考虑互联网数据中心灵活调度的柔性配电网运行优化方法
|
|
高本瑞,于仲安,陈锋升,王梓耀,潘振宁
|
Flexible distribution network operation optimization method incorporating flexible Internet data center scheduling
|
|
Benrui GAO,Zhongan YU,Fengsheng CHEN,Ziyao WANG,Zhenning PAN
|
|
| 表 5 303节点鲁棒优化仿真结果对比 |
| Tab.5 Simulation results comparison of 303 bus robust optimization |
|
案 例 | 工作 负载 | 只考虑配电网运行成本(w1=1) | | 只考虑IDC购电成本(w2=1) | | 考虑整体成本(w1=w2=0.5) | | Cvol/kV | Ccut/(kW·h) | Cidc/千元 | ΔUmax/% | | Cvol/kV | Ccut/(kW·h) | Cidc/千元 | ΔUmax/% | | Cvol/kV | Ccut/(kW·h) | Cidc/千元 | ΔUmax/% | | 1 | 1 | 1 270.92 | 33.05 | 29.79 | 0.79 | | 3 691.90 | 1.4×105 | 18.59 | 2.45 | | 1 281.52 | 44.06 | 24.55 | 0.79 | | 2 | 1 278.94 | 40.37 | 34.34 | 0.78 | | 3 736.81 | 1.4×105 | 21.04 | 2.52 | | 1 300.58 | 46.95 | 27.97 | 0.79 | | 2 | 1 | 1 270.90 | 35.58 | 29.68 | 0.53 | | 3 898.38 | 1.6×105 | 18.59 | 0.55 | | 1 282.81 | 44.41 | 24.57 | 0.53 | | 2 | 1 279.90 | 41.45 | 34.22 | 0.53 | | 3 978.31 | 1.5×105 | 21.04 | 0.55 | | 1 302.30 | 46.71 | 27.96 | 0.53 | | 3 | 1 | 1 383.11 | 25.71 | 35.12 | 0.53 | | 3 825.78 | 1.5×105 | 20.82 | 0.55 | | 1 412.78 | 28.99 | 27.09 | 0.53 | | 2 | 1 279.91 | 41.45 | 34.26 | 0.53 | | 3 963.65 | 1.5×105 | 21.11 | 0.55 | | 1 302.30 | 46.71 | 27.96 | 0.53 | | 4 | 1 | 599.79 | 0 | 29.91 | 0.38 | | 2 945.16 | 9.9×104 | 20.82 | 0.55 | | 616.29 | 0 | 24.55 | 0.38 | | 2 | 592.43 | 0 | 29.62 | 0.35 | | 3 419.02 | 1.1×105 | 21.10 | 0.55 | | 604.24 | 0 | 24.88 | 0.35 |
|
|
|