列车控制中心系统多态可靠性分析
|
|
吴限,祁文哲,齐金平,彭甜,于强业
|
Multi-state reliability analysis of train control center system
|
|
Xian WU,Wenzhe QI,Jinping QI,Tian PENG,Qiangye YU
|
|
| 表6 列控中心系统根节点多态后验概率 (of train control center system) |
| Table 6 Polymorphic posterior probability of root nodes |
|
| 编号 | 0.5 | 1 |
|---|
| 0.5 | 1 | 0.5 | 1 |
|---|
| x1 | 0.182 0 | 0.165 5 | 0.086 5 | 0.172 0 | | x2 | 0.033 8 | 0.046 6 | 0.015 6 | 0.032 8 | | x3 | 0.078 1 | 0.045 8 | 0.033 6 | 0.080 1 | | x4 | 0.036 6 | 0.034 2 | 0.019 5 | 0.038 6 | | x5 | 0.036 6 | 0.034 2 | 0.019 5 | 0.038 6 | | x6 | 0.036 6 | 0.034 2 | 0.019 5 | 0.038 6 | | x7 | 0.058 6 | 0.041 4 | 0.036 4 | 0.064 6 | | x8 | 0.263 0 | 0.141 6 | 0.130 2 | 0.242 0 | | x9 | 0.323 0 | 0.336 3 | 0.144 0 | 0.293 0 |
|
|
|