基于多目标优化的复杂热电联产系统运行规划
陈坚红,王国雲,左克清,张洪坤,鲍彦克

Operation planning of complex combined heat and power systems based on multi-objective optimization
Jianhong CHEN,Guoyun WANG,Keqing ZUO,Hongkun ZHANG,Yanke BAO
图 12 热电厂各机组在24 h内的低压抽汽量运行规划曲线
Fig.12 Operation planning curves of low-pressure steam extraction volume for each unit of thermal power plant over a 24-hour period