Please wait a minute...
Front. Inform. Technol. Electron. Eng.  2014, Vol. 15 Issue (11): 1035-1047    DOI: 10.1631/jzus.C1400030
    
Generation maintenance scheduling based on multiple objectives and their relationship analysis
Jun-peng Zhan, Chuang-xin Guo, Qing-hua Wu, Lu-liang Zhang, Hong-jun Fu
College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China; Department of Electrical Engineering and Electronics, University of Liverpool, Liverpool L69 3GJ, UK; School of Electric Power Engineering, South China University of Technology, Guangzhou 510640, China; Power Dispatch and Control Center, Henan Electric Power Company, Zhengzhou 450052, China
Download:   PDF(0KB)
Export: BibTeX | EndNote (RIS)      

Abstract  In a market environment of power systems, each producer pursues its maximal profit while the independent system operator is in charge of the system reliability and the minimization of the total generation cost when generating the generation maintenance scheduling (GMS). Thus, the GMS is inherently a multi-objective optimization problem as its objectives usually conflict with each other. This paper proposes a multi-objective GMS model in a market environment which includes three types of objectives, i.e., each producer’s profit, the system reliability, and the total generation cost. The GMS model has been solved by the group search optimizer with multiple producers (GSOMP) on two test systems. The simulation results show that the model is well solved by the GSOMP with a set of evenly distributed Pareto-optimal solutions obtained. The simulation results also illustrate that one producer’s profit conflicts with another one’s, that the total generation cost does not conflict with the profit of the producer possessing the cheapest units while the total generation cost conflicts with the other producers’ profits, and that the reliability objective conflicts with the other objectives.

Key wordsGeneration maintenance scheduling      Market environment      Multi-objective optimization     
Received: 31 January 2014      Published: 07 November 2014
CLC:  TM732  
Cite this article:

Jun-peng Zhan, Chuang-xin Guo, Qing-hua Wu, Lu-liang Zhang, Hong-jun Fu. Generation maintenance scheduling based on multiple objectives and their relationship analysis. Front. Inform. Technol. Electron. Eng., 2014, 15(11): 1035-1047.

URL:

http://www.zjujournals.com/xueshu/fitee/10.1631/jzus.C1400030     OR     http://www.zjujournals.com/xueshu/fitee/Y2014/V15/I11/1035


基于多目标及其关系分析的发电检修计划

两个发电商的利益最大化之间存在冲突。其一,每个发电商倾向于将其拥有的机组在电价最低的时候进行检修,但每周可以检修的最大容量有限;其二,每个发电商倾向于发更多电,但每天的负荷固定不变。此外,系统可靠性目标与其他目标也构成冲突关系。为此,在电力市场环境下的发电检修计划中,考虑不同发电商的利益最大化,同时考虑电力系统的可靠性最大化。对多个目标同时进行优化,并分析不同目标之间的关系。提出一种更适于进化算法求解的发电检修计划模型,提高了求解效率。分析了电力市场环境下发电检修计划中不同目标之间的关系及其成因。为使发电检修计划模型更适于被进化算法求解,发电机组的检修变量采用整数编码,在线状态变量和启动状态变量均转化成为由机组出力变量表示的中间变量。对此多目标优化模型,采用带有多发现者的群搜索优化算法(GSOMP)求解。仿真分析表明拥有最便宜机组的发电商的利益最大化目标与系统总发电费用目标并不构成冲突。本文提出的系统可靠性目标函数,在高、低负荷时段均有利于保持一定的备用容量。

关键词: 发电检修计划,  市场环境,  多目标优化 
[1] Xin Li, Jin Sun, Fu Xiao, Jiang-shan Tian. An efficient bi-objective optimization framework for statistical chip-level yield analysis under parameter variations[J]. Front. Inform. Technol. Electron. Eng., 2016, 17(2): 160-172.