Please wait a minute...
工程设计学报  2011, Vol. 18 Issue (1): 48-52    
工程设计理论、方法与技术     
露天矿山三维设计方法应用研究
 杨彪, 罗周全, 陆广, 鹿浩, 张旭芳
中南大学 资源与安全工程学院,湖南 长沙 410083
Application research of three-dimensional design method in surface mine
 YANG  Biao, LUO  Zhou-Quan, LU  Guang, LU  Hao, ZHANG  Xu-Fang
School of Resources and Safety, Central South University, Changsha 410083, China
 全文: PDF(3496 KB)   HTML
摘要: 针对传统露天矿山开采设计采用二维方式的不直观、低效率等缺点,提出了露天矿山的全三维设计方法.首先以矿业三维软件为平台创建矿床地质模型,利用统计学方法进行品位赋值,形成地质品位计算模型,在此基础上利用三维有限元计算方法进行开采境界边坡角及边坡台阶组合参数优化研究.借助境界圈定及三维排产程序进行采剥方案、生产规模、开采境界、边界品位等矿山关键决策项目的整体优化,最后根据优化结果布置开拓系统,实现露天矿山的设计流程全三维化.将该方法在某矿山设计中进行了应用,结果表明,基于三维可视化的设计方法具有工作效率高、计算精准的优点,有较强的应用推广价值.
关键词: 露天矿山三维设计矿床模型整体优化    
Abstract: In hoping to overcome the shortcomings of the unintuitive and inefficient defects in traditional two dimension approach, this paper proposed a three dimension design method for open pit mine. Firstly, it created a deposit geological model with three-dimensional mine software, assigned the grade by using geo-statistical method, and then obtained geological grade model. On this basis, using 3D finite element method, the study on optimizing the slope angle of mining limit and combining parameters of slope bench was performed. And in the virtue of limit definition and 3D schedule procedure, the integral optimization of the whole system in the aspects of deposit schedule, production scope, mining limit and limit grade was achieved. Finally, according to the optimization result, the development system was arranged properly, and three dimensions design of the full flow was realized. Through applying the approach in one mining design, the result shows that three-dimensional visualization method has the advantages of high efficiency, precise calculation, and strong application value.
Key words: surface mine    three-dimensional design    deposit model    integral optimization
出版日期: 2011-02-28
CLC:  TD 216  
基金资助:

“十一五”国家科技支撑计划资助项目(2007BAK22B04-12)

服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  
杨彪
罗周全
陆广
鹿浩
张旭芳

引用本文:

杨彪, 罗周全, 陆广, 鹿浩, 张旭芳. 露天矿山三维设计方法应用研究[J]. 工程设计学报, 2011, 18(1): 48-52.

YANG Biao, LUO Zhou-Quan, LU Guang, LU Hao, ZHANG Xu-Fang. Application research of three-dimensional design method in surface mine. Chinese Journal of Engineering Design, 2011, 18(1): 48-52.

链接本文:

https://www.zjujournals.com/gcsjxb/CN/        https://www.zjujournals.com/gcsjxb/CN/Y2011/V18/I1/48

[1] 魏连江,方宗武,王红胜.三维可视化技术在矿山开采辅助设计中的应用研究[J].矿业工程,2006,4(3):61.

WEI Lian-jiang, FANG Zong-wu, WANG Hong-sheng. Application study of 3D visualization in the aided design of mining [J]. Mining Engineering,2006,4(3):61.

[2] 李光强,李姣姣,邓敏.矿山三维实体类型及建模方法[J].金属矿山,2008,12:124-125.

WANG Guangqiang, LI Jiao-jiao, DENG Min. Classification and modeling of 3D mine entities [J]. Metal Mine,2008,12:124-125.

[3] FRIMPONG S,ASA E,SZYMANSKI J. Advances in open pit mine design and optimization research [J]. International Journal of Surface Mining, Reclamation and Environment,2002,16(2):134-143.

[4] 李肖锋,邓华梅,袁海平.数字化矿山三维空间模型的建立与研究[J].矿业快报,2008,12:31-33.

LI Xiao-feng, DENG Hua-mei, YUAN Hai-ping. Establishment and research on three-dimensional spatial model of digitized mine [J]. Express Information of Mining Industry,2008,12:31-33.

[5] 游安弼,蔡嗣经.基于几何模型技术的矿山三维建模研究[J].中国矿业,2006,15(8):51-53.

YOU An-bi, CAI Si-jing . A study of 3D mine modeling based on geometrical modeling [J]. China Mining Magazine,2006,15(8):51-53.

[6] 李一帆, 李枫,王慧萍.三维可视化技术在矿山工程中的应用[J].中国钨业,2009,24(1):24-26.

LI Yi-fan, LI Feng, WANG Hui-ping. Applications of 3D visualization technology in mining[J]. China Tungsten Industry,2009,24(1):24-26.

[7] 耿铭,卢国斌,王朕.数字化矿山三维仿真技术的研究[J].现代矿业,2009,8:57-59.

GENG Ming, LU Guo-bin, WANG Zhen. Research on three-dimensional simulation technique of digitized mine [J]. Modern Mining,2009,8:57-59.

[8] 罗周全,吴亚斌,刘晓明,等.基于SURPAC的复杂地质体FLAC^3D模型生成技术[J].岩土工程,2008,29(5):1334-1338.

LUO Zhou-quan, WU Ya-bin, LIU Xiao-ming. FLAC^3D modeling for complex geologic body based on SURPAC [J]. Rock and Soil Mechanics, 2008,29(5):1334-1338.                        [9] 侯恩科,吴立新,李建民,等.三维地学模拟与数值模拟的耦合方法研究[J].煤炭学报,2002,27(4):388-392.

HOU En-ke, WU Li-xin, LI Jian-min, et al. Study on the coupling of 3D geosciencesmodeling with numerical simulation[J]. Journal of China Coal Society, 2002,27(4):388-392.

[10] 冯锦艳,王金安,蔡美峰.露天高陡边坡角优化设计及稳定性分析[J].中国矿业,2005,14(4):45-48.

FENG Jin-yan, WANG Jin-an, CAI Mei-feng. UDY on the optimization of the slope angle and ability of high EEP open pit slope [J]. China Mining Magazine,2005,14(4):45-48.

[11] 王青,王智静.露天开采整体优化——理论、模型与算法[M].北京: 冶金工业出版社,2000:1-6,4142.

WANG Qing, WANG Zhi-jing.The theory, model and arithmetic in open mines whole optimization [M].Beijing:Metallurgical Industry Press,2000:1-6,41-42,.

[12] 张幼蒂,尚涛,陈树召.现代露天矿设计的系统综合优化[J].金属矿山,2006,8(增刊):16.

ZHANG You-ti, SHANG Tao, CHEN Shu-zhao. Comprehensive optimization for the design of modern surface mining system [J]. Metal Mine,2006,8(Supplement):1-6.

[13] BYE Alan.The development and application of a 3D geotechnical model for mining optimization [J].2005 SME Annual Meeting: Got Mining-Preprints. Barcelona-Spain, 2005:651-660.

[14] 杨彪,罗周全,廖江南,等.露天矿山开采境界动态优化圈定[J].煤炭学报,2010, 35 (3): 368-372.

YANG Biao, LUO Zhou-quan, Liao Jiang-nan. Dynamic optimization for open pit mining limit [J]. Journal of Coal Science and Engineering,2010, 35 (3): 368-372.

[15] 郑友毅, 王青, 顾晓薇.露天煤矿开采计划的整体动态优化[J].煤炭学报,2009,34(8):1054-1056.

ZHENG You-yi, WANG Qing, GU Xiao-wei. Overall dynamic optimization of production schedule in open pit coal mine [J]. Journal of Coal Science and Engineering,2009, 34(8): 1054-1056.
No related articles found!