运营高铁无砟轨道用新型绳锯切割设备的研制 |
刘立业,陈占,何新辉,朱江江,吴响响 |
Development of new rope saw cutting equipment for ballastless track of high-speed railway in operation |
Liye LIU,Zhan CHEN,Xinhui HE,Jiangjiang ZHU,Xiangxiang WU |
图7 张紧系统结构组成 |
Fig.7 Structure composition of tension system |
![]() |