工程设计理论、方法与技术 |
|
|
|
|
加大计划投入缩短开发周期——含综合评价系统的要求清单 |
K.H.Beelich, E.Schneider, 陈巍, 葛中民 |
达姆施塔特工业大学; 杭州汽轮动力集团公司; 清华大学精仪系 |
|
Increased Planning Effort to Reduce Development Times List of Requirements with Integrated Evaluation System |
K.H.Beelich , E.Schneider , CHEN Wei, GE Zhong-Min |
引用本文:
K.H.Beelich, E.Schneider, 陈巍, 葛中民. 加大计划投入缩短开发周期——含综合评价系统的要求清单[J]. 工程设计学报, 2000, 7(2): 5-9.
K.H.Beelich , E.Schneider , CHEN Wei, GE Zhong-Min. Increased Planning Effort to Reduce Development Times List of Requirements with Integrated Evaluation System[J]. Chinese Journal of Engineering Design, 2000, 7(2): 5-9.
链接本文:
https://www.zjujournals.com/gcsjxb/CN/
或
https://www.zjujournals.com/gcsjxb/CN/Y2000/V7/I2/5
|
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|