列车控制中心系统多态可靠性分析
吴限,祁文哲,齐金平,彭甜,于强业

Multi-state reliability analysis of train control center system
Xian WU,Wenzhe QI,Jinping QI,Tian PENG,Qiangye YU
表6 列控中心系统根节点多态后验概率 (of train control center system)
Table 6 Polymorphic posterior probability of root nodes
编号0.51
0.510.51
x10.182 00.165 50.086 50.172 0
x20.033 80.046 60.015 60.032 8
x30.078 10.045 80.033 60.080 1
x40.036 60.034 20.019 50.038 6
x50.036 60.034 20.019 50.038 6
x60.036 60.034 20.019 50.038 6
x70.058 60.041 40.036 40.064 6
x80.263 00.141 60.130 20.242 0
x90.323 00.336 30.144 00.293 0