONG Kang-min.The clamping pneumatic manipulator based on the hinge bar-leverage spries power agency[J].Chinese Hydraulics & Pneumatics,2009(1):55-56.
[17] 陈志嵩,钟康民.铰杆-杠杆串联机构分析及其应用[J].机械设计,2010(1):57-58. CHEN Zhi-song,ZHONG Kang-min.The analysis and application of the hinge bar-leverage spries power agency[J].Journal of Machine Design,2009(1):57-58. |
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|