考虑动态客运量的地铁车辆部件预防性维修策略
高纪宁,王红,何勇,张启真,权海锐

Preventive maintenance strategy for metro vehicle component considering dynamic passenger capacity
Jining GAO,Hong WANG,Yong HE,Qizhen ZHANG,Hairui QUAN
表2 不同优化倾向下的维修计划对比
Table 2 Comparison of maintenance plans under different optimization orientations
优化倾向维修周期/d维修时机对应客运区间的αk维修方式维修时间talt/h维修成本C/元
维修成本C680.87-0.98-1.13-0.97-0.700-0-0-0-135.0122 852
维修时间talt480.98-0.76-0.98-1.13-1.16-0.97-0.700-1-1-1-1-1-132.2524 497